Download Presentation The PPT/PDF document "PHENIX Status" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
PHENIX Status
Time Meeting, 3/09/2010Stefan Bathe
03/09/2010
Stefan Bathe for PHENIX, Time Meeting
1Slide2
Past Week History
03/09/2010Stefan Bathe for PHENIX, Time Meeting
2
Had to swap HV mainframe for DC E Wednesday night: lost 10 h of beam
DAQ problems Friday night: lost 7 h of beam
Otherwise smooth running
Plan for Wednesday
HBD work (one module is developing short)Slide3
Integrated Luminosity: Accumulated
03/09/2010
Stefan Bathe for PHENIX, Time Meeting
3
recorded
delivered
minimum goal
desiredSlide4
Integrated Luminosity: Per Day
03/09/2010
Stefan Bathe for PHENIX, Time Meeting
4
Past week not particularly goodSlide5
Vertex Efficiency (Per Day)
03/09/2010
Stefan Bathe for PHENIX, Time Meeting
5
goalSlide6
Efficiency
03/09/2010Stefan Bathe for PHENIX, Time Meeting
6
Fraction of all events recorded within 20cm =
0.84
(when PHENIX on)
Fraction of all events recorded within 30cm =
0.77
(when PHENIX on)Slide7
J/ψ
03/09/2010
Stefan Bathe for PHENIX, Time Meeting
7
Analyzed Luminosity (for mass plots): 89.17
μ
b
-1
with 234M LVL2 events, and 8856 segments
which gives 22.1 +- 0.6 (stat) J/Ψ per μb-1 Thu Mar 4 13:02 EST 2010Compared to Run7 Au+Au which had about 18.2 J/
Ψ
per
μ
b
-1
Consistent with Run-7