Download The PPT/PDF document "Submission for resumption of works after..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Submission for resumption of works after Circuit Breaker period
<Proj ref no i.e. A/Exxxx-xxxxx-20xx><Proj title> on <lot number> at <address>For DfMA factories and supply chain firms (RMC and Aggregate Suppliers) in yellow highlights, Please provide<Factory/Plant Address with Postal Code><Firm Name with UEN number><Unique Facility Identifiers >
Note: For all projects (<3 million or more than 3 millions)
Slide2Site/Factory/Plant
Layout Plan-zoning/demarcation
Zone
Activity
Colour Code
A
CastingPurpleBRebarGreenCExcavationBlueDPilingYellowEPilingOrange
Week 1-4
Instructions on filling the template to meet the Safe Worksite Criteria 9.1 & 9.3For Criteria 9.1, the Builder must ensure each segregated team of workers to work within the designated zone and away from workers of other teams. Zones must be separated from each other by at least 2m within the same floor or level, or by floor level.For Criteria 9.3, the Builder is to demarcate clearly zones within the site, and assign visual identifiers (e.g. coloured vest, T-shirt, armband, stickers on helmets etc.) to each team of workers, to allow individuals to distance themselves from other teams.
Example of what to include
Instruction : Layout plan and table to show the zones and the type of activities
To include
SafeEntry
Locations on plan
Slide3Site/
Factory/Plant Layout Plan – Movement control plan
Instructions on filling the template to meet the Safe Worksite Criteria 9.4
For Criteria 9.4, the Builder is to provide movement control plan to ensure that facilities at the Construction Project Premise e.g. canteen, toilets, shared access points such as stairs, passenger hoists, are used in a manner such that the facilities will only be used by one Segregated Team at anytime.
e.g. dedicated use of toilets, staggered use of shared facilities
ie
canteen, break areas.Example of what to include
Instruction : To show Layout plan of access route and staggered use of shared facilities etc.
Slide4Applicable to Construction Projects and Supply Works with
first application submitted to BCA on restart of construction works after 01 Oct 2021At Canteens, Rest Areas and Toilets [New]
Instructions on filling the template to meet the Safe Worksite Criteria 10.5
To show the area and maximum and allowable capacities at the canteens, rest areas and toilets, and to display the capacities on site.
For Criteria 10.5, the Builder to ensure
all canteens, rest areas and toilets
have an allowable capacity of 50% of maximum capacity at any one time. Maximum capacity is defined as the maximum number of people that are able to use the facility while maintaining the minimum 1m safe distancing between another personTo display at visible location at the shared facilities: Maximum Capacity XX PaxAllowable Capacity XX Pax
Max 30 Pax
Allowable 15 PaxExample of what to includeArea =
XX m2
Slide5Applicable to Construction Projects and Supply Works with
first application submitted to BCA on restart of construction works after 1 Oct 2021Instructions on filling the template to meet the Safe Worksite Criteria 11.5To show the maximum number of workers entering site daily and layout plan, and to display on site.For Criteria 11.5, the Builder to deploy minimum of 1 number of TraceTogether only-SafeEntry (TT-SE) points for every 500 workers deployed to site daily. For illustration:Total number of workers deployed to site in a day ≤ 500: 1 TT-SE point
Total number of workers deployed to site in a day > 500 but ≤ 1000: 2 TT-SE points
To display:
Maximum number of workers entering site daily = XXX
Show layout plan with indication of locations
TT-SE point
Example of what to include
Number of TT-SE entry points
[New]
Slide6Site/Factory/Plant
Layout Plan
Instructions on filling the template to meet the Safe Worksite Criteria 24
For Criteria 24, the
Builder is to provide:
Adequate hand-wash stations at exits of work areas;
Cleaning agents (e.g. hand soap, toilet paper) at all toilet and hand-wash stations;Disinfecting agents (e.g. hand sanitisers) at all human traffic stoppage points within the worksite, such as entrances, reception areas, security booths and workers’ hoist.Example of what to includeInstruction : To show indicative locations of hand wash stations and hand sanitizers locations (one gd example is for each zone to have one as shown in example below, only as far as reasonably practicable)
Slide7Site/Factory/Plant Manpower Deployment
List of Main Contractors and Sub Contractor
No.
Firms
UEN No.
Team Assigned
No of Workers in Team
1
ABC Pte Ltd
12345
A1
3
2
DEF Pte Ltd
45354
A2
2
B2
9
D2
5
3
FGH Pte Ltd
34324
C3
9
D3
4
E3
2
4
HIJ Pte Ltd
43245
D4
2
E4
7
Example of what to include
Slide8Site/Factory/Plant 3-Month Work Schedule
Example of what to include
Zone
Description of Activity
(Sub Zone If any)
Team Marking
Estimated No of Workers (per day) Required for the following weeks
(WPH+S Pass) + (SC+PR+ EP)
Week 0
Week
1
Week
2
Week
3
Week
4
Week
5
Week
6
Week
7
Week
8
Week
9
Week 10
Week 11
Week 12
Total No of Workers Per Week
19
32
33
33
30
33
33
36
36
36
33
33
24
A
Casting
A1
A2
2
5
5
3
4
5
5
55555
5
B
Rebar
B2
6
9
6
5
6
8
8
4
4
4
6
6
4
C
Excavation
C3
8
6
6
8
8
4
4
9
9
9
6
6
6
D
Piling
D2
D3
D4
2
3
8
9
6
8
8
9
9
9
8
8
4
E
Piling
E3
E4
1
9
8
8
6
8
8
9
9
9
8
8
5
Slide9Site/Factory/Plant
Layout Plan
Step
Point of contact( when worker is not feeling well)
Contact Person
1
Unwell worker to inform foremanForeman, Mr XX @9XXXXXXX2Unwell worker to be sent to sick bay or for isolation. Foreman to inform project management team i.e. SE PM, CMSite Engineer, Mr XX @9XXXXXXXConstruction Manager, Mr XX @9XXXXXXXProject Manager, Mr XX @9XXXXXXX3Unwell worker to be sent to PHPC registered clinicClinic name: XXXPhone number: 6XXXXXXXX4Builder to track and record casesTo submit a daily report to BCA. The link for the submission will be provided in the approval letter.
Evacuation plan for Suspected Case (Criteria 26 of restart criteria for worksite)
Follow-up plan for Confirmed Cases (refer to Criteria 27 of restart criteria for worksite)a. SMO to immediately vacate and cordon-off the immediate section of the workplace premises where the confirmed case worked. The team that the confirmed worker belongs to should be put into isolation.b. Builder to carry out a thorough cleaning and disinfect entire site, in accordance with NEA guidelines.c. Builder to inform BCA of any confirmed cases.Instructions on filling the template to meet the Safe Worksite Criteria 26 & 27
For Criteria 26, the SMO to put in place an evacuation plan for suspected cases, as well as for all other onsite personnel.For Criteria 27, the Builder is to provide follow up plan in case of confirmed case.
Example of what to include