th 2013 LS1 Committee LSC 25 th Meeting D Delikaris TECRG Cryogenics activities report Agenda Update on Cryogenic Activities Preventive Maintenance Major overhauling Helium Cold Boxes ID: 552154

repair bellows amp work bellows repair work amp dfbao dfba lhc gimbal header progress additional damaged overhauling weeks schedule

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "October 18" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1
Slide2

October 18th , 2013LS1 Committee (LSC)- 25th Meeting

D. Delikaris, TE-CRG

Cryogenics activities reportSlide3

AgendaUpdate on Cryogenic Activities:

Preventive Maintenance - Major overhaulingHelium Cold Boxes repairs in LHC P2-P8-P6

cryoplants

QRL compensator bellows (Headers C & D)

DFBA

splice consolidation

DFBA gimbal bellowsSlide4

Preventive maintenance

C199 contract for Preventive & Corrective maintenance activities

Investigation launched to understand the “baseline

vs

work orders

vs

work progress” issue:

Work progress

on schedule

wrt

to LS1 planning; shifted with respect to the original CRG baseline (non-adapted to real work progress tracking)

Discrepancy between work progress & work orders (WO) completion

:

due to open WO that can only be closed at a later stage & dates

Remaining actions:

Work order line to be completed

wrt

expected milestones for closure

A new version of the

baseline

will be

definedSlide5

Major overhauling; Dashboards

Helium screw compressors

3.3 kV electrical motors

Everything on track

Delayed delivery of

Kaeser

compressors

caused by additional corrective maintenance

task (rotors replacement)Slide6
Slide7

Major overhauling (compressors & 3.3 kV motors)

Reception from manufacturer and…

…installation, coupling

and alignment at LHC P6Slide8

P2 18 kW LHC cold box repairL

eak repaired on medium pressure He circuit to insulation vacuum (heat exchanger)First tightness testing: done

Reinstallation of MLI: underway

Closing of the vacuum jacket: w 44-45

Vacuum pumping: w 46

Final testing: w 47

1

2

3

Matter removal for two stage welding

Intermediate stage

Final stage

Excellent work from

Fives

Cryogenie

(FR)Slide9

P8 18 kW LHC cold box repairL

eak repaired on N2 circuit of to insulation vacuum (pre-cooling heat exchanger)First tightness testing: done

Reinstallation of MLI: underway

Closing of the vacuum jacket: w 44-45

Vacuum pumping: w 46

Final test: w 47

Leak observed

Matter removal

Final weldingSlide10

P6 18 kW LHC cold box repair

- Leak to be repaired on SS/AL transition, He to insulation vacuum

- Spare ordered (Japan), expected mid Nov.

- Order

done; repair to be done by

Linde

end of Nov.

Aluminium to Stainless Steel transition DN400

HP

LP

MPSlide11

QRL Headers C & D compensator x-rays statusSlide12

QRL Headers C & D compensator repair status

Header D in the LS1 planning

Additional information:

-

Header D in 14L2:

external envelope was open,

dedicated spare testing is underway

-

Header D:

4 additional spares available

-

Header E:

31/64 (LHC all sectors) compensators checked and OK (partially visible on line C x-ray)

-

Headers C & E new spares:

3 offers requested mid August, only one feedback from Witzenmann received, order will be sent next week with 12 weeks of delivery time for 30 DN100 and 15 DN80Slide13

DFBA 13 kA splices consolidation

Schedule shift caused by:

- Extra time for repair of non conformities (quality checks, geometrical) for DFBAN & DFBAO

- Discovery of damaged bellows in DFBAO

- Personnel illness (one)

Forecast:

- Disturbance due to disconnection (same team as splices) of DFBAK (for repairing the bellows) will add 1-2 weeks

- Training of additional personnel (existing) for recoverySlide14

DFBA gimbal bellowsFollowing the discovery of a damaged bellow in the DFBAO by using a

double endoscope inspection technique, a global inspection of the bellows is being carried out:t

o be completed by end of the w 43 on all DFBAs

Current status (4/32; 12.5 %):

2 DFBAs with upper bellows damaged (DFBAK collapsed &

probably leaking

,

DFBAO damaged but not leaking

)

2 DFBAs with lower gimbal damaged;

not leaking

(DFBAI & DFBAF)

First inspection of DFBAO

Double endoscope inspection of DFBAO

upper bellows

Lower bellowsSlide15

DFBA gimbal bellows: repair strategy

- Lower bellows:

in-situ repair

, 3 weeks each for DFBAI and DFBAF respectively (patching solution)

- Upper bellow DFBAK:

workshop repair

, bellows replacement, learning form opening

- Develop

local internal solution for DFBAO

by drilling the inner layer of the 2-layer bellow thus eliminating the helium accumulation issue and reinforce the mechanical resistance of the bellow by encapsulating it in an epoxy shell. Decision for DFBAO in 6 weeks.

DFBAK

closed 24/02/2014

DFBAO

closed,

if local

repair, 17/01/2014

DFBAO

closed,

if

workshop repair, 09/04/2014Slide16

ConclusionsPreventive Maintenance - Major overhauling

C199: Discrepancy on baseline/work progress/work orders clarified and to be closely followed; major overhauling of helium compressors and 3.3 kV electrical motors on schedule

Helium Cold Boxes repairs in LHC P2-P8-P6

cryoplants

Very good progress; P2-P8 completed; P6 on schedule

QRL compensator bellows

D

amaged bellow on header D in the repair planning compliant to LS1; Header C bellows repair work ahead of schedule; spares procurement for all bellow’s type on going

DFBA

splice

consolidation

Despite additional resources work progress remains constantly shifted from the baseline (originally expected to recover by end of 2013) due to geometrical non-conformities, personnel illness and the discovery of a 4

th damaged gimbal interfering with teams load. Training of additional personnel scheduled

DFBA gimbal bellows

On going cross-check by double endoscopy of all DFBAs bellows;

DFBAI, DFBAF: in-situ repair (patching)

DFBAK: workshop repair (bellows replacement)

DFBAO: development of dedicated local technical approach for in-situ repair prioritized; final decision in 6 weeks, if negative, workshop repair

(bellows replacement

)Slide17