Present and future projects     F Butin ELENA collaboration Plans for AD adaptations All details of this talk are in a note about to be published on EDMS 1269362 F Butin ELENA collaboration ID: 576569

butin elena room collaboration elena butin collaboration room cleaning bdg mid 393 relocation 2014 installation future common area base

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "AD/ELENA (B193)" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

AD/ELENA (B193) Present and future projects

  

F. Butin / ELENA collaborationSlide2

Plans for AD adaptationsAll details of this talk are in a note about to

be published on EDMS (1269362)F. Butin / ELENA collaborationSlide3

Ongoing projects: bdg 93Bat 93

is in phase 2 of its development:60 m2 CR for ATRAP experiment

60 m2 meeting room45 m2 CR for BASE27 m2 cafeteriaAdditional

toiletsF. Butin / ELENA collaborationSlide4

Bdg 93 installation in progressF. Butin / ELENA collaborationSlide5

Future ATRAP control roomF. Butin / ELENA collaborationSlide6

Ongoing projects: bdg 93Stage 2

will be completed by end of April 13ATRAP CR removal in June

13, to allow BASE exp area installation below

F. Butin / ELENA collaboration

BASE

Exp. areaSlide7

Future project: bdg 93 stage 3F. Butin / ELENA collaboration

2nd

half

2014:

CR’s

for ALPHA,

ASACUSA,

Gbar

and

sparesSlide8

Future projects: bdg 93 stage 3Global idea

is that existing CR’s replaced by local control area plus

soldering workshopExtra storage space to be

attributed in bdg 393Details remain to be

agreed with ALPHA and ASACUSA

F. Butin / ELENA collaborationSlide9

Ongoing porjects: bdg 393Bdg

393 CE project is on its way. Contractor

selected, first digging expected mid April

Relocation of EL cables in progressIntegration of all services in progress

F. Butin / ELENA collaborationSlide10

Ongoing project: bdg 393F. Butin / ELENA collaborationSlide11

Future project: installation in bdg 393Allocation of storage

space (mid 2014)Installation of a common cleaning room (

mid 2014)Relocation of AD workshop (mid 2014)Relocation of kicker generators (

early 2015)Installation of horn test bench (date tbc)

F. Butin / ELENA collaborationSlide12

Kicker generators relocationF. Butin / ELENA collaborationSlide13

Cleaning rooms

relocationATRAP cleaning room to be replaced

by BASE exp areaWill be dismantled as of

mid April 13Temporary solution will be

proposed inside AD hallWill

be replaced by common

cleaning

room (

mid

14)

F. Butin / ELENA collaboration

Cleaning

Room (5x4 m2

)

Workshop (5x6 m2)Slide14

Cleaning rooms relocationALPHA using laser room for cleaning

: will need provisional cleaning room as of April 13, then

use common cleaning room in 393 as of mid 14ASACUSA

using 1 chemical room and 1 cleaning room. Chemical room to

be dismantled to make

space for ELENA mid 2014: can

be

integrated

in

common

cleaning

room ?

Cleaning

room

used

for

storage

F. Butin / ELENA collaborationSlide15

Cleaning rooms relocationPropose to relocate ASACUSA cleaning

room in common cleaning room in bat 393 (as of mid 2014)Propose to «shift» whole ASACUSA laser room to gain 40 m2 for a new

exp area (LS2: 2018)F. Butin / ELENA collaborationSlide16

RF cubicles and harmonic filtersRF

cublicles and harmonic filters need to be relocated

to make space for ELENA and for BASE (August 13)

F. Butin / ELENA collaborationSlide17

Rack platform and gangwayInstall large gangway to provide

access to racks, Gbar, bdg 393 and visits to ELENA (Nov

13)Racks to be relocated on 2

levels (Jan 14)Modify stoch. cooling

platform