PDF-MLCS Super Stack Dado Blade Set Mounting Instructions
Author : karlyn-bohler | Published Date : 2015-05-24
42T blades should be on both the right and left sides of the 6T chipper blades The points of th e 42 Teeth should always be orientated on the outside of the set
Presentation Embed Code
Download Presentation
Download Presentation The PPT/PDF document "MLCS Super Stack Dado Blade Set Mountin..." is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
MLCS Super Stack Dado Blade Set Mounting Instructions: Transcript
42T blades should be on both the right and left sides of the 6T chipper blades The points of th e 42 Teeth should always be orientated on the outside of the set up When Stacking the set of blades make sure the 6T chipper blades are aligned in the gu. All the parts of the dora are made of steel The blade is attached to the dora prongs with the help of rings The bracket for fixing the beam has multiple holes so that the height of the beam can easily be adjusted according to the height of the anima 4 mm 279 mm 307 mm 315 mm 306 mm Operation Run time 160 min 110 min 60 min 60 min 80 min Recharge 3 hours 1214 hours 12 hours 17 hours 12 hours Battery charge indicator Yes No Yes Yes Yes Overcharge protection Yes No No Yes No Blade assembly Onehande eg flame tips Incorrect offset Plotter is over or undercompensating for vector curve Small Letters and Shapes Lift Up During Cutting Problem Adhesive gels back together under vinyl after being cut Possible Solutions Use vinyl with a different adhes Complete setup instructions safety information and technical specifications are contained in the manual that comes in the dado set SetUp For SD600 Series DialAWidth Dado Sets Cuts Dadoes From 732 to 2932 Cut Width 32 32 16 11 32 13 32 16 15 CODELAMP [W]WEIGHT [kg]VOLTAGEFREQUENCYAMBIENT TEMPERATUREFLLED30CA0105.1136139516.50110/230V50/60HZLLED30PA0105.1126139517.00110/230V50/60HZLED FL.. Floodlights - Emergency version / 3 hours ba MYANMAR EDUCATION SYSTEM. Premjai. . Vungsiriphisal. , ARCM, CU . on . behalf of VSO, Thailand. November 17, 2014. Mandarin . Hotel . Bangkok. Background. Rapid changes in Myanmar. . - increasing development opportunities. Audiência Pública - Câmara dos Deputados – Brasília, 14 de . . dezembro de 2016. Bruno Ricardo . Bioni. (Mestre em Direito na USP, . GPoPAI. , . TechLab&Law. . uOttawa. . e . CoE. ). https://. Broch, Jens Trampe, . Mechanical Vibration and Shock Measurements. , Bruel & Kjaer, 1980, p. 124f.. (cf. Real-world Mounting Of Accelerometers For Machinery Monitoring Bowers, S.V.; Piety, K.R.; Piety, R.W.; Sound and Vibration v 25 n 2 Feb 1991 p 14-23). TIGHTEN ALL WINCH BASE MOUNTING BOLTS TO RECOMMENDED TORQUE AFTER THE FIRST ONE HOUNDRED (100) HOURS OF OPERATION, THEN EVERY 1000 OPERATING HOURS OR SIX (6) MONTHS, WHICHEVER OCCURS FIRST.. WINCH BASE MOUNTING BOLTS. Ing. Raúl Alvarez Guale, MPC. Probabilidad. . Condicional. La probabilidad de que ocurra un evento . B . cuando se sabe que ya . ocurrió algún evento . A . se llama . probabilidad condicional . y se denota con . Broch, Jens Trampe, . Mechanical Vibration and Shock Measurements. , Bruel & Kjaer, 1980, p. 124f.. (cf. Real-world Mounting Of Accelerometers For Machinery Monitoring Bowers, S.V.; Piety, K.R.; Piety, R.W.; Sound and Vibration v 25 n 2 Feb 1991 p 14-23). 1.1 1.21.31.42.12.23.*4.5. 6. *7. * 9.*10.11. Silicone cord*12. Mounting tool for springs 1.3*1.11.22.1.1.31.42.2.3. 4.7.5.6.10.9.11.12 2MOD-KOZE-50 - mounting instructionswww.KlusDesign.eu Slide the 2wwwKlusDesigncomNISA-PLA mounting instructionsCover CEnd cap DLED strip FSilicone cord EExtrusion AMounting strip BParts needed to mount the NISA-PLA extrusionTools needed for mounting- drill- scr IaIIIa150 mm / 59148400 mm / 1571483wwwKlusDesigneuMOD-KOZE-100 - mounting instructionstop viewcross-sectionIbIIbmin 108 max 113 mm / 445 4wwwKlusDesigneuMOD-KOZE-100 - mounting instructionsIVbVbVIbAt
Download Document
Here is the link to download the presentation.
"MLCS Super Stack Dado Blade Set Mounting Instructions"The content belongs to its owner. You may download and print it for personal use, without modification, and keep all copyright notices. By downloading, you agree to these terms.
Related Documents