/
Gammon Subsidiary lights up Pallekele International Cricket Stadium at Gammon Subsidiary lights up Pallekele International Cricket Stadium at

Gammon Subsidiary lights up Pallekele International Cricket Stadium at - PDF document

tatiana-dople
tatiana-dople . @tatiana-dople
Follow
369 views
Uploaded On 2016-04-18

Gammon Subsidiary lights up Pallekele International Cricket Stadium at - PPT Presentation

e by consultants of State Engineering Corporation of Sri Lanka Tata Projects Limited conducted the predespatch third party inspections The mast is designed for 110 nosof Siteco R2 Maxi Sports L ID: 283145

consultants State

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "Gammon Subsidiary lights up Pallekele In..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Gammon Subsidiary lights up Pallekele International Cricket Stadium at Sri Lanka Transrail Lighting Limited, a Gammon Group Company was awarded the Design, Manufacture, Supply and Commissioning of the Stadium Masts contract to light up the Pallekele International Cricket Stadium,Sri Lanka, host to 2011 ICC World Cup Matches (Sri Lanka-Zimbabwe on Mar. 10, and Pakistan-Zimbabwe on March 14), by prime lighting contractor M/S DiMo Engineering PLC, Srilanka (the sole Osram GmbH Associate in Sri Lanka). Stringent International manufacturing, quality, design parameters and standards have been rigorously adhered to. Design approvals wer e by consultants of State Engineering Corporation of Sri Lanka. Tata Projects Limited conducted the pre-despatch third party inspections. The mast is designed for +110 nos,of Siteco R2 Maxi Sports Luminaire. Four of these massive + 55m structures were designed, manufactured and supplied within a short period of 65 days. For further details, please contact Mr. Kailash K Agarwal CEO, Transrail Lighting Limited. Mobile: 9004054554