Module 2 TBM DisassemblyAnalysis of Services Dismantling of the TBM A system of what services materials used inside the Tunnel to move Tunnel Boring Machine forward and make Production until completion ID: 1046195

dismantling tbm services pipe tbm dismantling pipe services cable analysis disassembly line tunnel slurry chapter ventilation lines module control

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Introduction - Analysis of Services Dism..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1.

2. Introduction - Analysis of Services Dismantling of the Tunnel Boring MachineModule 2: TBM Disassembly-Analysis of Services Dismantling of the TBMA system of what services, materials used inside the Tunnel to move Tunnel Boring Machine forward and make Production until completion of the Tunnel and dismantling of the services for TBM inside Tunnel is must be a part of the fundamental Tunnelling action Plan as this will be fundamental in ensuring the tunnel activity is professionally managed.Ventilation ductSlurry Pipe line10” = Slurry Pipe line.or12” = Slurry Pipe line.Pipe lineWalkwayHT and LT CablesLighting and Control CablePipe linesVentilation duct3” = Bentonite or Grout Pipe Lines.2’’ = Sodium Silicate Pipe line.6” = Water and Air Pipe lines.10” = Slurry Pipe line.12” = Slurry Pipe line.3” = Bentonite or Grout Pipe Lines.2’’ = Sodium Silicate Pipe line.6” = Water and Air Pipe lines.10” = Slurry Pipe line.12” = Slurry Pipe line.

3. 1. Service Pipeline:3” = Bentonite or Grout Pipe Lines.2’’ = Sodium Silicate Pipe line6” = Water(Cooling and dewatering) and Compressed Air Pipe lines.10” = Slurry Pipe line.12” = Slurry Pipe line.2. Walkway : walkway-platform was approximately 5mtrs length dismantle use with Spanner or Pneumatic or Electrical Impact Gun.3. HT Cable : Separate Every 250mtrs Joint and roll on cable drum and remove junction boxes also. 4. Control Cables : Control cables are Profi-bus or Optical fibber cable, telephonic cable and Survey Communication cable.5. Ventilation Duct : Ventilation Duct removing with use of mobile elevated working platform.6. Dismantling Booster Pumps: With use of chain blocks to load booster pumps to MSV flatcar and sent out side of the tunnel.Contents : Analysis of Services Dismantling of the Tunnel Boring MachineModule 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

4. 3” = Bentonite or Grout Pipe Lines.2’’ = Sodium Silicate Pipe line.6” = Water(Cooling and dewatering) and Compressed Air Pipe lines.10” = Slurry Pipe line.12” = Slurry Pipe line.Chapter 1. Service PipelineModule 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

5. Chapter 1. Service PipelineService pipe lines are fallowing :Almost all service pipelines are 6mtrs length.Before Dislodgement Service pipe line please confirm with responsible persons to start dismantling.3” = Bentonite or Grout Pipe Lines.2’’ = Sodium Pipe line6” = Water and Air Pipe lines.10” = Slurry Pipe line.12” = Slurry Pipe line.Load all dismantling Service pipeline to MSV flatcar and Tie with Proper belt and sent outside to tunnel.Module 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

6. Chapter 2. WalkwayModule 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

7. Chapter 2. WalkwayBefore Dislodgement walk way please confirm with responsible persons to start dismantling.Walkway around 5mtrs length.Load Walkway platform to MSV flat-car with use of chain pulley attached with flat-car or manually loading.Load all dismantling walkway to MSV flatcar and Tie with Proper belt and sent outside to tunnel.Module 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

8. Chapter 3. HT CableModule 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

9. Chapter 3. HT CableBefore Dislodgement HT Cable make sure Cable was discharged from power supply and please confirm with responsible persons to start dismantling.HT Cable Dismantling time need more caring for cable and roll every 250mtrs of cable to individual cable drum and sent outside.Separate HT junction Boxes from cable and sent outside of tunnel with use of MSV Flat-car with proper tie.Module 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

10. Chapter 4. Control CablesModule 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

11. Chapter 4. Control CablesBefore Dislodgement control Cable make sure Cable was Disconnected from Source and please confirm with responsible persons to start dismantling.Control cables are Profi-bus or Optical fibber cable, telephonic cable and Survey Communication cable.Control Cable Dismantling time need more caring for cable and roll on cable drum and sent outside.Module 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

12. Chapter 5. Ventilation DuctModule 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

13. Chapter 5. Ventilation DuctBefore start dismantling ventilation duct, should confirm Ventilation fan was switched off and power supply disconnected or not.Ventilation Duct removing with use of mobile elevated working platform and fold individual pieces egg; 100mtrs or 130mtrs and load on MSV Flatcar.Roll the rope top side of the ventilation duct and collect all ventilation hooks keep all hooks in one wooden Box and Keep separately and load that box also on MSV.Module 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

14. After Removing Ventilation duct, walkway and Service pipeline Tunnel Viewwith use of mobile elevated working platform crosscheck again any ventilation hooks or bolting systems are under segments and remove all unwanted bolts or hooks inside segment.Module 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

15. Chapter 6. Dismantling Booster PumpsModule 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

16. Chapter 6. Dismantling Booster PumpsBefore Dismantling Booster pumps check inlet and outlet connections disconnected or not and Check power connection cable removed or not.With use of chain blocks to load booster pumps on MSV flatcar and sent out side of the tunnel.Module 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

17. View of the Tunnel after all services dismantling from Tunnel.Module 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

18. Module 2: TBM Disassembly-Analysis of Services Dismantling of the TBM

19. Thanking youModule 2: TBM Disassembly-Analysis of Services Dismantling of the TBM