Dharampur Project Payment Plan Booking Amount 10 Within 45 Days Completeion of basement floor slab 20 1st Qtr Completeion of slab upto road level 15 2nd Qtr Completeion of RCC structure ID: 633882
Download Presentation The PPT/PDF document "WELCOME Eco Pine Homes-I (" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
WELCOMESlide2
Eco Pine Homes-I (
Dharampur
Project)Slide3Slide4Slide5Slide6Slide7Slide8Slide9Slide10
Payment Plan:
Booking Amount:
10%
Within 45 Days: Completeion of basement floor slab
20%
1st Qtr: Completeion of slab upto road level
15%
2nd Qtr: Completeion of RCC structure
15%
3rd Qtr: Completeion of all bricks work
12.50%
4th Qtr: Completeion of wooden work and floor tiels
12.50%
5th Qtr: Completeion of all work
10%
6th Qtr: Possession
5%
Total
100%
*Possesion in 1.5 Yrs(After 45 days)Slide11
Specifications:
Wall
:
POP punning with acrylic
Floors
:
Marble/equivalent
Vitrified tiles/equivalent
Doors
:
Hardwood door frame with
Pannelled
Door Shutters.
Window/Glazing :Hardwood frame and shutter with double rebate.Ceiling :Acrylic Emulsion paint.
Structure: Earthquake Resistant RCC Frame structure with brick filler wallsTHE LIVING ROOM
Walls:2’ high ceramic tiles above the counter/equivalent.Floors:Ceramic tiles/vitrified tiles/equivalent.Doors:Hardwood door frame with glazed/pannelled shutter .Window/Glazing :Hardwood frame and shutter with double rebate.Ceiling :Acrylic emulsion paint.Wood Work:Modular woodwork with accessories.C.P. Fittings Sanitary Fixtures:Double bowl stainless steel sink with single lever fittings.
THE KITCHENSlide12
Specifications:
Floors
:
Ceramic tiles
Ceiling
:
Permanent paint finish.
THE BALCONY
Walls
:
Acrylic emulsion paint
Floors
:
Ceramic tiles
Doors:Hardwood frame with paneled door shutters.
Window/Glazing:Hardwood frame and shutter with double rebate.Ceiling
:Acrylic emulsion paint.THE SERVANT ROOMWalls:Permanent texture/Paint finishCeiling :Permanent paint finish.THE FACADESlide13
Specifications:
Walls
:
POP punning with acrylic
Floors
:
Vitrified tiles, laminated wooden flooring in master bedroom
Doors
:
Hardwood door frame with
paneled
door shutters.
Window/Glazing
:
Hardwood frame and shutter with double rebate.Ceiling :Acrylic emulsion paint.Wood Work:Complete wardrobe woodwork
THE BEDROOMSWalls
:Tiles/equivalentFloors:Ceramic tiles/vitrified tiles/equivalentDoors:Hardwood door frame with pannelled door shutters.Window/Glazing:Hardwood frame and shutter with double rebate.Ceiling :Cement plaster with false ceiling gypsum board or equivalent.C.P. Fittings:Sanitary Fixture:Granite counter, mirrors, sanitary fixture, single lever C.P. Fittings in wash basin & shower. Provision for hot & cold water supply system/equivalent.THE BATHROOMSSlide14
Specifications:
Toilet/ Kitchen Accessories/ fixtures
All the chinaware shall be of
“
Hind ware
”
Make.
The H.W.B. may be provided with the R.C.C. counters and granite on top.
The kitchen shall be provided with Double Bowl Stainless Steel Sink.
The toilets shall be provided with Wall Hung
“
W.C.S.
”
All the tops mixtures will of
“Jaguar” Make.
The kitchen shall be provided with the long mixture of “jaguar make”.Slide15