Edition 02 2014Formwork ScaffoldingEngineeringRudolfDieselStrasse 1989264 WeissenhornGermanyTelFaxwwwpericomImportant NotesWithout exception all current safety regulations must be observed in those ID: 861755

decking ledger ledgers peri ledger decking peri ledgers decks rosett system scaffold 150 load safety 006 gravity high platforms

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "PERI UP Rosett FlexThe modular system sc..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 PERI UP Rosett FlexThe modular system sc
PERI UP Rosett FlexThe modular system scaffoldingexible – safe – fast Edition 02 | 2014Formwork ScaffoldingEngineeringRudolf-Diesel-Strasse 1989264 WeissenhornGermanyTel.Faxwww.peri.comImportant Notes:Without exceptio

2 n, all current safety regulations must b
n, all current safety regulations must be observed in those countries where our The photos shown in this brochure feature construction For this reason especially safety and anchor details cannot always be considered as conclusive or

3 nal.These are subject to the risk
nal.These are subject to the risk assessment carried out by the contractor.The systems or items shown are not necessarily available in all countries.Safety instructions and load specications are to strictly observed at al

4 l times.Separate structural calculations
l times.Separate structural calculations are required for any deviations from the standard design data.The information contained herein is subject to technical changes in the interests of progress.Errors and typographical mistakes r

5 eserved. 1 ContentsQuickly erected and s
eserved. 1 ContentsQuickly erected and safe working areas PERI UP fulfils the requirements of the industryModular scaffold with new flexibilityUniform grid dimensions for maximum adjustmentPERI UP Rosett – a strong node connect

6 ionHigh load-bearing capacity through hi
ionHigh load-bearing capacity through high rigidityLedger with “Gravity Lock”Fast, simple and safeLedgers for all tasksAs guardrail or ledger for material storageOptimized safety and cost-effectivenessScaffold decking with

7 grid systemFast assembly of platformsDe
grid systemFast assembly of platformsDecking installed in “almost any position”Safety measures recognizable from afarToe board painted in signal colourSmall additional components with big effectsPERI connections ensure fl

8 exibilityLedger to ledger coupler makes
exibilityLedger to ledger coupler makes circular scaffolding easierWidening platforms with new possibilitiesRosetts at the ends of bracketsAccess up to 90 m highLightweight stair towers for fast assemblySite stairs with easily mount

9 able stepsConvenient access even with to
able stepsConvenient access even with tools 2 Quickly erected and safe working areasPERI UP fulls the requirements of the industryFor use in industry, a scaffolding system must be extremely exible.At the same time, all wor

10 king areas which have been erected must
king areas which have been erected must full the highest safety requirements and naturally be assembled very quickly.tant requirements, the proven PERI UP Rosett modular scaffolding was supplemented with new components.The res

11 ult is a exible system scaffold whi
ult is a exible system scaffold which leaves almost nothing to be desired for scaffolders.PERI UP Rosett Flex provides:Optimal adaptabilityHigh level of working safetyFast assemblyThrough the adaptability of the system scaffold

12 , complicated scaffolding assignments ar
, complicated scaffolding assignments are also quickly realized. 3 Areas for installation and maintenance work are quickly assembled with PERI UP.Decking is only installed in those places where it is actuEnd-to-end guardrails and to

13 e boards provide high levels of working
e boards provide high levels of working safety 4 Modular scaffold with new exibilityUniform grid dimensions for maximum adjustmentlar scaffold, such as standards, ledgers and decking, have a uniform length and width grid dimen

14 sion of This allows almost any adjustmen
sion of This allows almost any adjustments to be made to suit site conditions which has only been possible up to now with tube and couplers.PERI UP Rosett Flex offers:System dimensions of 25 and 50 cmMetric grid dimensions for optim

15 aladaptability50 – 300 cm25 –
aladaptability50 – 300 cm25 – 400 cmToe boards with lengths cut sions, border the inner and outer edges of all decking.Lattice girders and decks are available in different lengths.This means that optimal adjustment to the

16 geometry is possible as well as to the p
geometry is possible as well as to the permissible load.150150150150300300300150150 5 tions are circumvented with system decking, guardrails 6 PERI UP Rosett – a strong node connectionHigh load-bearing capacity through high ri

17 gidityThe PERI UP nodes provide a maximu
gidityThe PERI UP nodes provide a maximum of twelve connection possibilities for:four ledgers,four ledger diagonal braces andfour node braces.The high rigidity of the ledger connection allows only small deformations on the standards

18 .This results in high standard loads and
.This results in high standard loads and it means that braces are not required in many cases – the ledgers provide sufcient reinforcement.The UP Rosett allows for The shape of the rosett prevents the standards from rolling

19 away and makes stacking very easy.The P
away and makes stacking very easy.The PERI UP scaffold node has been approved by the Deutsches Institut für Bautechnik.Construction Approval 7 Ledger momenty, dLedger horizontal forceLedger shear forcey, d = 11.3 kNLedger shear fo

20 rceBrace forcev, dLedger diagonal braces
rceBrace forcev, dLedger diagonal braces are inserted directly into the holes of the ledger.Node braces are mainly required for cantilevers. Design values of the German Technical Approval Z-8.22-863The high rigidity of the PERI UP n

21 ode allows very high leg loads. 8 The PE
ode allows very high leg loads. 8 The PERI UP gravity lock allows easy and safe assembly.When inserting the wedge head into the rosett, the wedge drops through the force of gravity into the hole and locks.The rectangular prole

22 of the ledger prevents the assembly of t
of the ledger prevents the assembly of tubes and couplers to parts not suitable.Gravity lock, the self-securing ledger connection, rigidly connects the ledger to the rosett.Ledger with “Gravity Lock”Fast, simple and safeSi

23 mple, safe assembly of the UH ledger tha
mple, safe assembly of the UH ledger thanks to PERI UP gravity lock.The ledger can be easily installed from a safe position.The wedge drops by gravity and secures automatically.High node rigidity due to the large pressure point spac

24 ing of 116 mm.116 9 The ledger full
ing of 116 mm.116 9 The ledger fulls several funcAbove the decking it is used as a The small width of the UH ledger means that up to 4 ledgers can be carried manually at any one time.On the level of the decking, the same ledger

25 serves as a support for the decks.This
serves as a support for the decks.This means the number of different 10 Ledgers for all tasksAs guardrail or ledger for material storageThe lengths and type of horizontal components can be selected according to the load.All ledger

26 s have a rectangle prole on the top
s have a rectangle prole on the top side which is approx. 30lighter compared to a round tube with same load-bearing capacity.For minimum loads and small spans, thestandard ledger is sufcient.For higher loads, the reinforce

27 d ledger is used.Covering of gaps is not
d ledger is used.Covering of gaps is not necessary.Each ledger length can be completely covered with system decking.Platform completely covered with PERI UP system decking.Lightweight ledger used as a For platforms, reinforced or st

28 andard ledgers are used depending on 11
andard ledgers are used depending on 11 Reinforced UHV ledgers designed as a lightweight construction.The reinforced UHV ledger is the right choice for spans of 1.50 m and more.Depending on the load, there are two versions availabl

29 e.Ledger UH.The lightweight UH ledger is
e.Ledger UH.The lightweight UH ledger is available in This means that all lengths can be used as guardrails as well as decking support.UHV-L12.6030015.3011.1013.319.920014.8011.613.118.0030021.80.80q [kN/m]Wgt. [kg]1.4018.52.0018.51

30 8.51004.002006.107.501.93001.81.340011.5
8.51004.002006.107.501.93001.81.340011.501.4.4q [kN/m]Wgt. [kg]*held laterally by the decking or similar 12 Optimized safety and cost-effectivenessScaffold decking with grid systemFor the new PERI UP industrial decks, a system widt

31 h of 25 cm was selected.Due to this, wor
h of 25 cm was selected.Due to this, working platforms are completely covered without any gaps.All decks have an integrated lock against lifting as well as a non-slip perforated surface.The small overall height and specially selecte

32 d prole cross-section, allow ergono
d prole cross-section, allow ergonomical transport by hand.Through the mounting of the ledger between the decks, each eld can be divided in Decking areas can be completely covered.Projecting steel columns can be built arou

33 nd using system compo 13 The deck is mou
nd using system compo 13 The deck is mounted to the prole of the ledger.A separate ledger is not required for the decking.and is secured through the force of gravity.This means the deck is prevented from lifting.The clamp of th

34 e deck opens when The UDI industrial dec
e deck opens when The UDI industrial decking is available in lengths of 50/75/100/125/150/200/250/300 cm 14 Fast assembly of platformsDecking installed in “almost any position”Depending on the required direction of the dec

35 k span, ledgers are installed as As the
k span, ledgers are installed as As the ledger ts between two adjoining decks, the most favourable laying direction can always be selected.For protruding pipes or diagonals, openings can be created by overlapping the decks.The

36 tremendous exibility of the decking
tremendous exibility of the decking is fully utilized, in particular, for complicated industrial plants with guaranteed fast assembly.Piping installations can be integrated in such a way so that safe and gap-free working platfo

37 rms are created. 15 The PERI UP in
rms are created. 15 The PERI UP industrial decking in Overlapping of decks is possible Complete covering of all levels.Deck widths of 25 and 37.5 cm.Integrated protection against lifting.Non-slip surface.Easy to carry and tran

38 sport(attach to clamp).Deck clamp for co
sport(attach to clamp).Deck clamp for connecting two decks.*without deection limitation. Loading of UDI steel deckWeight [kg]Load Perm. load load2]acc. to DIN EN 12811-1surface load* ²   4.00   5.40 

39  6.70   8.10  
 6.70   8.10   9.50   12.30   15.00   17.80666666546.006.006.006.006.006.004.503.00   40.0   26.7   20.0   16.0   13.3  ï

40 »¿ 10.0   8.0   6.3
»¿ 10.0   8.0   6.3   5.10   6.80      8.50   10.20   11.80   15.20   18.50   21.90666666546.006.006.006.006.006.004.503.

41 00A ledger can be placed between two dec
00A ledger can be placed between two decks if required.For small openings, decks can be overer30 mm(= 2 x 15 mm)15 mm15 mm 16 Safety measures recognizable from afarToe board painted in signal colourThe toe board borders the working

42 platforms on all sides.Due to the bright
platforms on all sides.Due to the bright signal colour, the completed scaffold can be easily checked at a The toe board is always mounted between two vertical scaffold tubes.It can also be used over corners – for this, only one

43 of the toe boards has to be turned.Toe
of the toe boards has to be turned.Toe boards do not burn, have a very low weight and can be easily stacked on top of each other.End-to-end toe boards provide safety on the platforms.Easy transport due to the lightweight components

44 and simple stacking. 17 For intermediat
and simple stacking. 17 For intermediate lengths, the UPY 50 and UPY 75 boards can be screwed to The hatch of the access opening is also able to be opened even with end-to-end UPY 50UPY 75 18 Small additional components with big ef

45 fectsPERI connections ensure exibil
fectsPERI connections ensure exibilityWith the PERI connections, ledgers (ledger-to-ledger) or standards (standard-to-ledger) can be attached to the available ledgers.Assembly is simple: ledgers are divided so that the industri

46 al decking as well as the standards can
al decking as well as the standards can be arranged as reOpening can be very easily accommodated with system components.The decking can be moved up very closely to the obstruction, the edges of the decks are then secured with guards

47 tallations.No problem with PERI connecti
tallations.No problem with PERI connecting Decks can be arranged as required around 19 Ledger-to-ledger coupler with one or two conLedger spigot with or without connection of Ledger-to-ledger Standard-to-ledger Guardrails and toe

48 20 Ledger to ledger coupler makes circul
20 Ledger to ledger coupler makes circular scaffolding easierContinuous side protectionCircular structures frequently require the use of tube and couplers.With Rosett Flex, the complete scaffolding can be carried out with system com

49 This results in a clear reducOn the oute
This results in a clear reducOn the outer side of the scaffold, side protection is mounted consisting of guardrails and toe boards in the grid system.For supporting the decks, ledgers are installed transversely using a ledger to led

50 ger coupler.The trapezoidal-shaped remai
ger coupler.The trapezoidal-shaped remaining area is closed using the PERI UP Corner Sheeting UPD.The PERI Corner Sheeting UPD closes all gaps in the decking between the turned scaffold elds.ing UPD is sufcient to cover ev

51 ery diameter of circular structures. 21
ery diameter of circular structures. 21 Circular container scaffolded with a three-part side protection complete with system components.The ledger to ledger coupler is used for the installation of the horizontal ledger.The Corner Sh

52 eeting is rmly connected with this
eeting is rmly connected with this ledger, it closes the gap to the next scaffold bay which can be adapted to the radius of the structure 22 Widening platforms with new possibilitiesRosetts at the ends of bracketsWith the brack

53 ets, platforms are widened or gaps to ex
ets, platforms are widened or gaps to existing buildings are reduced.The industrial decks are also secured on the brackets against lifting and close tightly with the main decking.At the ends of the brackets, ledgers and verticals ca

54 n be attached.Through this, internal cor
n be attached.Through this, internal corners can be completely covered with decking.Brackets on the inside of a platform around a circular container.The decking is laid on ledgers and the brackets.On the internal corners of the buil

55 ding, the brackets can be attached to a
ding, the brackets can be attached to a vertical simultaneously – without any height offset. 23 Bracket with half Rosett for small wall distances.Ledgers can be mounted on the left Bracket with complete Rosett.Ledgers can be at

56 tached in three Bracket with Rosett and
tached in three Bracket with Rosett and pressed-in spigot.For attaching ledgers and verticals e.g. UCM 50 with half RosettUCM 75 with half RosettPoint Loadoint LoadF3.93.9UCM 50-2UCM 75-23.93.9UCM 50 with SpigotUCM 75 with Spigot T