sommaire xF030xF02FxF030xF007xF005xF01FxF017xF007xF020xF013xF028xF01AxF007xF016xF017xF01CxF01CxF018xF01AxF01CxF027xF014xF018xF020 ID: 197684
Download Pdf The PPT/PDF document "..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
sommaire sommaire YEAR 2008 TWY(actualfigures) TWY(actualfigures) UUSS(actualfigures) simulationT(likeNantes) TWY(3-year forecastafterimplementation) LINE 1 15 km LINE 2 20 km 12 Lines Same as L1 tram based on year2008 LINE 3 22 km PHYSICAL DATARollingStock33 trains (285 places)24 trains (210 places)136 buses33 articulatedNGV buses (105 places)23 trains (285 places)Veh/km (in 1000)1,8011,4705,3191,8001,777Places offered(in 1000 PKO)501,100308,700425,800189,000506,400Transportedtravelers(in thousands) 30,00013,60018,62011,30022,000 INVESTMENT COST (in millions of 2004 euros) 407 455 105 139 450 2008 ANNUAL COSTCOST per PKO (places/km offered)depreciationand financialexpenses27.9 M31.2 M9.2 M9.5 M30.8 Moperating15.9 M11.1 M30.4 M14.3 M13.4 M 2008 total 43.8 M 42.3 M 39.6 M 23.8 M 44.2 Minvestment5.6 cents10.1 cents2.2 cents5.0 cents6.1 centsoperating3.2 cents3.6 cents7.1 cents7.6 cents2.6 cents TOTAL 8.8 cents 13.7 cents 9.3 cents 12.6 cents 8.7 cents COST per TRAVELER transportedinvestment0.932.290.490.841.40operating0.530.821.631.270.61 TOTAL 1.46 3.11 2.12 2.11 2.01 sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire sommaire