Statements of possible future functionality for IFS software products and technology are for information purposes only and should not be interpreted as any commitment or representation 2 Manufacturing ID: 311791
Download Presentation The PPT/PDF document "Disclaimer." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1Slide2
Disclaimer.Statements of possible future functionality for IFS’ software products and technology are for information purposes only and should not be interpreted as any commitment or representation
2Slide3
Manufacturing enhancement
packageIFS Applications
8 SP1
© 2013 IFS
3
Manufacturing
excellenceSlide4
Manufacturing
enhancement
package
© 2013 IFS
4
Manufacturing
excellence
Targeting
Manufacturing
customers
live on or
planning
for
upgrade
to IFS
Applications
8 SP1
what
Various
functional
enhancements
,
primarily
planning
and shop order area
When
Beta extension on IFS Applications 8 SP1 at end of Q2 2013
I
ncluded
in core IFS Applications 9Slide5
Manufacturing enhancement package
© 2013 IFS
5
Manufacturing
excellence
Requirements
from
Manufacturing
reference
group
Customers
Partners
User
groups
…
> 30 ENHANCEMENTSSlide6
Manufacturing enhancement package
© 2013 IFS
6
Manufacturing
excellence
Various functional enhancements, primarily in planning and general shop order area
SHOP ORDER
PLANNING
Master Scheduling
Build up of Inventory
Forecast consumption
Save of original forecast
MRP
Run
with
selections
Time
phased
safety
stock
CRP
Integrated
in
MS/MRP/PMRP
Shop Orders
Status Parked
Enhanced
reserve
and
backflush
Consolidated
pick list
Routings
& Operations
Lot
size
based
routings
Overlapping
operations
Employee
competency
for
Manfacturing
operationsSlide7
Planning
enhancements
© 2013 IFS
7
Master
Scheduling
Build
up of
Inventory
MS level 1 proposals based on rate and user defined periods
Forecast records allowed on non working days
Forecast
Consumption
Forecast consumption both backward and forward within a reasonable time span to avoid initiation of new supplies.
Improved control roll out of unconsumed forecast outside demand
time fence
Save of Original
Forecast
To compare original plan with live version of the master schedule.
Implemented for both level 0 and level 1.
PLANNING
Master Scheduling
Build up of Inventory
Forecast consumption
Save of original forecast
MRP
Run
with
selections
Time
phased
safety
stock
CRP
Integrated
in
MS/MRP/PMRPSlide8
Planning enhancements
© 2013 IFS
8
MRp
and CRP
Run
MRP with
selections
Run MRP for selected inventory parts and their components. Supplies will be generated for demands of those selected parts.
Demand changes since last MRP run can be quickly evaluated.
Time
Phased
Safety
Stock
Time phased safety stock in MS/MRP in order to support increase/decrease of safety stock during periods when
customer demands are very variable/stable
Their supply process is expected to show more unreliability/reliability
CRP –
Integrated
in MS/MRP/PMRP
Provides planners with better support regarding capacity, actual start, finish dates etc.
PLANNING
Master Scheduling
Build up of Inventory
Forecast consumption
Save of original forecast
MRP
Run
with
selections
Time
phased safety stockCRP
Integrated
in
MS/MRP/PMRPSlide9
Shop order
enhancements
© 2013 IFS
9
Shop order
Enhanced
Reserve
and
Backflush
Control over automatic reserve and
backflush
of material.
Avoid unexpected material shortages in locations.
Function for visualize of reserve and
backflush
Consolidated
Pick List
Select a number of shop orders sorted out of for example time range, warehouse, department, work center, selected shop orders and get one pick list created.
Shop Order
Parking
Park
reason
with
clarifications
for
supply
,
demand
,
load
etc
Support for update of revisions/alternatives of routings and structuresShop order historySHOP ORDER Shop Orders
Status Parked
Enhanced
reserve
and
backflush
Consolidated
pick list
Routings
& Operations
Lot
size
based
routings
Overlapping
operations
Employee
competency
for
Manfacturing
operationsSlide10
Shop order
enhancements
© 2013 IFS
10
Routings
and Operations
Overlapping
Operations
Operation overlap also when infinite scheduling.
Lot
Size
based
Routings
If quantity of demand fluctuate, there can be different shop floor alternatives regarding how to produce the part.
Minimize production cost per unit of manufactured part via different routing depending on order size.
Employee
competency
for
Manufacturing
Operations
Verify that employees with right competency report setup and/or run.
The employee demand graph used as an input to employee planning based on competencies
Assign employee to operations
SHOP ORDER
Shop Orders
Status Parked
Enhanced
reserve
and
backflush
Consolidated
pick list
Routings
& Operations
Lot
size
based
routings
Overlapping
operations
Employee
competency
for
Manfacturing
operationsSlide11
MANUFACTURING ENHANCEMENT PACKAGE
© 2013 IFS
11
But
also
…
Usability
enhancements
in MS and MRP
MRP –
Consider
by-product
as
supply
Shop order
documents
Media
Prototyping
Supporting
projectSet as supply
Redefine
shop order
type
Shop Floor Workbench
Filter
addings
Approve
subtasks Receive of by-products Slide12
MANUFACTURING ENHANCEMENT PACKAGE
© 2013 IFS
12
But
also
…
Select
revison
for shop orders with past due start dates
Update routings and structures for non- started shop orders
New check box in shop order material
planning
Set work centers and
tolls
inactive
Load
graphs
enhancements
Kanban
to
create
distribution order
…Slide13
CBS/APB Enhancements
IFS Applications 8 SP1
© 2013 IFS
13
Manufacturing
excellenceSlide14
CBS/APB Enhancements
© 2013 IFS
14
Manufacturing
excellence
Various functional enhancements requested by our regions
Most important enhancements are support for :
Project connected shop orders Batch balanced shop orders Enhanced workload sequencing functionality
Planned deliveries
As a patch on IFS Applications 8 SP1 at end of Q2 2013
Included in core on IFS Applications 8 SP2 October 2013Slide15
© 2013 IFS
15