Download Presentation The PPT/PDF document "AD/ELENA (B193)" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
AD/ELENA (B193) Present and future projects
F. Butin / ELENA collaborationSlide2
Plans for AD adaptationsAll details of this talk are in a note about to
be published on EDMS (1269362)F. Butin / ELENA collaborationSlide3
Ongoing projects: bdg 93Bat 93
is in phase 2 of its development:60 m2 CR for ATRAP experiment
60 m2 meeting room45 m2 CR for BASE27 m2 cafeteriaAdditional
toiletsF. Butin / ELENA collaborationSlide4
Bdg 93 installation in progressF. Butin / ELENA collaborationSlide5
Future ATRAP control roomF. Butin / ELENA collaborationSlide6
Ongoing projects: bdg 93Stage 2
will be completed by end of April 13ATRAP CR removal in June
13, to allow BASE exp area installation below
F. Butin / ELENA collaboration
BASE
Exp. areaSlide7
Future project: bdg 93 stage 3F. Butin / ELENA collaboration
2nd
half
2014:
CR’s
for ALPHA,
ASACUSA,
Gbar
and
sparesSlide8
Future projects: bdg 93 stage 3Global idea
is that existing CR’s replaced by local control area plus
soldering workshopExtra storage space to be
attributed in bdg 393Details remain to be
agreed with ALPHA and ASACUSA
F. Butin / ELENA collaborationSlide9
Ongoing porjects: bdg 393Bdg
393 CE project is on its way. Contractor
selected, first digging expected mid April
Relocation of EL cables in progressIntegration of all services in progress
F. Butin / ELENA collaborationSlide10
Ongoing project: bdg 393F. Butin / ELENA collaborationSlide11
Future project: installation in bdg 393Allocation of storage
space (mid 2014)Installation of a common cleaning room (
mid 2014)Relocation of AD workshop (mid 2014)Relocation of kicker generators (
early 2015)Installation of horn test bench (date tbc)
F. Butin / ELENA collaborationSlide12
Kicker generators relocationF. Butin / ELENA collaborationSlide13
Cleaning rooms
relocationATRAP cleaning room to be replaced
by BASE exp areaWill be dismantled as of
mid April 13Temporary solution will be
proposed inside AD hallWill
be replaced by common
cleaning
room (
mid
14)
F. Butin / ELENA collaboration
Cleaning
Room (5x4 m2
)
Workshop (5x6 m2)Slide14
Cleaning rooms relocationALPHA using laser room for cleaning
: will need provisional cleaning room as of April 13, then
use common cleaning room in 393 as of mid 14ASACUSA
using 1 chemical room and 1 cleaning room. Chemical room to
be dismantled to make
space for ELENA mid 2014: can
be
integrated
in
common
cleaning
room ?
Cleaning
room
used
for
storage
…
F. Butin / ELENA collaborationSlide15
Cleaning rooms relocationPropose to relocate ASACUSA cleaning
room in common cleaning room in bat 393 (as of mid 2014)Propose to «shift» whole ASACUSA laser room to gain 40 m2 for a new
exp area (LS2: 2018)F. Butin / ELENA collaborationSlide16
RF cubicles and harmonic filtersRF
cublicles and harmonic filters need to be relocated
to make space for ELENA and for BASE (August 13)
F. Butin / ELENA collaborationSlide17
Rack platform and gangwayInstall large gangway to provide
access to racks, Gbar, bdg 393 and visits to ELENA (Nov
13)Racks to be relocated on 2
levels (Jan 14)Modify stoch. cooling
platform
F. Butin / ELENA collaboration