Katsuya   Yonehara Tuesday Meeting Katsuya   Yonehara Tuesday Meeting

Katsuya Yonehara Tuesday Meeting - PowerPoint Presentation

liane-varnes
liane-varnes . @liane-varnes
Follow
343 views
Uploaded On 2020-01-10

Katsuya Yonehara Tuesday Meeting - PPT Presentation

Katsuya Yonehara Tuesday Meeting 09252018 Final stage of preparation Present status Review our system Make decision Discussion 91118 RF detector meeting Yonehara 2 RF detector Waveguide is here ID: 772445

yonehara detector wed meeting detector yonehara meeting wed structure full tue groove installation type sma jumper spectrum device measure

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Katsuya Yonehara Tuesday Meeting" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Katsuya YoneharaTuesday Meeting09/25/2018 Final stage of preparation

Present statusReview our systemMake decision Discussion 9/11/18 RF detector meeting, Yonehara 2

RF detectorWaveguide is here!No groove on flange ElectronicsAll devices are readyI would like to have several spare partsNeed patch panel to convert N-Type to SMA Cut/terminate heliax + make jumper Adjust cable length & add jumperORC + Safety assessmentLoading test is underway RF installation will be done right after the loading testORC inspection will be carried out after installation Present status 9/11/18 RF detector meeting, Yonehara 3

WaveguideAdding groove takes at least a couple of daysIf MI engineering group is ready to install the RF device, we should provide the full structure We need a decisionDo we really need a groove?If we have a groove, the device can hold a pressure w/o gas flow If no groove, we need to flow an ionization gas to keep a certain pressure What is the matter? I do not see any trouble on this option Waveguide 9/11/18 RF detector meeting, Yonehara 4

Let us setup full structure! See circuit diagram on next slideCalibrationRF cavity Bring the cavity in the service building and calibrateCableMeasure insertion loss with the full structure Spectrum Measure spectrum of the system with the full structure Linearity Measure linearity of RF signal Electronics 9/11/18 RF detector meeting, Yonehara 5

Circuit diagram 9/11/18 RF detector meeting, Yonehara 6 NWA Orange 20 dB 1 W 10 dB 5 W White Blue Green Filter 2.45 GHz resonator Real-time RF power meter 10 dB 10 dB N-type to SMA SMA to N-type Jumper Make a patch panel to convert N-type and SMA Adjust cable length Cut short White and Orange Keep Blue and Green as original Make a jumper

Loading testEngineering note submitted on MondayHazard Analysis (HA) will be updatedSWIC is off Wait for the MI engineering groupLoading test and RF device installation will take place simultaneouslyORC All documents submitted and accepted Inspection will carry out after RF installation ORC + Safety Assessment 9/11/18 RF detector meeting, Yonehara 7

Setup full structure of electronicsCut/terminate cable (Tue-Wed)Make jumper (Tue-Wed)Make a patch panel (Tue-Fri) Make remote switch (Tue-Wed)RF signalRF calibration (Tue-Wed) Bring the RF detector in the MI-40 SB Assemble waveguide Measure RF calibration Spectrum (Wed-Fri)Linearity (Wed-Fri) Task list 9/11/18 RF detector meeting, Yonehara 8