/
Tick@lab  Training Continuing Reviews and Amendments for General AUPs. Tick@lab  Training Continuing Reviews and Amendments for General AUPs.

Tick@lab Training Continuing Reviews and Amendments for General AUPs. - PowerPoint Presentation

mitsue-stanley
mitsue-stanley . @mitsue-stanley
Follow
345 views
Uploaded On 2019-11-20

Tick@lab Training Continuing Reviews and Amendments for General AUPs. - PPT Presentation

Ticklab Training Continuing Reviews and Amendments for General AUPs Not for field notification or observation studies 1 httpslarutrgvedutickatlabdefaultaspx ALLOW POPUPS Ticklab URL ID: 765812

annual review click amendment review annual amendment click protocol left approved version research document training tick tab date protocols

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Tick@lab Training Continuing Reviews an..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Tick@lab TrainingContinuing Reviews and Amendments for General AUPs. Not for field, notification or observation studies 1

https://lar.utrgv.edu/tickatlab/default.aspx***ALLOW POP-UPS*** Tick@lab URL 2

3

1. Left click here to see the list of Approved AUP’s 4 If an Amendment needs to be added, the protocol will be in the “Approved protocols” list. If the protocol needs an Annual Review, the protocol will appear on both lists one month before the due date. However, if the PI decides to do the Annual Review prior to one month of the due date, he will need to go first into the “Approved protocols” list to add the Annual Review. Make sure you are in the AUP tab.

2. Left click in the desired protocol 5

3. Scroll down to access the files in the protocol 3. Right click 6 4. Left click in Amendment or Annual Review ** Clicking on the Annual Review or Amendment option will create a new version of the original document.

7 5. This pop-up will appear. Write a comment about the amendment or just leave it blank and click  Ok.

8 A new version of the original protocol will be created. This version will appear in both, the “Approved protocols” and “Protocols in review” lists. v

9 4. Left click on Check-out document 3. Right click

10 5. Left Click the newest version of the protocol. **A little paper with a green arrow will appear on the side of the document that was checked-out. If the document is already checked-out by you or someone else, a little paper with a red cross circle will appear on the side. If this happens to you, please contact the Office of Research Compliance.

6. Make the necessary changes throughout the form AND fill in the appropriate Annual Review and/or Amendment tab(s). **Both tabs will appear for annual reviews. For the amendments, only the amendment tab appears. 11

If personnel was added make sure they do their training…CITI (https://about.citiprogram.org/en/homepage/ ) The Office of Research Compliance has an additional training on how to enroll and add trainings on CITI. Make sure to request if needed. Required trainings: General training Working with the IACUCWorking with … (the animal you are doing research with) If surgery or wildlife (specific to training) Wildlife Research Aseptic surgery module Procedure Training Verification Specific to procedures 12

13 7. Once everything is done. Go to the Action button and SAVE!!

14 8. When you are done reviewing, left-click back

15 10. Right click 11. Check-in document

16 After reviewing the protocol, click on IACUC Administrator Review button for the DMR, revisions or approval. 10. Right click 9. Left click

REMINDERS Only APPROVED protocols have the option to do an Annual Review or Amendment. Only one submission can be submitted and be in the revision process at a time. Make sure to keep in mind your Annual review date when you want to make multiple modifications. You can do Annual Review AND an Amendment at the same time. Just make sure to complete both the Amendment and Annual Review tabs.Only ONE Submission (version) may be in the review process at a time. You may NOT have an amendment under review and then submit another amendment or annual review concurrently. You will have to wait until the first amendment is approved before you may start another amendment or annual review. MAKE SURE TO CHECK BACK ON THE STATUS OF YOUR PROTOCOL PERIODICALLY ON TICK@LAB 17

QUESTIONS…Contact Lynne Depeault Research Compliance Coordinatorlynne.depeault@utrgv.edu (956) 882-7731 18