DO TMDL Subcommittee Meeting June 19 2012 A Bit of History 20082009 SummerFall 2008 BAP discussion begins Study Proposal formulated SummerFall 2009 Quality Assurance Project Plan developed ID: 527505

2011 ecology epa bap ecology 2011 bap epa comments 2010 tmdl submitted bit history review model study 2012 june

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "BAP Update" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

BAP Update

DO TMDL Subcommittee Meeting

June 19, 2012Slide2

A Bit of History (2008-2009)

Summer-Fall 2008

BAP discussion begins

Study Proposal formulated

Summer-Fall 2009

Quality Assurance Project Plan developed

Spokane Regional Wastewater

Phosphorus

Bio-Availability Study Initiated

Samples collected summer 2009-spring 2010Slide3

A Bit of History (2010)

September 2010

Draft Report submitted to Ecology and EPA for peer review and comments provided

Ecology review/comment/decision on incorporation into engineering plan and 2

nd

cycle of permits scheduled for 2

nd

Quarter 2012

November 2010, ECY states:

The

model is

the

basis for quantifying credits

The model will be adjusted on factors that increase allocation (i.e., BAP) at the 10 year assessment

December 2010, first “Final Report” completed

Formal comments provided by Ecology (1/20/2011)Slide4

A Bit of History (2011)

February 2011

Second “Final Report” completed

Response to comments received from UW (2/11/2011)

Formal comments provided by EPA (2/25/2011)

Response to comments received from UW (2/28/2011)

Formal response provided by EPA (3/01/2011)

Discussions

Not enough data to integrate BAP into permits

“Next steps” subcommittee formed

Dischargers concerned about “certainty”

Ecology and EPA acknowledge need for regulatory decisionSlide5

A Bit of History (2011)

April 2011

Discussions about

IEP studies and BAP research

“2-bucket” vs. “3-bucket” phosphorus models

Ecology’s commitment to use of the “2-bucket” TMDL model

IEP as the “poster child” for a modified permit limit

Ecology made another request for IEP’s orthophosphate

data

June 2011 – Washington NPDES permits issuedSlide6

Conclusion

“no matter who decides to pursue BAP, modeling with modified BAP inputs has to be consistent with the TMDL model and cannot negatively affect

Avista’s

DO responsibility found in Table 7 of the TMDL.”Slide7

2012

March - April

Bioavailable Phosphorus Workshop

Request from SRSP to Ecology to fund additional

studies

Proposed Scope of Work submitted to Ecology

Outstanding questions

Did original study meet the goals of the QAPP?

Were the comments submitted by Ecology and EPA adequately addressed?

Have Ecology’s requests for data been met?Slide8

Status

Reviews to be completed by June 30, 2012

Line by line evaluation of comments submitted by Ecology and EPA to UW and responses

2010

2011

Review of study for adequacy with the QAPP

Review of Ecology requests from DO TMDL meeting notes

Evaluation of the proposed Scope of Work with respect to EPA and Ecology expectations.