UPO May 3 2013 Didier Contardo Jeff Spalding Followup from last meeting L1Trigger TDR https cmsdocdbcernchcgibinDocDBRetrieveFiledocid11657ampversion1ampfilenamel1triguptdrpostcwrpdf ID: 469462

workshop cms groups atlas cms workshop atlas groups lhcb alice week amp replacing feasibility document cern desy electronics ecfa preparatory christoph chairs

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "1 News and Miscellaneous" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

1

News and MiscellaneousUPO May 3 2013Didier Contardo, Jeff Spalding

Follow-up from last meeting

L1-Trigger

TDR:

https

://cms-docdb.cern.ch/cgi-bin/DocDB/RetrieveFile?docid=11657&version=1&filename=l1triguptdr_postcwr.pdf

Final approval for plots and tables yesterday

Release to the LHCC next week

Working draft of common note with ATLAS on

pile-up at HL-

LHC:

https

://cms-docdb.cern.ch/cgi-bin/DocDB/RetrieveFile?docid=11823&version=1&filename=pileup_phase2-1.

pdf

Mean pile-up 128, range with uncertainties 115 to 140, simulate at 140

Upgrade Conference committee and editorial

board:

As discussed last time, please, provide representatives, Projects, WGs, Cross-coordination…

Snowmass white paper

Cost/Scope exercise

Upcoming events:

TC workshop on May 23: specifically to address questions for phase 2 ahead of DESY

DESY

week

ECFA workshopSlide2

Snowmass white paper

CMS will update the physics reach projection studies done for ESPGCoordinated by Jim Olsen Initial document to be approved by CMS mid-June, final document end of JulyWill include further studies of systematic, statistical and theory limitsPossibly studies with phase 1/phase 2 detectors in final documentWe may also provide information for the instrumentation working group on detectro concepts and technology R&Ds2Slide3

Cost and scope exercise

As discussed last time, we will need to prepare a document for the RRB on scope and cost modeling for phase 2 Baseline scenarios and options (with cost) will come from DESY week along with targeted R&D and studiesPrepare an internal document for July 29 MB/FB and then release to the collaborationProceed with simulation studies: with the goal of preliminary performance results by the ECFA workshop in Oct.Document for the RRB to the MB in Sept.

3Slide4

DESY week

Upgrade week at DESY Monday-Friday June 3-7https://indico.cern.ch/conferenceOtherViews.py?confId=236161&view=standardCurrently 183 registrations – registration close on 24th of MayNeeds to finalize the agenda in the next weekNeed session chairs/speakersRequest parallel sessions to make their own agendas to be linked from the week agendaDiscussion at this meeting…4Slide5

5

Preparatory groups are formed with representatives from each experiment, and from CERN theory and accelerator divisions:The groups have two chairs, one from ATLAS and one from CMS plus few identified experts in relevant sub-topics of each area. The chairs will report to the workshop SC The groups will meet to organize the sessions and identify key topics to be addressed (the meetings will be open across groups)Guidelines proposed by the SC will be finalized once groups are formed

A common meeting of the preparatory groups is scheduled on June 10 to report on progress and prepare the workshop agenda

A common document of few pages summarizing the workshop outcome and future steps will be prepared with the chairs of the groups

The discussions within the preparatory groups will be presented at the UPO and in the regular Upgrade meetings (including Projects, WG and Cross-Coordination meetings)

Material for the workshop will be approved in the Upgrade plenary session at the CMS week in

Taipei

1

st

HL-LHC Experiment ECFA workshop, Aix-les

-

Bains

Oct

. 1-3Slide6

ECFA workshop Oct. 1-3: preparatory groups

6

Physics goals and performance reach

CERN Theory:

G.Salam

ALICE: Peter

Braun

Munzinger

,

Andrea

Dainese

ATLAS:

Leandro

Nisati

, Pippa

Wells, Bill Murray

CMS:

Chris Hill

, Markus

Klute

,

Isabell

Melzer-

Pellmann

LHCb

:

Tim

Gershon

,

Guy Wilkinson

Tracking devices and associated electronics and readout

ALICE: Vito

Manzari

,

Werner

Riegler

ATLAS:

Ingrid

Gregor

, Didier

Ferrere

, Craig

Buttar

CMS:

Duccio

Abbaneo

, Francois

Vasey

,

Stefano

Mersi

 

LHCb

:

Massimiliano

Ferro-

Luzzi

Calorimetry

and

associated electronics and readout

ATLAS:

Francesco

Lanni

, Alberto Valero

CMS: Dave

Barney,

Pawel

.

De

Barbaro

,

Marcello

Mannelli

 

LHCb

:

Frederic

Machefert

Muon

Systems

and associated electronics and readout

ALICE: Pascal

Dupieux

ATLAS:

Christoph

Amelung

, Oliver

Kortner

 

CMS: Alexei

Safonov

,

Marcello

Abbrescia

,

Kerstin

Hoepfner

LHCb

:

Alessandro  

CardiniSlide7

ECFA workshop Oct. 1-3: preparatory groups

7

Trigger

/

DAQ/Offline/Computin

g

ALICE: Pierre

Vande

Vyvre

, Thorsten

Kollegger

,

Predrag

Buncic

ATLAS:

David

Rousseau

, Benedetto

Gorini

, Nikos

Konstantinidis

CMS:

Wesley

Smith

,

Christoph

Schwick

,

Ian

Fisk,

Peter Elmer

LHCb

: Renaud

Legac

,

Niko

Neufeld

Electronics

and read-out

systems

ALICE: Alex Kluge

ATLAS:

Philippe Farthouat

, Maurice

Garcia

-Sciveres, Tony

Weidberg

CMS:

Magnus

Hansen

, Jorgen Christiansen

LHCb

: Ken Wyllie

Long Shutdown constraints and radiation and activation

effects

ALICE:

Werner

Riegler

ATLAS:

Olga

Beltramello

,

Beniamino

Di

Girolamo

CMS:

Wolfram

Zeuner

,

Christoph

Schaefer

LHCb

:

Rolf Lindner

Accelerator

and Experiment

interface

CERN Accelerator: L. Rossi, O.

Bruning

ALICE:

Hannes

Wessels

ATLAS:

Christoph

Rembser

,

Beniamino

Di

Girolamo

, Antonio

Sbrizzi

CMS: Wolfram

Zeuner

,

Maria

Chamizo

Llatas

(CMS

)

LHCb

:

Burkhard

SchmidtSlide8

Discussion: Example Questions for TC workshop

We will meet with Austin/Wolfram to discuss the main questions and how to formulate them. List 1: DriversFeasibility of replacing the EB electronics (this one answered)Feasibility of replacing the HE absorber (assume a bolt-on new calorimeter in sections)Feasibility of replacing the HE mega-tiles (implication for EE services…)Feasibility of replacing the CSC FE electronicsFeasibility of replacing the DT ROB/ROSFeasibility of replacing the HF with an endcap plug What are the likely configuration changes in the HF region required by the accelerator/shielding upgradesList 2

Limitations on access for maintenance with sustained running at 5E34 (

eg

. Replacement of inner pixel layers during YETs)

Feasibility

of eta extension (tracking, calorimeter and

muons

)

Feasibility of new tracker services on YB0: power, fibers and cooling

Feasibility of replacing the HF

fibers

Can EE be craned out? Would a replaced HF stay in garage for ever

?List of major TC infrastructure workWhere “Feasibility” includes:

Technical/mechanical considerations

radiation/activation issues (and ability to mitigate)

interference with other work/access and duration of work in shutdown (for example: requires sole control of +end for 8 months)

8