Dax Tripp, Jeffrey Howell, Tiffanie Martin, Ben Ruby, Alice Cook - PPT Presentation

Dax Tripp Jeffrey Howell Tiffanie Martin Ben Ruby Alice Cook Dr Jimenez Wes Olive Psyche Bryant May 5 2015 FreestockFloor Stock Vendor Managed Inventory Endries 1 Problem Statement FreestockFloor Stock Typically Comprise Commonly used Fasteners which are Hardware that Adjoin Objects us ID: 772192

outs stock floor industrial stock outs industrial floor freestock usage components time engineering process source annual endries philips code

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Dax Tripp, Jeffrey Howell, Tiffanie Mart..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Dax Tripp, Jeffrey Howell, Tiffanie Martin, Ben Ruby, Alice Cook Dr. Jimenez, Wes Olive, Psyche Bryant May 5, 2015 Freestock/Floor Stock Vendor Managed Inventory -Endries- 1

Problem StatementFreestock/Floor Stock Typically Comprise Commonly used Fasteners which are Hardware that Adjoin Objects using Screws, Bolts Among Other ComponentsPhilips Freestock/Floor Stock Components List Currently Also Includes Wire, Glue, Tape, Bags Among OthersImpact of Not having the Correct Mixture of Freestock/Floor Stock Components?Missed Customer OrdersAssembly DowntimeFirefighting Confusion on Replenishment ProcessOwnership of ProcessWhat is Freestock/Floor Stock? Out of all the orders that affected Schedule Attainment in December 2014, 13% were related to Freestock/Floor stock Stock -Outs What is the Current Problem? Goal: Reduce stock outs by 25%

DefineDecision Tree for Scope of ProjectUtilized Six Sigma Tools:SIPOC Process to Identify Scope of the Process our Project will Address

MeasurementData GatheredProcess Chart3.8% Value AddedDPRCustomer AttainmentEndries Annual UsageUsage, Lead Time, VMI…Philips Item Master43% AlignmentBin Measurements23% within 20% EOH

Freestock IssuesStock Outs and Current Process Endries VMI Classification Months UsageLead Time Component TypePhilips VMI ClassificationAnnual Usage

AnalyzeDesign of Experiments to Verify Root Causes for Stock OutsSignificant factors have p-values < 0.05R2 = 0.79Adj R2 = 0.4Most significant factor is the interaction between Lead Time and Annual Usage.Analysis of variance table [Partial sum of squares - Type III]Source Sum of Squares df Mean Square F Value p- value Prob > F Rank of Significance Model 13197.52 41 321.89 2.03 0.039 model is significant A-Endries VMI 722.27 1 722.27 4.56 0.0442 7 B-Item Master SC 819.39 1 819.39 5.17 0.0331 6 C-Months Usage 415.14 1 415.14 2.62 0.1198   D-Annual Usage 34.52 1 34.52 0.22 0.6453   E-Lead Time 47.27 1 47.27 0.3 0.5905   F-Component Screw31.64131.640.20.6594 DE1732.6411732.6410.930.00321AC1198.8911198.897.560.01172CD1198.8911198.897.560.01172CE1164.5211164.527.350.01284AE848.271848.275.350.03045AD708.891708.894.470.0468Residual3486.5922158.48   Cor Total16684.1163     Std. Dev.12.59 R-Squared0.791Mean6.33 Adj R-Squared0.4016C.V. %198.94 Pred R-Squared-0.7685PRESS29506.38 Adeq Precision7.226

AnalyzeSolutionsDesirability at 0.949 if usage set at < 500.Desirability reduced to 0.7 if annual usage required to be > 500.

ImproveSolution: Develop Criterion for Each CategoryKanban System Philips Manufacturing Facility Vendor Distribution CenterInformation Replenish Bin(s)  

ImproveRACI Chart to Clarify Roles and Responsibilities Process Map for Source Code ConversionUsing Six Sigma Tools:Material Flow for Based on Source Code &

ControlDashboardsStock-Outs by Week, Stock-Outs by Source Code/CriteriaRead-Out of Components with Highest Impact and by Criteria% of Components Seen by Both PartiesDashboard to Track Stock-Outs & Performance

ControlMeasuring SystemStatistical Proof that Methods Implemented have dropped Stock-OutsWe Expect this Trend to Continue as Components are Addressed

CollaboratingWith A Special Thank you to: Chris Venicx – Plant Manager Wes Olive – Supply-Chain ManagerPsyche Bryant – Assembly/Manufacturing Mgr.Felipe Caldeira – Industrial Engineer Francisco Gutierrez – Senior Industrial Engineer Dr. Jesus Jimenez – Industrial Engineering Capstone Faculty Advisor Additional Thanks Dr. Tongdan Jin – Industrial Engineering Professor Dr. Clara Novoa – Industrial Engineering Professor Dr. Eduardo Perez – Industrial Engineering Professor Philips Members Texas State University Members