Total Cost of Ownership calculator tool ver 11 ABB Transformers 2015 ABB Group February 6 2015 Slide 2 TCO Tool A Quick Guide TCO Tool A Quick Guide Preword 1 Background ID: 232816

transformer tool abb tco tool transformer tco abb total 2015 group cost quick slide february co2 efficiency cooling ownership

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "A Quick Guide" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

A Quick Guide

Total Cost of Ownership calculator tool (ver. 1.1)

ABB Transformers, 2015Slide2

© ABB Group February 6, 2015 | Slide 2

TCO Tool / A Quick GuideSlide3

TCO Tool / A Quick GuidePre-word 1

Background of TCO and TCO toolThe use of Total Cost of Ownership –method (also known as Total Ownership Cost –method) allows manufacturers to tailor the design to the unique economic situation of each transformer user, and allows the user to evaluate multiple designs in order to find out the optimal solution for his need

The easy-to-use ABB Transformer TCO Tool supports customers to determine, based on their own situation and future scenario, the right loss capitalisation values to be used in their inquiry to be passed to the manufacturersThe tool also helps in comparing different alternative transformer offers, calculates the monetary savings and evaluates the environmental impact and therefore supports the related decision making and increases

the

awareness

Current

version 1.1.

supports

in addition

to English

language

also Chinese, German, French and Spanish languages

© ABB Group February 6, 2015 | Slide 3Slide4

TCO Tool / A Quick GuidePre-word 2

TCO tool is an universal easy-to-use tool for Determining the transformer loss capitalization values (”A” and ”B” factors)Comparing transformers with different first cost and loss values from the following aspectsTotal cost of ownership with payback time on marginal cost

Consumption of energyCO2 emission impact (in kg of CO2) with analogue to the number of trees needed to compensate the extra emissions caused by the trafo with lower efficiencyCalculation formulas are based on IEC 60076-20 (current draft) on applicable parts (the results

are fully

applicable with ”IEEE” transformers as well)

© ABB Group February 6, 2015 | Slide 4Slide5

TCO Tool / A Quick Guide

Interface / inputs 1

i-

buttons

for help

© ABB Group February 6, 2015 | Slide 5Slide6

TCO Tool / A Quick GuideI

nterface / inputs 2

© ABB Group February 6, 2015 | Slide 6

i

-buttons

for helpSlide7

TCO Tool / A Quick Guide

Interface / comparison and results© ABB Group February 6, 2015 | Slide 7

Peak efficiency index (IEC) is the highest efficiency that the transformer can reach at an optima loading point. It is calculated based on the IEC definition of efficiency.

Total cost of ownership

is the sum of the initial purchase cost and the net present value of the cost of losses during the lifetime. In this calculation, differences in other lifecycle cost components such as installation, maintenance, possible out-time and decommission costs are not included.

Total lifetime savings

during the lifetime of the transformer in selected currency when comparing the “Lowest total cost” and the transformer x.

Payback time in years

for the marginal investment on the higher efficiency when comparing the “Lowest total cost” and the transformer x. Simple payback calculation method.

Energy savings per year and total

– The amount of energy saved when selecting the “Lowest total cost” instead of transformer x.

CO2 emission reduction per year

– The amount of CO2 emission avoided in tons when selecting the “Lowest total cost” instead of transformer x. Calculated using the global average CO2 emission of 489 g per kWh generated.

CO2 absorption capability of trees

– The number of trees needed to offset the higher CO2 emissions caused by a transformer with lower efficiency based on the average annual absorption capability of 22 kg of CO2 by a single tree.Slide8

TCO Tool / A Quick GuideTCO Tool / interface /

basic reporting (pdf print)© ABB Group February 6, 2015 | Slide 8Slide9

TCO Tool / A Quick GuideNotes and remarks

Cooling lossesCooling losses of a transformer equal the power consumption of the cooling equipment of the transformer. In case of cooling with natural

oil and air flow (ONAN), the cooling losses are zero due to the fact that no additional power for pumps or fans is neededWith

transformers

with forced oil flow (OFAF, ODAF or OFWF) the pumps for oil are usually energised at no load condition of the unit.

Therefore

,

for a

typical

case the

cooling losses at no load (

) for

those

transformers equal the power consumption of the oil pumps

 

© ABB Group February 6, 2015 | Slide 9Slide10

© ABB Group February 6, 2015 | Slide 2