/
ULTRASONIC TESTING OF RAIL ULTRASONIC TESTING OF RAIL

ULTRASONIC TESTING OF RAIL - PowerPoint Presentation

phoebe-click
phoebe-click . @phoebe-click
Follow
379 views
Uploaded On 2018-10-28

ULTRASONIC TESTING OF RAIL - PPT Presentation

SANJEEV KUMAR RATHORE SSEPWAYUSFDDHG Divahmedabad WESTERN RAILWAY 18092017 PRESENTED BY SANJEEV RATHORE SSEPWAYUSFDDHG 1 AREA CVERED BY70PROBE 18092017 PRESENTED BY SANJEEV RATHORE SSEPWAYUSFDDHG ID: 699852

pway usfd sanjeev rail usfd pway rail sanjeev rathore probe

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "ULTRASONIC TESTING OF RAIL" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

ULTRASONIC TESTING OF RAIL

SANJEEV KUMAR RATHORE

S.S.E/(PWAY)/USFD/DHG

Div:ahmedabad

WESTERN RAILWAY

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

1Slide2

AREA CVERED BY70°PROBE

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

2Slide3

SRT&DRT

ON INDIAN RAILWAY ,FLAW DTECTION BY ULTRASONICS IS CARRIED OUT WITH THE HELP OF TWO DIFFERENT TYPES OF EQUIPMENTS VIZ

SINGLE RAIL TESTER AND DOUBLE RAIL TESTER, SRT IS UTILISED ON INDIAN RAILWAY FOR

40 YEARS & DRT IS RECENT ORIGIN

TEN YEARS BACK. IN ADDDITIONAL HAND TESTERS OF SOME DESIGNS ARE ALSO BEING USEDPROCUREMENT OF USFD EQUIPMENTS SHOULD BE DONE ONLY FROM THE RDSO APPROVED SOURCES18/09/2017PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG3Slide4

SINGLE RAIL TESTER

SINGLE RAIL TESTER IS CAPABLE OF TESTING ONLY ONE OF THE RAILS AT A T IME AND IS PROVIDED WITH SEVEN PROBE

O°,70°CENTRAL FORWARD(CF),70°CENTRAL BACKWARD(CB),

70 °GAUGE FACE FORWARD (GF),70°GAUGE FACE BACKWARD(GB) 70°NONGAUGE FACE FORWARD(NGF), AND 70°NON-GAUGE FACE BACKWARD(NGB

)THE NORMAL PROBE IS DETECTING HORIZONTAL DEFECTS IN THE RAIL HEAD,WEB AND FOOT70°PROBE IS FOR DETECTING TRANSVERSE DEFECT IN HEADTHE SIGNAL RECEIVED FROM THE DEFECTS BY ANY OF THE ABOVE PROBE IS INDICATED ON THE SCREEN,IN ORDER TO FIND OUT THE ORIGIN OF DETECTION18/09/2017PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

4Slide5

DOUBLE RAIL TESTER

THE DOUBLE RAIL TESTER IS CAPABLE OF TESTING BOTH RAILS AT A TIME. FOR EACH RAIL, SEVEN PROBES HAVE BEEN PROVIDED

0°;70°CENTRAL FORWARD(CF) ,70°CENTRAL BACKWARD(CB),

70 °GAUGE FACE FORWARD (GF), 70°GAUGE FACE BACKWARD(GB) 70°NONGAUGE FACE FORWARD(NGF), AND 70°NON-GAUGE FACE BACKWARD(NGB

)THE NORMAL PROBE IS DETECTING HORIZONTAL DEFECTS IN THE RAIL HEAD,WEB AND FOOT70°PROBE IS FOR DETECTING TRANSVERSE DEFECT IN HEADTHE SIGNAL RECEIVED FROM THE DEFECTS BY ANY OF THE ABOVE PROBE IS INDICATED ON THE SCREEN,IN ORDER TO FIND OUT THE ORIGIN OF DETECTION

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

5Slide6

DETAILS OF FREQUENCY &PROBES

TYPE

FREQUENCY

PROBE

RIGSRTDRTNORMAL 4MHZONEONE FOR EACH RAIL70 CENTRAL2MHZTWO(F+B)TWO(F+B) FOR EACH RAIL70GAUGEFACE2MHZ

TWO(F+B)TWO(F+B) FOR EACH RAIL

70 NONFAUG FACE2MHZ

TWO(F+B)TWO(F+B) FOR EACH RAIL

RIG

2MHZ

TWO

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

6Slide7

CALIBRATION&SENSITIVITY SETTING

70°CENTRAL PROBE(F&B)

PROBE DIA=20X20FREQUENCY=2MHZ

MODE=T+R

RANGE=165CALIBRATION=ON IIW BLOCK IST PEAK=6.06CALIBRATION CHECKING=ON IIW BLOCK 25M.M. CURVE ,READ DEPTH= 25M.M.SENSITIVITY=ON SENSITIVITY BLOCK 12 M.M. DIA HOLEF.S.H.=60% HEIGHTREMARK=ADD 10DB GAIN ON SINGLE LINE& D- MARKED RAIL ON DOUBLE/MULTIPLE LINE18/09/2017PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG7Slide8

CLASSIFICATION OF RAIL DEFECT

(70°-CENTRAL) -1

IN TUNNEL &APP., ON MAJOR BRIDGES,APPROACHES(100MM) IN THE VICINITY OF HOLES NEAR THE WELDX..H>

30% V

> 20% =IMR 30%≤H≤100%V<20% =OOTHER THAN LOCATIONH> 50%,V> 60%=IMR H> 50%,60%>V> 20%=OBS 50%>H> 30%,V> 20%=OBS30%≤H≤100%, V<20% =O

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

8Slide9

CLASSIFFICATION OF RAIL DEFECTS(70°-CENTRAL)

S/L-D MARKED-RAILS(10DB)-2

VUL. LOCATION0%≤H≤100%,20%≤V≤100%=IMR

OTHER LOCATION50%≤H≤100%,20%≤V≤100%=IMR

0%≤H<50%,20%≤V≤100%=OBS18/09/2017PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG9Slide10

WELD DEFECTS(AT+FB)

PROBE USED

NATURE OF DEFECT

CLASSIFICATION

70°CENTRAL PROBE

ANY TRANSVERSE DEFECT IN THE RAIL HEAD AT THE FOLLOWING LOCATION

1.IN TUNNEL &APP (100M)

2.ON BRIDGE APPROACHES(100MM)

3. IN THE VICINITY OF HOLES NEAR THE WELD (50MM FOR OLD WELD AND 75MM FOR NEW AT WELDFROM THE CENTRE OF WELD ON EITHER SIDE

H ≥30%,V≥30%

=IMRW

ANY TRANSEVERSE DEFECT

IN

THE

RAIL AT TRACK LOCATION OTHER THAN (A)

H≥50%,V≥50%

=IMRW

H≥50%,60%>V≥20%

=OBSW

50%>H≥30%,V≥30%

=OBSW

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

10Slide11

70° GFC&NGC(F&B)

PROBE DIA=20X20

FREQUENCY=2MHZ

MODE=T+R

VELOCITY=3230M/SRANGE=165CALIBRATION=ON IIW BLOCK IST PEAK=6.06CALIBRATION CHECKING=ON IIW BLOCK 25M.M. CURVE SHOW DEPTH=25M.M.SENSITIVITY=ON SENSITIVITY BLOCK ,SET 5MM DIA HOLEFSH=60% FULL SCEEN HEIGHT18/09/2017PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG11Slide12

CLASSIFICATION OF RAIL DEFECTS

70°GF/NGF

IN TUNNEL&APP.,ON MAJOR BRIDGE&APPROACHES(100MM) VICINITY OF HOLESNEAR THE WELD H

> 15%,V>

20%=IMRH> 15%,V<20%=OOTHER LOCATIONH≥30%,V≥60%=IMRH≥30%,60%>V≥20%=OBS30%>H≥15%,V≥20%=OBSH≥15%,V<20%=O18/09/2017PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG12Slide13

WELD DEFECTS(AT+FB

)

PROBE USED

NATURE OF DEFECTCLASSIFICATION

70°GF/NGF

PROBE

ANY TRANSVERSE DEFECT IN THE RAIL HEAD ON GF/NGF AT THE FOLLOWING LOCATION

1.IN TUNNEL &APP (100M)

2.ON BRIDGE APPROACHES(100MM)

3. IN THE VICINITY OF HOLES NEAR THE WELD (50MM FOR OLD WELD AND 75MM FOR NEW AT WELDFROM THE CENTRE OF WELD ON EITHER SIDE

H ≥15%,V≥20%

=IMRW

ANY TRANSEVERSE DEFECT

IN

THE

RAILHEADONGF/NGF SIDE AT TRACK LOCATION OTHER THAN (A)

H≥30%,V≥60%

=IMRW

H≥30%,20%≤V<60%

=OBSW

15%≤H≥30%,V≥20%

=OBSW

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

13Slide14

SENSITIVITY SETTING BLOCK

TOP-VIEW

18/09/2017PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

14Slide15

SENSITIVITY SETTING BLOCK

SIDE VIEW

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

15Slide16

SENSITIVITY SETTING BLOCK

(END VIEV)

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

16Slide17

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

ACTION TO BE TAKEN AFTER DETECTION OF DEFECTS

CLASSIFICATIONPAINTING ON BOTH FACES OF WEB

ACTION TO BE TAKEN

INTERIM ACTION

IMR/IMRW

THREE CROSS WITH RED PAINT

THE DEFECTIVE PORTION SHOULD BE REPLACED

BY A SOUND TESTED RAIL PIECE OF NOT LESS THAN 5.5M LENGTH

( IN CASE OF FISH PLATED TRACK)&

4M LENGTH ( IN CASE OF

WELDED TRACK) WITHIN 3DAYS OF DETECTION

SSE/JE/USFD SHALL IMPOSE SPEED

RESTRICTINOF 30KMPH IMMEDIATEL

Y T AND TO BE CONTINUED TILL FLAWEDRAIL/WELD IS REPLACED. HE SHOULD COMMUNICATE TO SECTIONAL JE/PWAY ABOUT THE FLAW LOCATION WHO SHALL ENSURE THAT CLAMPED JOGGLED FISHPLATEIS

PROVIDEDWIHIN 24HRS

OBS/OBSW

ONE CROSS WITH RED PAINT

RAIL/ WELD TO BE PROVIDED WITH CLAMPED JOGGLED FISHPLATE

WIHIN 3 DAYS

.SSEE/JE/PWAY/USFD TO SPECIALLY RECORD THE OBSERVATION OF THE LOCATION IN HIS REGISTER & CHECK IN NEXT TESTING ROUND

SSE/JE/PWAY/ USFD TO ADVICE SECTIONAL JE/PWAY FOR PROVIDING JOGGLED FISHPLATE

WITHIN 24HRS

.

KEYMAN WATCH DURING DAILY THAT LOCATION TILL IT IS JOGGLED

17Slide18

FREQUENCY OF TESTING

(ALL MAIN LINE B.G.&M.G.)

ROUTE

ROUTE HAVING GMT

TESTING FREQUENCY(ONCE IN)ALL MG ROUTE<2.55YEARS2.5-5.03YEARS>52YEARSALL BG ROUTE ROUTES (Rail Head Centre And Gauge Face Corner Testing≤52YEARS>5≤812 MONTH

>8≤129MONTH

>12≤16

6MONTH

>16≤24

4MONTH

>24≤40

3MONTH

>40≤60

2MONTH

>60≤80

1

-1/2MONTH

>80

1MONTH

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

18Slide19

TH.&GFC TESTING OF RAIL

(

SOME IMPORTANT FACTS)1.VISUAL INSPECTION OF EQUIPMENT AND ACCESSORIES-DAILY CHECK

2.CALIBRATION OF EQUIPMENT= ONCE A WEEK

3.SENSITIVITY SETTING OF THE EQUIPMENT AND PROBE= ONCE EVERY 3DAYS(CS-3) 4.CHECKING OF EQUIPMENT CHARACTERISTICS=MONTHLY CHECK5.TESTING ON SINGLE LINE SECTION AND “D” MARKED RAILS ON DOUBLE /MULTIPLE LINE SECTION. ADITIONAL 10DB GAIN IN 70° CENTRAL PROBE IS TO BE EMPLOYED.6.. ADITIONAL OF 10DB GAIN IS NOT TO BE EMPLOED FOR CLASSIFICATION OF DEFECT IN WELD HEAD.7.DEFECT AT ANY LOCATION WHICH IS DETECTED BY TWO OR MORE PROBE AND ARE CONSIDERED TO BE CLASSIFIED AS OBS/OBSW BASE ON PEAK PATTERN OF INDIVVSUAL PROBE SHOULD BE CLASSIFIED IMR /IMRW-CS-318/09/2017PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG19Slide20

TH.&GFC TESTING OF RAIL

(SOME IMPORTANT FACTS

)7. IN CASE OF TWO OR MORE OBS/OBSW DEFECT ARE LOCATED WITHIN A DISTANCE OF 4.0 MTRE FROM EACH OTHER . SUCH OBS/OBSW DEFECTS SHALL BE CLASSIFIED AS

IMR/IMRW-CS-3 8.SENSITIVITY SETTING BLOCK SHOULD BE LENGTH OF 1.5 MTRE-CS-3

9..ANY SWEEPING SIGNAL ON HORIZONTAL BASE LINE THAT DOES NOT EXTEND BEYOND2.5 DIVISION FROM THE LEFT EDGE OF THE SCREEN SHALL BE RECORDED AS GAUGE CORNER CRACKING (GCC) AND NOT OBSCODE DESCRIPTION211 TRANVERSE FLAW IN HEAD411 TRANSVERSE CRACK IN FLUSH BUTT JOINT412 HORIZONTAL CRACK IN FLUSH BUTT JOINT421 TRANSVERSE CRACK IN I AT WELD422 HORIZONTAL CRACK IN AT WELD18/09/2017PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG20Slide21

CALIBRATION BLOCK

IIW(VI)

18/09/2017

PRESENTED BY SANJEEV RATHORE S.S.E.(PWAY)/USFD/DHG

21