/
Monday – VSP Room Monday – VSP Room

Monday – VSP Room - PowerPoint Presentation

lois-ondreau
lois-ondreau . @lois-ondreau
Follow
381 views
Uploaded On 2017-05-25

Monday – VSP Room - PPT Presentation

weekly checks Visually Check Hvac system for leaks amp valve settings Fresh water system for leaks amp valve settings VSP linkage Autopilot connections Ventilation fan switch and breaker ID: 552066

check vsp monday water vsp check water monday amp valves roomweekly checks overboard valve tank pump level oil fuel

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Monday – VSP Room" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Monday – VSP Roomweekly checks

Visually Check:

Hvac system for leaks & valve settings

Fresh water system for leaks & valve settings

VSP linkage

Autopilot connections

Ventilation fan switch and breaker

Fuel Valves at the fwd tank for leaks & settings

Fuel valves at the transfer pipe for leaks & settingsSlide2

Monday – VSP RoomWeekly Checks

Cycle all valves in the VSP room

Check oil level in the VSP units

Check oil level in the VSP header tanks

Check bilge for water and pump or suction as needed

Check fresh water system for leaks

Check hot water heater for heat

Fill day tanks and check and record fuel level in the fwd

fuel storage tank

Pump out grey water tank as needed

Check hydraulic oil storage tank level – fill as needed

Check and replace lights

Check ventilation fan plenum for water – drain as needed

Check general alarm bell & light

Check phone & intercom # 107

Clean / wipe / wash / service all areas as neededSlide3

Monday - VSP Room

Pump out grey water tank

Cycle the overboard valve located on the starboard side

Pump switch

50 gal. tank

Overboard valveSlide4

Monday – VSP RoomFill day tanksStick and measure main storage tank

Measure sight gauge for the fwd storage tank

Record fuel onboard

Between each colored mark is 1000 gallonsSlide5

Monday – VSP Roomweekly checks

Cycle VSP cooling overboard valves P&S

Cycle HVAC overboard valve starboard side

Cycle grey water overboard valve starboard side

Port Side

VSP coolingSlide6

Monday – VSP Roomweekly checks

HVAC overboard

Grey water overboard

VSP cooling

Starboard SideSlide7

Monday – VSP Roomweekly checks

Check VSP unit oil level P & S

Dipstick location

Replace gently to avoid cross threading

Operating range

Look for signs of water (foam/milk)Slide8

Monday – VSP Roomweekly checks

Tank Fill

Sight gauge

Refill at this Level

Discharge – Oil outSlide9

Monday – VSP Roomweekly checks

Remove / Lift floor plate and check for water

NEVER PUMP OILY WATER OVERBOARD

Start pump and listen for prime – NEVER run dry – use prime valves if necessary

Close all valves when finished

Check under this floor plate

On / Off

VSP Room Valve

Prime valves

Bilge suction under floor plate