Download Presentation The PPT/PDF document "New ALARA" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
New ALARA recommendationsproposed by the ALARA REVIEW WORKING GROUP (ARWG)
Heinz Vincke on behalf of ARWGLS1 committee meeting 24.05.2013
1Slide2
Classification of interventions in radiation areas until now - 5 criteria, 3 levels
ALARA procedures – 3 levels: If the rad. risk is low <>
very light procedure
If it is medium
<> an optimization effort is
required
If it is
high <> an optimization effort is required, the procedure will be submitted to and presented at the ALARA committee
2Slide3
Retour d’experience until 2011/2012Many positive examples
prove that job optimization (reduction in dose to personnel) was, is and has to remain the main goal. But All DIMR Level III
are prepared, not all DIMR Level II
ALARA criteria are questioned No coherent approach in A&T departments and LHC experiments for Level I interventions
RP act(ed) as
“
owner
” of DIMRsFollow-up of recommendations not systematically doneNo clear guidelines for waiving ALARA committees meetings....
3
DIMR = Dossier d’
Intervention en M
ilieu RadioactifSlide4
ALARA ReviewWorking Group
MEMBERS:Chair: H. Vincke (DGS/RP)Sc. Sec.:
T. Wijnands (EN/HDO)RP (including RP group leader)
RSOs from all departments and from the LHC experiments (GLIMOS from ATLAS repl. ATLAS RSO) ‘experts/user’ R. Catherall I. EfthymiopoulosP
. Bonna
l
4Slide5
ARWG was expected to deliver:Proposal for
ALARA criteriaProposal on how to initiate, to follow up and to archive the DIMRs (for all three levels)Proposal of guidelines for presentations to the ALARA committeeProposal of
procedure waiving an ALARA committee meeting
5Slide6
ALARA criteria6ALARA CriteriaSlide7
ALARA criteria and levels at CERN:
7
ALARA Criteria
risk assessment required ->
RSO and RP decide on ALARA Level
5 mSv
h
ard limits
old
newSlide8
DIMR & WDPDossier d’Intervention en Milieu Radioactif & Work and Dose Planning
8DIMR & WDPSlide9
9DIMR & WDP
2006-2008:
DIMR
(Dossier d’Intervention en Milieu Radioactif)
Started in 2009:
DIMR
based on a
SharePoint site – …. to edit and store work and dose planning documents
Create a new work and dose planning folderCreate a new work and dose planning documentCreate a new radiological work permitSlide10
IMPACT - DIMR & WDPIMPACT (
Intervention Management Planning & Activity Coordination
Tool), is a general tool to manage work and activities + related aspects, i.e. planning, infrastructure, co-activities, permits, requests and documentation.
ARWG also strongly supported the idea to use IMPACT for DIMRs and they have been implemented into IMPACT already
10
DIMR & WDPSlide11
Formal ApproachAll work needs to be announced to superintendent
(Work Planning coordinators for experiments) RP, RSOs/GLIMOS and the superintendents (Work Planning coordinators for experiments) check the list of works and make a ‘first’ DIMR level classification.
DIMR Level 1:
Work planning by maintenance/repair teamIMPACT no documented WDP neededApproval by RSSO/RPEDIMR Level 2 and 3:Work and dose planning by maintenance/repair team, RP and RSO/RSSO
Approval by department GL, RSO, RP for DIMR Level II
If DIMR Level 3 -> ALARA Committee
IMPACT with DIMR
11LHC experiments apply DIMR/WDP also for Level 1 – integrated into the access request DIMR & WDPSlide12
DIMR & WDPRP=DGS/RPSlide13
Guidelines for presentations in the ALARA committee meeting13ALARA CommitteeSlide14
Guidelines for presentations in the ALARA committeeShort description
of intervention and the type (planned, unanticipated, urgent unanticipated)Justification of intervention & consequences in case the intervention does not take place
Put the intervention
into context using events in the past (if applicable). Similar activities on the same installation, REX, etc.Last maintenance performedEnvisaged revisions or replacements in the future
Presentation of the DIMR
–
should contain at least :
Detailed description of major steps of the intervention and the time estimatesResults of mock-up tests and dry-runs (if applicable) justifying the estimated times and working methodsMeasures that have been retained to optimize the intervention (remote handling, local shielding etc …..)Summary of the optimization measures
that were considered but not retainedPresent the ALARA parameters for the optimized and for the non-optimized version of the DIMRAssessment of risks of accidents and incidents and measures that have been taken to minimize these risks
Summary of the intervention
14
ALARA CommitteeSlide15
Waiving of an ALARA committee meeting15ALARA CommitteeSlide16
Waiving of the ALARA committee meetingCircumstancesRepetitive intervention
A procedure has been worked out under which circumstances a waiving of the ALARA committee meeting could be possible – valid for interventions approved already once in the ALARA committee. Urgent maintenance/repair
Suggestion: generic
DIMRs should be worked out and approved a priori in an ALARA committee meeting.16
ALARA CommitteeSlide17
…in case of waivingWaiving of the ALARA committee meeting has to be recorded This
action shall also be noted in the DIMR. The outcome will be presented in the next Radiation Safety Officer Committee (RSOC) meeting... and summarized in the next ALARA committee meeting.
17Slide18
The ARWG discussed and looked into proposals for:ALARA criteria:
Criteria and LevelsOperational marginsEmergency intervention
18
DIMRs &WDP:
Ownership
Procedure to create, check, validate and close
Work optimization process
Retour d’expérience
Controls
Functionality, routing, CERN integration
Contractors, PCR
Approval rounds
Implementation issues
ALARA
committee:
Guideline
for presentations
Frequency
Quorum
Roles
Waiving of the ALARA committee meetingSlide19
19…were approved by S. Myers and R. Tranton 20 April 2013
!Final report(s) from ARWG …
EDMS doc # 1244380Slide20
20Existing ALARA documents (EDMS 825353, 810178 and 810176) will be combined into a single document and updated with the recommendations
from the ARWG Next steps
+
The new rules have become effective on 20. April 2013