Construction Update 1 GlueX Collaboration Meeting JLab Oct 46 2012 J M c Intyre A Barnes R Jones 2 Outline Contract Status QA plan construction plan Preparations for construction ID: 369656

gluex 2012 meeting collaboration 2012 gluex collaboration meeting october construction jlab populating area microscope jlaboctober tagger yield station gain

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Tagger Microscope" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Tagger Microscope

Construction Update

1

GlueX Collaboration MeetingJLab, Oct. 4-6, 2012

J. M

c

Intyre, A. Barnes, R. JonesSlide2

2

OutlineContract Status

Q.A. planconstruction plan

Preparations for constructionpopulating the construction spaceMicroscope electronicsadaptation for 50 micron pixel SiPMsscintillation yield with cosmic raysGlueX Collaboration Meeting, JLab

October 4-6,

2012Slide3

3

Contract StatusConstruction Plan

Draft – Sept. 2012~ 50 page document

Detailed instructions for constructionCurrently revising based on feedbackCopy location:https://docs.google.com/document/d/15OreBfdhb5mdpdXz6KMTVQt8ZWMU-4OV9i8Y6vp97Ms/editQuality Assurance & Acceptance Test PlanDraft – Sept. 2012

Currently revising based on feedback

Copy location:https://docs.google.com/document/d/1JL40gx7tPDDFu4aSiad3fTemAp0yiVBPI6D8FB5zb6o/edit

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide4

4

Construction StatusContract timeline

Tagger Microscopet0 - October 2012  ???

GlueX Collaboration Meeting, JLabOctober 4-6, 2012Slide5

5

Construction StatusContract timeline

Active Collimator

GlueX Collaboration Meeting, JLabOctober 4-6, 2012Slide6

6

Preparations for Construction

After

Before

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide7

7

Populating the Construction Area

Fiber Cutting Station

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide8

8

Populating the Construction Area

Fiber Splicing Station

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide9

9

Populating the Construction Area

Heat Treating Fibers

GlueX Collaboration Meeting, JLabOctober 4-6,

2012Slide10

10

Populating the Construction AreaHeat Treating Fibers

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide11

11

Populating the Construction Area

Heat Treating Fibers

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide12

12

Populating the Construction Area

Fiber Testing Station (inside a clean room)

Allows for testing of:Single fibersBundled fibersCooling unit for the electronics’ enclosure

Dark Box

(main frame)

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide13

13

Populating the Construction Area

Staging Areas &Work Stations

Bundling TableHeat Treating Station

Fiber Testing Station(Clean Room)

Work Table

(Clean room)

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide14

14

Populating the Construction Area

Ventilation Unit

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide15

15

Populating the Construction Area

Additional Infrastructure

Lighting & Outlets

Bundle Storage

GlueX Collaboration Meeting, JLab

October 4-6,

2012Slide16

16

Tagger Microscope ElectronicsExperimental setupCurrent testing bench:

Dark chamberNIM bin and modules

Can be used for all aspects of quality assuranceGlueX Collaboration Meeting, JLabOctober 4-6, 2012

Second testing bench:

New dark chamberJLab FADC

Computer with CODA

Can be used for all aspects of quality assuranceSlide17

17

Tagger Microscope ElectronicsElectronics changesChange from 25 µm to 50 µm SiPM:

Gain ~2.7x larger with 50 µmLowered amplifier gain to compensate

Found 30% power reductionGlueX Collaboration Meeting, JLabOctober 4-6, 2012Differences:Increased 3 resistors while keeping operating voltages the same

Included parallel RC circuit to push low frequency gain ‘bump’ out of the operating range

50

µm

25

µmSlide18

18

Tagger Microscope ElectronicsFuture plans

Engineering update of preamplifier, backplane, and control boardsSubmit design for fabrication and component populationSolder Eurocard connectors and SiPMs in lab

Perform basic board quality testsMeasure output pulse shape, gain, cross-talkRun boards for an extended period of time to burn them inGlueX Collaboration Meeting, JLabOctober 4-6, 2012Slide19

19

Tagger Microscope Scintillation Yield

Bench Tests with Cosmic Rays

(from June mtg, 25 micron pixel SiPM)GlueX Collaboration Meeting, JLabOctober 4-6, 2012

pedestal tail

1pe = 5 channels

adc channels

single fiber readout with 250MHz FADC

trigger on the same channel

only tail of spectrum visible

from cosmic rate integral: median ~16pe

130 pe / axial electron trackSlide20

Tagger Microscope Scintillation Yield

Bench Tests with Cosmic Rays : update

(since June mtg, 50 micron pixel SiPM)

GlueX Collaboration Meeting, JLabOctober 4-6, 2012

trigger

gain is re-balanced at 5chan/pixel

cosmic yield: 30 pe (MP)

300 pe/axial electron track

(specification is 220)

sum column 1

sum column 3

Slide21

21

SummaryQuality assurance & acceptance test plan being revised

Construction plan written and being reviewedInfrastructure needed for construction is ~85% completeOn track for readiness review (previously estimated - 11/2012)