SOCIAL HOUSING REGULATORY AUTHORITY SOCIAL HOUSING REGULATORY AUTHORITY

SOCIAL HOUSING REGULATORY AUTHORITY - PowerPoint Presentation

pasty-toler
pasty-toler . @pasty-toler
Follow
359 views
Uploaded On 2019-03-14

SOCIAL HOUSING REGULATORY AUTHORITY - PPT Presentation

Presentation to the Human Settlements Parliamentary Portfolio Committee 18 April 2018 Table of Contents Mandate Values SHRAs Programmes Structure MTEF Allocation MTSF Target Units delivered ID: 756067

grant 000 social housing 000 grant housing social units plan shis accredited 2018 2017 approved performance bbee target delivered projects 2019 accreditation

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "SOCIAL HOUSING REGULATORY AUTHORITY" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

SOCIAL HOUSING REGULATORY AUTHORITY

Presentation

to the Human Settlements Parliamentary Portfolio Committee

18 April 2018Slide2

Table of Contents

MandateValuesSHRA’s Programmes

Structure

MTEF Allocation

MTSF Target – Units deliveredExpected delivery from current projectsSHRA’s Strategic PlanStrategic Outcome Oriented Goals and Strategic ObjectivesSHRA’s APP 2018/19Focus of the plansAPP 2018/19 Annual Performance Indicators and Targets:Administration ProgrammeCompliance, Accreditation and Regulations ProgrammeSector Development ProgrammeProject Development and Funding ProgrammeExpenditure Trends and Estimates

2Slide3

Mandate

3

Vision

A thought-leader, stimulator and regulator of world-class self-sufficient social housing solutions

The SHRA is responsible for regulating the social housing sector in South Africa and approval, administration and disbursement of both institutional investment (capacity building grant) and capital grants (named the Consolidated Capital Grant).

The SHRA must promote an enabling environment for the growth and development of the social housing sector.

Mission

Facilitate delivery of quality, sustainable social housing at scale to advance the needs of low and middle income groups in support of spatial, economic and social restructuringSlide4

Values

4Slide5

SHRA’s Programmes

No

Programme

Name

Responsibilities1Administration:Sub-Programme A: Corporate ServicesSub-Programme B: Office of the CEOSupport servicesResearch

Corporate Governance

Marketing and Communications

2

Compliance, Accreditation and Regulations

Accreditation of entitiesAccreditation of projects (approval of capital grants)Compliance monitoring and enforcement3Sector Development Award and management of capacity building grantsTransformation of the social housing sectorManagement of Institutional Investment grant4Project Development and FundingProject packagingManagement of construction projects to completion

Management of Consolidated Capital Grant5

Regulatory servicesGrant management and development of projects and sectorSlide6

Structure

6

No. of positions = 51

Current headcount = 39 Slide7

MTEF ALLOCATION

7

 

2017/18 Current

2018/19

2019/20

2020/21

R’000

R’000

R’000R’000

Consolidated Capital Grant851,658

743,640738,414778,527Operations46,81551,980

55,201

58,237

Regulations

8,000

10,000

10,560

11,141

Institutional Investment

20,490

20,132

21,259

22,428

TOTAL

926,963

825,752

825,434

870,333

Note the reduced allocation of Consolidated Capital Grant (1,143,640 (2018/19FY) and 1,238,414 (2019/20FY))Slide8

MTSF Target – Units Delivered

8

SHRA’s MTSF target is the delivery of 27,000 by 2019. The chart above depicts the number of units projected to have been delivered by the end of 2017/18, this figure is 12,852. Slide9

Expected delivery from current projects

Provinces

MTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)

Units approved for grant award but yet to be delivered

Of those approved for grant award how many currently under construction

Of those approved for grant award how many under planning or yet to deliver units

Total

Variance

Eastern Cape

1 960768

2 8221 5971 2253 5901 630

Free State

1 935

869

1 021

1 021

0

1 890

-45

Gauteng

9 905

4672

8 457

5 041

3 416

13 129

3 224

Kwa-Zulu Natal

3 085

2448

154

154

0

2 602

-483

Limpopo

1 050

00000-1 050Mpumalanga1 545104000104-1 441North West2 85011681 3778015762 545-305Northern Cape56500000-565Western Cape4 1081129175541613392 884-1 224Total Number of Units27 00311 15815 5869 0306 55626 744-259

9

11 158 + 9 030 = 20 188

20 188 is the maximum number of units that could be delivered by 2019 however more realistic figure is approximately 15 000Slide10

SHRA’s Strategic Plan

SHRA’s Strategic Plan 2015 – 2020 was approved by Parliament in 2017 and is valid until 2020The strategic goals and objectives remain unchanged in SHRA’s APP 2018/1910Slide11

Strategic Outcome Oriented Goals and Strategic Objectives

Strategic Outcome Oriented Goal

Strategic Objectives

1

To establish a well skilled, resourced and led organisation

To develop and implement a

Human Resource

plan that supports the implementation of the strategic plan

To implement

business processes and systems that enables and supports the implementation of the strategic plan2To support policy and sectoral leadership within the social housing sectorTo undertake research and on the basis of the findings make proposals to relevant stakeholders on policy amendmentsTo secure strategic partnerships with key stakeholders including

NDoHS, HDA, NHFC, Provinces and Municipalities and to ensure that the SHRA is represented on all key inter-governmental platforms and forums

11Slide12

Strategic Outcome Oriented Goals and Strategic Objectives

Strategic Outcome Oriented Goal

Strategic Objectives

3

To establish functioning and well managed delivery agents/entities delivering units that meet a landlords responsibilities to its tenants

To implement a customised and structured

capacitation

programme tailored to

SHIs

needs to improve absorption rates and tenant focused management systems4To effectively regulate the social housing sector through a risk based, automated systemTo develop and implement a risk based compliance monitoring system that triggers intervention timeously12Slide13

Strategic Outcome Oriented Goals and Strategic Objectives

Strategic Outcome Oriented Goal

Strategic Objectives

6

To deliver social housing units that result in the restructuring of cities and integrated communities

To proactively establish a pipeline of prioritised

projects

that meet a holistic set of well researched criteria

To develop and implement an

investment plan focused on achieving social, economic and spatial restructuring and community development that enables investment in social housing projects on the basis of well researched criteriaTo develop and implement a model that enables private sector involvement into social housing13Slide14

SHRA’s APP 2018/19

This plan has been derived from the Social Housing Investment Plan (SHIP), the Social Housing Sector Development Plan (SHSDP), alternatively referred to as the Institutional Investment Plan, and the Social Housing Regulatory Plan (

SHoRP

).

The Social Housing Act No. 16 of 2008 defines these plans as follows:i. "institutional investment plan" means a training and skills development planwhich is a component of the social housing investment plan intended to ensure thatsocial housing institutions acquire the expertise, skills and operational capacity tomanage such institutions on a sustainable basis and produce and manageapproved projects;ii. "social housing investment plan" means a corporate plan and budget asrequired by the Public Finance Management Act, comprising a capital investmentplan and an institutional investment plan for the capital institutional and investmentactivity of the Regulatory Authority for purposes of the social housing programme

;

and

iii.

"social housing regulatory plan" means a corporate plan and budget as required

under section 52 of Public Finance Management Act.14Slide15

Format of these individual plans

A regional approach to the implementation of the social housing programme

in accordance with the targets and needs of each Province and Municipality

Each plan contains a section for each Province

The Investment plan contains plans for each metropolitan and secondary city where demand for social housing is highest15Slide16

Eastern Cape

16

Provinces

MTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)

Units approved for grant award but yet to be delivered

Of those approved for grant award how many currently under construction

Of those approved for grant award how many under planning or yet to deliver units

Total

Variance

Eastern Cape

1 9607682 8221 5971 2253 590

1 630

9 accredited SHIs (3 fully accredited, 6 conditionally accredited)

PSC meeting regularly

Restructuring zones: Buffalo City (5)

Nelson Mandela Bay (19)

Camdeboo

LM

King

Sabata

Dalindyebo

LM

Kouga LM

5 catalytic projects

5 projects in the SHRA pipelineSlide17

Free State

17

2 accredited SHIs (1 fully accredited, 1 conditionally accredited cooperative)

PSC has commenced meeting but needs support

Restructuring zones: MangaungMatjhabengNeed to finalise more zones3 catalytic projects (not all in restructuring zones)0 projects in SHRA pipeline

Provinces

MTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)

Units approved for grant award but yet to be delivered

Of those approved for grant award how many currently under construction

Of those approved for grant award how many under planning or yet to deliver units

TotalVarianceFree State1 935869

1 021

1 021

0

1 890

-45Slide18

Gauteng

18

35 accredited SHIs (4 fully accredited, 31 conditionally accredited)

PSC has commenced meeting but needs support

Restructuring zones: City of JohannesburgCity of TshwaneEkurhuleniMogale CityMerafongRandfontein

Westonaria

15 catalytic projects (not all in restructuring zones)

Work on new restructuring zones e.g. Emfuleni

Purchase of inner city buildings - RFP

45 projects in SHRA pipelineProvincesMTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)Units approved for grant award but yet to be delivered

Of those approved for grant award how many currently under constructionOf those approved for grant award how many under planning or yet to deliver unitsTotalVarianceGauteng

9 905

4 672

8 457

5 041

3 416

13 129

3 224Slide19

KwaZulu-Natal

19

14 accredited SHIs (1 fully accredited, 13 conditionally accredited)

PSC functioning well and meeting regularly

Restructuring zones: eThekwini (12)EmnambithiKwaDukuzaMhlatuzeRay Nkonyeni8 catalytic projects (not all in restructuring zones)Work with new municipalities with RZs

Potential partnership arrangements for land release

2 projects in SHRA pipeline

Provinces

MTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)

Units approved for grant award but yet to be deliveredOf those approved for grant award how many currently under construction

Of those approved for grant award how many under planning or yet to deliver unitsTotalVarianceKwaZulu-Natal3 085

2448

154

154

0

2 602

-483Slide20

Limpopo

20

2 accredited SHIs both conditionally accredited

PSC has commenced meeting but needs support

Restructuring zones: PolokwaneTzaneenLephalale2 catalytic projects (not all in restructuring zones)Work with new municipalities with RZsWork with SHIs to package projects3 projects in SHRA pipeline

Provinces

MTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)

Units approved for grant award but yet to be delivered

Of those approved for grant award how many currently under construction

Of those approved for grant award how many under planning or yet to deliver units

TotalVarianceLimpopo1 0500

0

0

0

0

-1 050Slide21

Mpumalanga

21

6 accredited SHIs (1 fully accredited, 5 conditionally accredited)

PSC has commenced meeting but needs support

Restructuring zones: Govan MbekiEmalahleniSteve TshweteMbombelaUmjindiNkomaze

Thaba

Cheu

Msukaligwa

LekwaVictor KhanyeProvincesMTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)

Units approved for grant award but yet to be deliveredOf those approved for grant award how many currently under constructionOf those approved for grant award how many under planning or yet to deliver unitsTotalVarianceMpumalanga

1 545

104

0

0

0

104

-1 441

1 catalytic project (not in restructuring zone)

Work with new municipalities with RZs

Work with SHIs to package projects

4 projects in SHRA pipelineSlide22

North West

22

1 accredited SHI that is conditionally accredited

PSC has commenced meeting but needs support

Restructuring zones: RustenburgMadibeng5 catalytic projects (not in restructuring zones)Need to understand demand better in RZsWorkshops and assistance on new Restructuring Zones0 projects in SHRA pipeline

Provinces

MTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)

Units approved for grant award but yet to be delivered

Of those approved for grant award how many currently under construction

Of those approved for grant award how many under planning or yet to deliver units

TotalVarianceNorth West2 8501168

1 377

801

576

2 545

-305Slide23

Northern Cape

23

2 accredited SHIs both conditionally accredited

PSC is not meeting and needs support

Restructuring zones:Sol Plaatjie3 catalytic projects (not in restructuring zones)Workshops and assistance on Restructuring ZonesAssist SHIs with project packaging0 projects in SHRA pipeline

Provinces

MTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)

Units approved for grant award but yet to be delivered

Of those approved for grant award how many currently under construction

Of those approved for grant award how many under planning or yet to deliver units

TotalVarianceNorthern Cape5650

0

0

0

0

-565Slide24

Western Cape

24

11 accredited SHIs (3 fully accredited, 8 conditionally accredited)

PSC is functioning well, will release pipeline when projects ready for implementation

8 catalytic projectsPrecinct planning workCapacitation work1 project in SHRA pipeline

Provinces

MTSF Target units to be delivered (2014 - 2019)

Actual number of units delivered (2014 - Q3 2017/18)

Units approved for grant award but yet to be delivered

Of those approved for grant award how many currently under construction

Of those approved for grant award how many under planning or yet to deliver units

TotalVarianceWestern Cape4 10811291755

416

1339

2 884

-1 224

Restructuring zones:

City of Cape Town (10)

Oudshoorn

Mossel Bay

George

Knysna

Bitou

Drakenstein

Overstrand

Stellenbosch

Saldhana

bay

Breedevalley

SwartlandSlide25

Focus of the plans

Focus area

Actions taken to address the issue

Assistance to three Provinces struggling to achieve their delivery targets (North West, Northern Cape and Limpopo)

Specific plans have been developed to assist these three Provinces including:

Restructuring Zone workshops

Stakeholder training

Project facilitation

25Slide26

Focus of the plans

Focus area

Actions taken to address the issue

Capacitation and sharing best practice amongst social housing practitioners at a Provincial and Municipal level

Critical that there are well functioning Provincial Steering Committees in each Province. Therefore plans to enhance the NRHTT by creating two other forums:

Chairperson’s Forum

Peer Learning Forum

26Slide27

Focus of the plans

Focus area

Actions taken to address the issue

National training plan

27Slide28

Focus of the plans

Focus area

Actions taken to address the issue

Renewed focus on the inner city as part of an integrated model approach to renewing and transforming cities

An Implementation Protocol has been signed with the Housing Development Agency to source land and buildings for social housing with a focus on the inner city. Six inner city buildings have already been identified for immediate purchase.

Additional indicators and targets have been developed and included in this APP that focus specifically on inner city redevelopment e.g.

Number of units located in inner cities

pre-assessed

for grant funding

Number of units located in inner cities accredited (awarded grant funding)28Slide29

Focus of the plans

Focus area

Actions taken to address the issue

Transformation and empowerment of the social housing sector

Indicators and targets have been established i.e.

Percentage of

conditionally

accredited SHIs that are classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act. Target is 50% for 2018/19.

Percentage of

fully accredited SHIs that are classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act. Target is 50% for 2018/19Percentage of annual Consolidated Capital Grant allocation awarded to B-BBEE Owned/Controlled Companies as defined in the B-BBEE Act. Target is 60% for 2018/19

29Slide30

Focus of the plans

Focus areas

Actions taken to address the issue

The performance measurement of the SHRA to be reflective of what constitutes real traction on the ground

The SHRA has added a new indicator so that the SHRA now has units delivered and units completed. Units delivered means those completed ands tenanted and units completed means those having reached practical completion.

30Slide31

Situational Analysis

Focus area

Actions taken to address the issue

Acceleration of project delivery to meet MTSF target

The Social Housing Investment Plan provides a more regional approach to social housing delivery support that is aimed at accelerating project delivery. Internally, the SHRA has different personnel assigned to different Provinces to work closely with Provincial Steering Committees to directly assist with:

Designation of restructuring zones

Project facilitation

Managing the pipeline of projects

Working with PSCs

These personnel also work directly with projects within their respective Provinces and ensure project delivery.

31Slide32

Situational Analysis

Focus area

Actions taken to address the issue

There are a number of SHIs that are conditionally or fully accredited without projects / stock.

In order for an SHI to become fully accredited, it must have stock. SHRA has set a new target to increase the number of fully accredited SHIs.

32Slide33

Annual Performance Indicators and Targets – Administration Programme (Corporate Services)

33

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target1.1

Percentage adherence to the Strategic HR Plan's Action Plan. The Action Plan's format will include work to be undertaken, timeframes and responsibilities.

80% of 2017/18

HR Plan's Action

Plan

implemented bythe end of March2018100% of 2018/19HR Plan's ActionPlanimplemented bythe end of March2019100% of 2019/20HR Plan's Action

Planimplemented bythe end of March2020

100% of 2019/20HR Plan's ActionPlanimplemented bythe end of March20211.2Manage theimplementation ofa comprehensiveperformancemanagementsystemPerformance

management

process including

performance

targets and

standards for all

positions

implemented

Performance

management

process including

performance

targets and

standards for all

positions

implemented

Performance

management

process includingperformancetargets andstandards for allpositionsimplementedPerformancemanagementprocess includingperformancetargets andstandards for allpositionsimplementedSlide34

Annual Performance Indicators and Targets – Administration Programme (Corporate Services)

34

Indicator

2017/18 estimated performance

2018/19 Target2019/2020 Target2020/21 Target

2.1

Obtain an

unqualified audit

opinion on the

audit report fromthe ExternalAuditorsUnqualified auditopinion obtainedon the auditreport from theExternal Auditorsfor the 2016/17financial yearUnqualified auditopinion obtainedon the auditreport from theExternal Auditorsfor the 2017/18financial yearUnqualified audit

opinion obtainedon the auditreport from theExternal Auditorsfor the 2018/19financial year

Unqualified auditopinion obtainedon the auditreport from theExternal Auditorsfor the 2019/20financial year2.2Percentage ofInformationManagementAction Planimplemented80% of 2017/18InformationManagementAction Planimplemented by

the end of March

2018

Information

Management

Policy reviewed

by Council

100% of 2018/19

Information

Management

Action Plan

implemented by

the end of March

2019

100% of 2019/20

Information

Management

Action Plan

implemented bythe end of March2020100% of 2020/21InformationManagementAction Planimplemented bythe end of March2021Slide35

Annual Performance Indicators and Targets – Administration Programme (Corporate Services)

35

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

2.3

Percentage of Information Communication Technology Action Plan implemented

80% of 2017/18 Information Communication Technology Action Plan implemented by end of March 2018

100% of 2018/19 Information Communication Technology Action Plan action plan implemented by March 2019

100% of 2019/20 Information Communication Technology Action Plan action plan implemented by March 2020100% of 2020/21 Information Communication Technology Action Plan action plan implemented by March 2021Slide36

Annual Performance Indicators and Targets – Administration Programme (Office of the CEO)

36

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

3.1

Annual development of the State of the Sector report which includes a research plan for the following year.

State of the Sector report, including a research plan for the following financial year, tabled at EXCO by the end of March 2018

1 State of the Sector report, including a research plan for the following financial year, tabled at EXCO by the end of March 2019

1 State of the Sector report, including a research plan for the following financial year, tabled at EXCO by the end of March 20201 State of the Sector report, including a research plan for the following financial year, tabled at EXCO by the end of March 2021

3.2Percentage completion of annual research plan

80% completion of the annual research plan achieved by the end of March 2018100% completion of the annual research plan achieved by the end of March 2019100% completion of the annual research plan achieved by the end of March 2020100% completion of the annual research plan achieved by the end of March 2021Slide37

Annual Performance Indicators and Targets – Administration Programme (Office of the CEO)

37

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

3.3

Development of social housing norms and standards

Appointment of service provider

Social housing norms and standards approved by SHRA's Council

Implementation of social housing norms and standardsImplementation of social housing norms and standardsSlide38

Annual Performance Indicators and Targets – Administration Programme (Office of the CEO)

38

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

4.1

Development and approval by Council of an annual Stakeholder Management Matrix that identifies SHRA's stakeholders and planned engagements

Stakeholder Management Matrix for 2017/18 financial year approved by Council by the end of June 2017

Stakeholder Management Matrix for 2018/19 financial year approved by Council by the end of July 2018

Stakeholder Management Matrix for 2019/20 financial year approved by Council by the end of July 2019Stakeholder Management Matrix for 2019/20 financial year approved by Council by the end of July 2020

4.2Percentage of planned engagements held as identified on the SHRA's Stakeholder Management Matrix

70% achievement against the Stakeholder Management Matrix by the end of March 2018100% achievement against the Stakeholder Management Matrix by the end of March 2019100% achievement against the Stakeholder Management Matrix by the end of March 2020100% achievement against the Stakeholder Management Matrix by the end of March 2021Slide39

Annual Performance Indicators and Targets – Compliance, Accreditation and Regulations Programme

39

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

5.1

Annual development and submission of the Social Housing Regulatory Plan (SHORP) as per the Social Housing Act

Social Housing Regulatory Plan for 2018/19 developed and submitted in accordance with the Social Housing Act by the end of March 2018

Social Housing Regulatory Plan for 2019/20 developed and submitted in accordance with the Social Housing Act by the end of March 2019

Social Housing Regulatory Plan for 2020/21 developed and submitted in accordance with the Social Housing Act by the end of March 2020Social Housing Regulatory Plan for 2020/21 developed and submitted in accordance with the Social Housing Act by the end of March 2021

5.2Number of units under regulation

30832 units under regulation34688 units under regulation38288 units under regulation42288 units under regulationSlide40

Annual Performance Indicators and Targets – Compliance, Accreditation and Regulations Programme

40

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

5.3

Percentage of accreditation applications received and processed (received an outcome letter from the SHRA) within a maximum of 90 days

100% of accreditation applications received and processed (received an outcome letter from the SHRA) within a maximum of 90 days

100% of accreditation applications received and processed (received an outcome letter from the SHRA) within a maximum of 90 days

100% of accreditation applications received and processed (received an outcome letter from the SHRA) within a maximum of 90 days100% of accreditation applications received and processed (received an outcome letter from the SHRA) within a maximum of 90 daysSlide41

Annual Performance Indicators and Targets – Compliance, Accreditation and Regulations Programme

41

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

5.4

Percentage of completed (completed means that all required data fields have been filled in) quarterly reports (quarterly reporting tool template used) submitted by conditionally and fully accredited SHIs with stock to the SHRA

90% of conditionally and fully accredited SHIs with stock submitted completed quarterly reports to the SHRA

95% of conditionally and fully accredited SHIs with stock submitted completed quarterly reports to the SHRA

95% of conditionally and fully accredited SHIs with stock submitted completed quarterly reports to the SHRA95% of conditionally and fully accredited SHIs with stock submitted completed quarterly reports to the SHRASlide42

Annual Performance Indicators and Targets – Compliance, Accreditation and Regulations Programme

42

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

5.5

Average number of days from the tabling of the monthly Compliance Report at EXCO that an intervention action plan for non-compliant SHIs (limited to SHIs with stock, SHIs with a project on the pipeline and SHIs project on the pipeline and SHIs classified as B-BBEE Owned/Controlled Companies as defined in the B-BBEE Act) is subsequently tabled at EXCO.

Average of 60 days to table an intervention action plan at EXCO for non-compliant SHIs (limited to SHIs with stock, SHIs with a project on the pipeline and SHIs project on the pipeline and SHIs classified as B-BBEE Owned/Controlled Companies as defined in the B-BBEE Act) from the date of tabling the monthly Compliance Report at EXCO that identified the non-compliance of the same SHI

Average of 60 days to table an intervention action plan at EXCO for non-compliant SHIs (limited to SHIs with stock, SHIs with a project on the pipeline and SHIs project on the pipeline and SHIs classified as B-BBEE Owned/Controlled Companies as defined in the B-BBEE Act) from the date of tabling the monthly Compliance Report at EXCO that identified the non-compliance of the same SHI

Average of 60 days to table an intervention action plan at EXCO for non-compliant SHIs (limited to SHIs with stock, SHIs with a project on the pipeline and SHIs project on the pipeline and SHIs classified as B-BBEE Owned/Controlled Companies as defined in the B-BBEE Act) from the date of tabling the monthly Compliance Report at EXCO that identified the non-compliance of the same SHI

Average of 60 days to table an intervention action plan at EXCO for non-compliant SHIs (limited to SHIs with stock, SHIs with a project on the pipeline and SHIs project on the pipeline and SHIs classified as B-BBEE Owned/Controlled Companies as defined in the B-BBEE Act) from the date of tabling the monthly Compliance Report at EXCO that identified the non-compliance of the same SHISlide43

Annual Performance Indicators and Targets – Compliance, Accreditation and Regulations Programme

43

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target

2020/21 Target

5.6

Percentage of conditionally accredited SHIs that are classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act

30% of the conditionally accredited SHIs classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act

50% of the conditionally accredited SHIs classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act55% of the conditionally accredited SHIs classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act

60% of the conditionally accredited SHIs classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act5.7

Percentage of fully accredited SHIs that are classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act30% of the fully accredited SHIs classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act50% of the fully accredited SHIs classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act55% of the fully accredited SHIs classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE Act

60% of the fully accredited SHIs classified as B-BBEE Owned / Controlled companies as defined in the B-BBEE ActSlide44

Annual Performance Indicators and Targets – Compliance, Accreditation and Regulations Programme

44

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target

2020/21 Target

5.8

Number of social housing units accredited (approved for capital grant funding)

12000 social housing units approved for capital grant funding

9000 social housing units accredited (approved for capital grant funding)6106 social housing units accredited (approved for capital grant funding)

6310 social housing units accredited (approved for capital grant funding)5.9

Number of social housing units located in an inner city accredited (approved for capital grant funding)New indicator1000 social housing units located in an inner city accredited (approved for capital grant funding)2000 social housing units located in an inner city accredited (approved for capital grant funding)

2500 social housing units located in an inner city accredited (approved for capital grant funding)Slide45

Annual Performance Indicators and Targets – Compliance, Accreditation and Regulations Programme

45

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target

2020/21 Target

5.10

Number of fully accredited Social Housing Institutions

13 fully accredited Social Housing Institutions

15 fully accredited Social Housing Institutions17 fully accredited Social Housing Institutions19 fully accredited Social Housing Institutions

5.11

Regulation of stock funded through the Community Residential Unit programmeNew indicatorManagement arrangements concluded for 4 CRU projects with an accredited SHI or ODAManagement arrangements concluded for 4 CRU projects with an accredited SHI or ODAManagement arrangements concluded for 4 CRU projects with an accredited SHI or ODA

5.12

Regulation of stock funded through the Institutional Subsidy

programme

New indicator

Management arrangements concluded for 4 Institutional Subsidy projects with an accredited SHI or ODA

Management arrangements concluded for 4 Institutional Subsidy projects with an accredited SHI or ODA

Management arrangements concluded for 4 Institutional Subsidy projects with an accredited SHI or ODASlide46

Annual Performance Indicators and Targets – Sector Development Programme

46

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

6.1

Annual development and

submission

of the Social Housing Sector Development Plan which is considered as the Institutional Investment Plan, (SHSDP) as per the Social Housing Act

Social Housing Sector Development Plan for 2018/19 developed and submitted in accordance with the Social Housing Act by the end of March 2018Social Housing Sector Development Plan for 2019/20 developed and submitted in accordance with the Social Housing Act by the end of March 2019Social Housing Sector Development Plan for 2020/21 developed and submitted in accordance with the Social Housing Act by the end of March 2020

Social Housing Sector Development Plan for 2020/21 developed and submitted in accordance with the Social Housing Act by the end of March 2021Slide47

Annual Performance Indicators and Targets – Sector Development Programme

47

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

6.2

Percentage of the Social Housing Institutions that are identified by the Compliance, Accreditation and Regulations Programme, and approved by EXCO and the SHI, to be assisted through the award of an Institutional Investment Grant for a specific Intervention that upon completion of the work either maintains or improves their level of accreditation

75% of SHIs who received an Institutional Investment Grant, of which the work is completed within the 2017/18 financial year, either maintained their level of accreditation or improved their level of accreditation from the date of grant approval at EXCO unless the SHIs lose their accreditation status or their accreditation status drops since the date of grant approval

80% of SHIs who received an Institutional Investment Grant, of which the work is completed within the 2018/19 financial year, either maintained their level of accreditation or improved their level of accreditation from the date of grant approval at EXCO unless the SHIs lose their accreditation status or their accreditation status drops since the date of grant approval

80% of SHIs who received an Institutional Investment Grant, of which the work is completed within the 2019/20 financial year, either maintained their level of accreditation or improved their level of accreditation from the date of grant approval at EXCO unless the SHIs lose their accreditation status or their accreditation status drops since the date of grant approval

80% of SHIs who received an Institutional Investment Grant, of which the work is completed within the 2020/21 financial year, either maintained their level of accreditation or improved their level of accreditation from the date of grant approval at EXCO unless the SHIs lose their accreditation status or their accreditation status drops since the date of grant approvalSlide48

Annual Performance Indicators and Targets – Sector Development Programme

48

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

6.3

Percentage of projects identified by the Project Development and Funding Programme, and approved by EXCO and agreed to by the SHI or ODA, that are assisted through the award of an Institutional Investment Grant for a specific Intervention and upon completion of the work are later recommended to the TEC for capital grant award

75% of the projects that received an Institutional Investment Grant, of which the work is completed within the 2017/18 financial year, are recommended to the TEC for capital grant award

75% of the projects that received an Institutional Investment Grant, of which the work is completed within the 2018/19 financial year, are recommended to the TEC for capital grant award

75% of the projects that received an Institutional Investment Grant, of which the work is completed within the 2019/20 financial year, are recommended to the TEC for capital grant award

75% of the projects that received an Institutional Investment Grant, of which the work is completed within the 2020/21 financial year, are recommended to the TEC for capital grant award6.4

Percentage expenditure of Institutional Investment grant within the financial year in which it has been allocatedAt least 95% expenditure of Institutional Investment grant within the 2017/18 financial yearAt least 95% expenditure of Institutional Investment grant within the 2018/19 financial yearAt least 95% expenditure of Institutional Investment grant within the 2019/20 financial year

At least 95% expenditure of Institutional Investment grant within the 2020/21 financial yearSlide49

Annual Performance Indicators and Targets – Project Development and Funding Programme

49

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

7.1

Number of social housing units delivered (tenanted)

4500 social housing units delivered (tenanted)

3856 social housing units delivered (tenanted)

3600 social housing units delivered (tenanted)4000 social housing units delivered (tenanted)

7.2Number of units completed (reached practical completion)

6000 social housing units completed (reached practical completion)4820 social housing units completed (reached practical completion)4500 social housing units completed (reached practical completion)5000 social housing units completed (reached practical completion)7.3

Number of units pre-assessed and recommended by the Project Development and Funding Programme for Project Accreditation to the Compliance, Accreditation and Regulation Programme

New indicator

6270 units

6106 units

6310 unitsSlide50

Annual Performance Indicators and Targets – Project Development and Funding Programme

50

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

7.4

Number of units, located in inner cities, pre-assessed and recommended by the Project Development and Funding Programme for Project Accreditation to the Compliance, Accreditation and Regulation Programme

New indicator

3135 units

3053 units3155 units

7.5Percentage expenditure of Consolidated Capital Grant allocation for the financial year

At least 95% expenditure of 2017/18 Consolidated Capital Grant allocationAt least 95% expenditure of 2018/19 Consolidated Capital Grant allocationAt least 95% expenditure of 2019/20 Consolidated Capital Grant allocation Slide51

Annual Performance Indicators and Targets – Project Development and Funding Programme

51

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

8.1

Annual development and submission of the Social Housing Investment Plan as per the Social Housing Act

Social Housing Investment Plan for 2018/19 developed and submitted in accordance with the Social Housing Act by the end of March 2018

Social Housing Investment Plan for 2019/20 developed and submitted in accordance with the Social Housing Act by the end of March 2019

Social Housing Investment Plan for 2020/21 developed and submitted in accordance with the Social Housing Act by the end of March 20209.1

Percentage of annual Consolidated Capital Grant allocation awarded to Other Delivery Agents15% of Consolidated Capital Grant allocation for 2017/18 financial year awarded to Other Delivery Agencies within the 2017/18 financial year

20% of Consolidated Capital Grant allocation for 2018/19 financial year awarded to Other Delivery Agencies within the 2018/19 financial year20% of Consolidated Capital Grant allocation for 2019/20 financial year awarded to Other Delivery Agencies within the 2019/20 financial yearSlide52

Annual Performance Indicators and Targets – Project Development and Funding Programme

52

Indicator

2017/18 estimated performance

2018/19 Target2019/20 Target2020/21 Target

9.2

Percentage of annual Consolidated Capital Grant allocation awarded to B-BBEE Owned/Controlled Companies as defined in the B-BBEE Act

50% of Consolidated Capital Grant allocation for 2017/18 financial year awarded to B-BBEE Owned/Controlled Companies, as defined in the B-BBEE Act, within the 2017/18 financial year

60% of Consolidated Capital Grant allocation for 2018/19 financial year awarded to B-BBEE Owned/Controlled Companies, as defined in the B-BBEE Act, within the 2018/19 financial year

60% of Consolidated Capital Grant allocation for 2019/20 financial year awarded to B-BBEE Owned/Controlled Companies, as defined in the B-BBEE Act, within the 2019/20 financial yearSlide53

Expenditure Trends and Estimates

53

FY 2015/16

FY 2016/17

FY2017/18

FY2018/19

FY2019/20

FY2020/21

Expenditure Estimates

AuditedAudited

Budget Estimate

Budget EstimateBudget EstimateBudget Estimate 

 

REVENUE

 

 

Operational Grant

38 597 000

33 960 000

46 815 000

51 980 000

55 201 000

58 237 000

Consolidated Capital Grant

197 507 000

321 137 000

851 658 000

743 640 000

738 414 000

778 527 000

Institutional Investment Grant

-

15 756 000

20 490 000

20 132 000

21 259 000

22 428 000

Regulations

2 514 000 6 000 000 8 000 000 10 000 000 10 560 000 11 141 000 Total 238 618 000 376 853 000 926 963 000 825 752 000 825 434 000 870 333 000 Slide54

Expenditure Trends and Estimates cont.

54

FY 2015/16

FY 2016/17

FY2017/18

FY2018/19

FY2019/20

FY2020/21

Expenditure Estimates

Audited

AuditedBudget Estimate

Budget EstimateBudget EstimateBudget EstimateEXPENDITURE

 

 

Compensation of employees

17 355 000

21 342 000

27 085 000

34 733 034

36 816 971

39 026 037

 

 

Goods and services:

23 756 000

21 448 000

33 764 000

32 978 966

37 165 000

38 651 000

Agency and support / outsourced services

2 691 000

1 561 000

3 778 000

435 300

550 000

605 000

Communication

900 000 224 000 1 006 000 320 000 420 000 550 000 Computer services 238 000 753 000 828 000 520 000 915 000 962 000 Consultants 1 493 000 5 938 000 3 742 000 7 965 000 4 667 000 5 023 000 Contractors 470 000 130 000 914 000 60 000 80 000 100 000 Lease payments 2 166 000 2 511 000 2 762 000 3 550 000 3 905 000 4 295 500 Research and development - - 3 500 000 4 000 000 2 000 000 1 800 000 Training and staff development

313 000

375 000

1 550 000

282 000

350 000

450 000

Travel and subsistence

2 650 000

1 879 000

3 209 000

2 279 000

3 663 000

3 863 000

Other

12 828 000

7 997 000

12 387 000

13 567 666

18 303 029

16 271 463

 

 

Transfers and subsidies

197 507 000

334 063 000

866 114 000

758 040 000

753 914 000

797 327 000

Private enterprises

197 507 000

334 063 000

866 114 000

758 040 000

753 914 000

797 327 000

 

 

Total Expenditure

238 618 000

376 853 000

926 963 000

825 752 000

825 434 000

870 333 000 Slide55

55

THANK-YOU