/
Cormack Avenue becoming a culdesac and building the se Cormack Avenue becoming a culdesac and building the se

Cormack Avenue becoming a culdesac and building the se - PDF document

liane-varnes
liane-varnes . @liane-varnes
Follow
393 views
Uploaded On 2015-05-10

Cormack Avenue becoming a culdesac and building the se - PPT Presentation

This replaces the East West Link Oak Flats Interchange retained Free flowing connections for motorists on and off the motorway Cormack Avenue becoming a cul desac and building the second rounda bout are part of the future plan of the Tallawarra deve ID: 64501

This replaces the East

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "Cormack Avenue becoming a culdesac and b..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

PARK RAILILLAWARRAILLAWARRAPARKOAK FLATSHAYWARDS BAY TO KIAMA Woollybutt DriveTerry StreetFrazer’s CreekTongarra RoadYallah Bay Road Cormack Avenue TO WOLLONGONG unt Ro N Cormack Avenue becoming a cul-de-sac and building the second roundabout are part of the future plan of the Tallawarra development Wollongong City Council to upgrade Yallah Road Illawarra Highway Southbound exit ramp travels over the motorway to the Illawarra Highway a future bypass of Albion Park (Tripoli Way) Croome Road travels over the motorway New entrance to Croom Regional Sporting Complex Woollybutt Drive and Durgadin Drive become a cul-de-sac Motorway improved and shortened through Croom Regional Sporting Complex Motorway overpasses Tongarra Road Ramps may not a later stage New local road separates local and through traffic. West Link Oak Flats Interchange retained Free flowing connections for motorists on and off the motorway 2 laneseach waywith medianseparation Cormack Avenue becoming a cul - de-sac and building the second roundabout are part of the future plan of the Tallawarra development Free owing connections for motorists on and off the motorwayWollongong City Council to upgrade Yallah Road2 lanes each way with median separationIllawarra Highway becomes a cul-de-sac Southbound exit ramp travels over the motorway to the Illawarra Highway Ramps may not be needed until a later stageMotorway overpasses ngarra RoadCan connect with future bypass of Albion Park (Tripoli Way)Motorway improved and hortened through Croom Regional Sporting ComplexCroome Road ravels over the motorwayNew entrance to room Regional Sporting ComplexNew local road separates ocal and through trafc. This replaces the East West Link.Woollybutt Drive and Durgadin rive become a cul-de-sacOak Flats Interchange retained