/
Radiant Panel Updates 2014 June Materials Meeting Radiant Panel Updates 2014 June Materials Meeting

Radiant Panel Updates 2014 June Materials Meeting - PowerPoint Presentation

debby-jeon
debby-jeon . @debby-jeon
Follow
348 views
Uploaded On 2018-10-24

Radiant Panel Updates 2014 June Materials Meeting - PPT Presentation

Switzerland Materials Working Group Michael Burns FAA Tech Center June 2014 AGENDA Radiant Panel Updates Task Group Progress Test Method Supplement AC Development of New Appendix Summary Future Work ID: 695514

rpi chapter heat test chapter rpi test heat radiant rev panel calibration temperature request position steps flame appendix system

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Radiant Panel Updates 2014 June Material..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Radiant Panel Updates2014 June Materials MeetingSwitzerland

Materials Working Group

Michael Burns, FAA Tech Center

June, 2014Slide2

AGENDA

Radiant Panel UpdatesTask Group ProgressTest Method / Supplement / ACDevelopment of New Appendix

Summary / Future WorkSlide3

RADIANT PANEL TASK GRUPDATE

TASK4/1/14Chapter RPI (Rev.1) – Request for comments4/7/14Working Draft AC (Rev.1) – Request for comments4/25/14

Comment Period End (Rev.1)

4/30/14

Draft Appendix (Rev.1) – Request for comments

5/7/14

Chapter RPI and Working Draft AC (Rev.2) – Request for comments

5/30/14

Comment Period End (Rev.2)Slide4

Chapter RPISection

Description1Scope2

Definitions3Test Apparatus4Instrumentation

5

Test Specimens

6

Calibration

7

Material Testing

8

Reporting

9

RequirementsSlide5

DEFINITIONS

Ignition Time (15 or 30 Second Option)Flame Profile (Pilot Burner)Zero Position (Coordinates Defined)

Flame Propagation (Improved Definition)After-Flame TimeRadiant Heat SourceThermal/Acoustic Insulation

Test Series (Period between Calibration and Recheck)

NIST (NIST Traceability)

Heat

Flux Density

Chapter RPISlide6

TEST

APPARATUS Test ChamberDraft CheckElectric

Radiant Heat Source and Placement Specimen Holding System (Sliding Platform)Specimen Retaining Frames (Standard / Hook and

Loop)

Pilot Burner (Zero Position)

Chamber

Temperature

Thermocouple (Position and Operating Parameters)

Calibration Assembly (Heat

Flux Gauge

and Calibration Fixture)

Note: Previous Figure Moved to AC

Chapter RPISlide7

INSTRUMENTATION

Data Acquisition (NIST Traceability)Timing Device (NIST Traceability)

RulerTEST SPECIMENSNumber of Specimens (Minimum of 3)

Specimen Conditioning 70

± 5º F (21 ± 2º C) and 55 ± 10% relative

humidity

Specimen

Construction

Rigid

/ Non-Rigid

Materials

Tape (Test Method Moved From AC)

Hook

and Loop (

Test Method Moved From AC)

Damping Systems (Test Method Moved From AC)

Chapter RPISlide8

CALIBRATION

Zero Position Calibration (7 Steps)System Upset Check (8 Steps)

3-Position Check (6 Steps)MATERIAL TESTING (9 Steps)System Recheck Procedure (8 Steps)

REPORTING

Setpoint

of Temperature for Radiant Panel Power Controller

Zero

Position Calibration

Chamber Temperature

Chapter RPISlide9

REPORT (Continued)

System RecheckMaterial Identification

Ignition Time (15 or 30 seconds)After-FlameFlame PropagationNotes/CommentsPass/Fail

REQUIREMENTS

Quantity

of

Samples (80% or greater)

After-Flame (≤ 3 seconds)

Flame

Propagation (≤

2 inches)

Chapter RPISlide10

Chapter RPI Appendix

Test ChamberThermal Ceramics Inc., GAKaowool™ M board and Superwool 607 board

Gray Glass, N.Y.High temperature glass viewing window(s) - Pyroceram IIElectric Radiant Heat SourcePower Modules Inc., PA

EZ-Zone

Temperature

Controller

Electrical

Radiant Heat

Panel

Din-a-Mite

Power

Controller

Bayonet

Type Thermocouple (Electrical panel operating temperature)Slide11

Chapter RPI Appendix

Pilot BurnerMarlin Engineering, Inc., WASupply Tube Assembly (Formed and Straight Tubing)

Nozzle AssemblyNozzle ExtensionFlame Length IndicatorChamber Temperature ThermocoupleOmega Engineering, Inc. CT (One of many options)

 

Heat

Flux Gauge (HFG)

Gardon Heat Flux Gauge

(With/without

mounting flange)

Vatell Corporation, VA

Medtherm Corporation, ALSlide12

2014 Radiant Panel Round Robin

It’s that time again! Request

for Participants Looking to begin shipping samples by mid July(Results Presented at the Fall Meeting) Task Group Input Request:Are there any problems that need to be addressed?What should be

evaluated?Slide13

Future Work

Review / Include Task Group Comments (Rev.2)Chapter RPI / Appendix / AC placeholder documents Include Standardized Test Data Sheet in Chapter RPI

2014 Round RobinSlide14

Questions?