/
Wildland  Fire Management Information (WFMI) Weather Lesson 7: Post-Trip Documentation Wildland  Fire Management Information (WFMI) Weather Lesson 7: Post-Trip Documentation

Wildland Fire Management Information (WFMI) Weather Lesson 7: Post-Trip Documentation - PowerPoint Presentation

min-jolicoeur
min-jolicoeur . @min-jolicoeur
Follow
343 views
Uploaded On 2019-11-05

Wildland Fire Management Information (WFMI) Weather Lesson 7: Post-Trip Documentation - PPT Presentation

Wildland Fire Management Information WFMI Weather Lesson 7 PostTrip Documentation April 2014 Posttrip Update WFMI Weather module is linked to National Interagency Fire Center NIFC Asset Management System NAMS ID: 763338

asset station trip post station asset post trip select information nams weather date page report rsfwsu annual repair sensors

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Wildland Fire Management Information (W..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Wildland Fire Management Information (WFMI) WeatherLesson 7: Post-Trip Documentation April 2014

Post-trip UpdateWFMI Weather module is linked to National Interagency Fire Center (NIFC) Asset Management System (NAMS) User can update post-trip information through WFMI Weather interface Post-trip Update = Document annual maintenance and repairs

WFMI Weather In the WFMI Weather module, pick Select Station.

Select Station A station can be selected from this list or the Change Selection Criteria button can be chosen. More information about Select Station is in Lesson 4.

Station Page Select NAMS – Post-trip Update on the Station page.

Assign Asset Numbers For stations under a depot, portable return, modified or full ride contract with the Remote Sensing Fire Weather Support Unit (RSFWSU), asset numbers must be assigned. Note: If the station is not under contract with RSFWSU, continue to the Dates field . In the New Asset Number column, the assets ordered from RSFWSU are shown. Select the asset number of the sensor/part that was installed on the station during annual maintenance or repair. If more than one asset was ordered, be sure to select the correct number to assign to that station.

Dates Complete the annual maintenance date, or if this was a repair, fill in the repair date. Tipping bucket zeroed date can be completed, if known.

DCP/Solar Rad DCP program, DCP firmware, and Solar Rad Constant can be completed, as necessary.

Narrative Describe annual maintenance or repair. Include date completed, who performed service, which sensors changed, and additional notes. N ame of person entering information, along with the current date, is automatically entered.

Asset Report A RAWS asset report can be emailed to one or more addresses. Click Submit Post-trip Update button if all information on page is complete.

Updates Submitted to NAMS The page shows that the information was submitted to NAMS.

NAMS Asset Report – Post Trip If a NAMS Asset Report was requested, a confirmation will appear on the page. For stations under contract with RSFWSU, the asset report may show multiple sensors for the station. This is due to both old and new sensors assigned to the station. The old sensors will remain assigned to the station until they are shipped and received at RSFWSU and cleared from the order.