PPT-ANNEX 4A - APPENDIX 7B ALTERNATIVE PROCEDURE FOR DETERMINATION OF THE TOTAL ROAD LOAD
Author : christina | Published Date : 2023-06-24
1 Introduction The purpose of this appendix is to provide the road load power calculation method that may be used at the choice of manufacturer when the vehicle
Presentation Embed Code
Download Presentation
Download Presentation The PPT/PDF document "ANNEX 4A - APPENDIX 7B ALTERNATIVE PROCE..." is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
ANNEX 4A - APPENDIX 7B ALTERNATIVE PROCEDURE FOR DETERMINATION OF THE TOTAL ROAD LOAD: Transcript
1 Introduction The purpose of this appendix is to provide the road load power calculation method that may be used at the choice of manufacturer when the vehicle road load has been determined according to WLTP procedures as defined in UN GTR No 15. Calculations. Calculate the peak-to-peak voltage at the output of the DAC. Vdac. p. -p. . = I. FS. * . R. Where R is the total impedance seen by the DAC and I. FS. is the full-scale output current. By: Arnie De Guzman. Generator Duty Cycle/Application. Power rating - The power of the generating set is the power output available for consumer loads at the generating set terminals excluding the electrical power absorbed by the essential independent auxiliaries.. UT Police Dept – Safety Presentation. March 2008. Scope. Guidelines . for the safe use of . university owned. alternative vehicles (golf carts, utility vehicles, . 4-wheelers, scooters . and all-terrain vehicles) on campus. Hand receipt holders will be responsible to create new copy during inventories pre inventories, matching standard (next slide). Any changes from initial Shortage annex will be reconciled accordingly. EPA Region 9. 1-Hour NO. 2. Near Roadway Monitoring. April. 12, . 2011. Overview. New Primary NO. 2. standard . Monitoring requirements & site criteria. Near-road pilot project & EPA guidance. Current / Future. 1. Louw Kannemeyer. Contents. Road Network. Current WIM Use. Future WIM Use. 2. Authority. Paved . Gravel. Total. SANRAL. 22 214. 0. 22 214. Provinces - 9. 46 548. 226 273. 272 821. 47564671 Rev B ECN 1397255 1 Date: 4/13/2020 X Type: Screw # of Stages: 1 3* acfm a, e 4* psig b 5 psig c 6 hp 7 percent 8 hp 9 percent 10* kW e 11 kW d 12* kW/100 cfm e 13 Isentropic Efficiency P Structures, Buildings and Areas closed within the park special event for which a permit has been issued pursuant to Understanding Customer Values Behavioural Experiment ReportPR19 UndersPanding CusPomer alues Work Package 5 Behavioural ExperimenPPrepared for Yorkshire WaterAnnex 1AcknowledgementsAnnex 2AECOM and Lo EndoSo Surgery Center 135 Broadway Schenectady, NY 12144 Paent Name: Mary Smith Date of Birth: Record Number: Date / Time of Procedure: George Blue, MD Referring Physician: Overview by . Coffman Electrical Equipment . Onsite power simplified. by . Coffman Electrical . Equipment. April 30. 2015. Allows for simple integration with renewables. Inverter based cogeneration makes small scale CHP possible. 06.08.2019. Christoph Lueginger. BMW AG. IWG #28. Bern. 1) . Step Numbers in Additional Column. 2. WLTP GTR Annex 7 and 8 – Post . processing. Add . step numbers also in a new column 1. 3. A lot of misunderstandings are observed due to the fact, that the step number in the post-processing tables is listed in the last column.. BMW, . 21. .03.2014. Proposal on a family definition for road load determination. WLTP-06-11-rev1e. In the current GTR two coast downs are necessary for one CO. 2. -family.. Coast down testing is very time consuming and inflexible (weather, track capacity, …). of the UN Regulation. . No. [157] (ALKS). (. ECE/TRANS/WP.29/2020/81). From the Approval Authority Standpoint. Transmitted. . by the expert . from the Russian Federation. Informal document. . GRVA-07-07.
Download Document
Here is the link to download the presentation.
"ANNEX 4A - APPENDIX 7B ALTERNATIVE PROCEDURE FOR DETERMINATION OF THE TOTAL ROAD LOAD"The content belongs to its owner. You may download and print it for personal use, without modification, and keep all copyright notices. By downloading, you agree to these terms.
Related Documents