BES FACILITY TOWN HALL MEETING GENERAL INFORMATION

Published  . 0 views
↓ Download
BES FACILITY TOWN HALL MEETING GENERAL INFORMATION
1 / 1
BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 1 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 2 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 3 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 4 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 5 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 6 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 7 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 8 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 9 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 10 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 11 of 12 BES FACILITY TOWN HALL MEETING GENERAL INFORMATION - slide 12 of 12
Description: BES FACILITY TOWN HALL MEETING GENERAL INFORMATION ABOUT BES BES 1ST grade wing was built in 1959 and completely renovated in 2020. The cost of this renovation was approximately 930,000. In 1983, the Kdg.2nd grade wing addition occurred.

Related Topics

Download Presentation

"BES FACILITY TOWN HALL MEETING GENERAL INFORMATION" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Presentation Transcript

slide1. BES FACILITY TOWN HALL MEETING<br>
slide2. GENERAL INFORMATION ABOUT BES BES 1ST grade wing was built in 1959 and completely renovated in 2020. The cost of this renovation was approximately $930,000.
In 1983, the Kdg./2nd grade wing addition occurred.
In 1988, the 3rd/4th grade wing and gym addition occurred.<br>
slide3. THE FUTURE OF BES There are current issues we need to address at BES to meet the needs of 21st century learners. Student needs have changed over the past 30 years with an inclusion model for unique student needs and new educational techniques and technologies.
We are considering moving 5th grade back to BES. The decision to have a PK-4 BES, a grades 5-8 BMS, and a grades 9-12 BHS was due to space many years ago.<br>
slide4. TWO OPTIONS FOR BES One option would be to add on/renovate the current BES. The City of Burlington has given us the land to the north of BES in a Quit Claim Deed. We can use this land as we see fit for the future of BES.
A second option would be to build a new BES close to BHS and BMS and create a district campus area within ½ mile of all buildings. We own 17 acres north of Wildcat/Ladycat Baseball and Softball fields we could build on.<br>
slide5. PROS FOR ADDING ON/RENOVATING Cost of adding on/renovating BES is about $15 million.
Nice playground that is 8 years old.
BES exists in a neighborhood setting around many homes.
Rapid response time in case of an emergency.
Larger cafeteria and fewer lunch periods.<br>
slide6. CONS FOR ADDING ON/RENOVATING Renovation will be lengthy, challenging, and disruptive to learning.
We are landlocked without additional space for growth.
Traffic at drop off and pick up is very difficult.
Proximity to the new justice center.
Not able to use Wildcat Athletic Complex for school activities.<br>
slide7. PROS FOR A NEW BES All buildings will be on one campus.
BES could use Wildcat Athletic Complex and BRC for PE classes and special activities.
Grounds and maintenance would be able to take care of all facilities in a ½ mile campus.
A new school would take care of current needs and future growth.
Bus transportation would be more efficient with all schools together.<br>
slide8. CONS FOR A NEW BES Cost of a new building will be about $30-$45 million.
What do we do with the current BES?<br>
slide9. WHAT COULD WE DO WITH THE CURRENT BES? One possible option is to move the BELC into the 1st and 2nd grade wings, move the board of education office into the building, and offer space to Flint Hills Tech College, Allen County Community College, or Emporia State University for satellite classes.
Another possible option is to sell the building.<br>
slide10. OTHER FACTORS TO CONSIDER What we do moving forward has bigger implications for the district.
Moving 5th graders back to BES frees up room for growth at BMS.
If we decide to build a new BES, we could move the BELC to the current BES.
Right now, we have about 55 kids from birth to age 5 attending the BELC. We have a waiting list of about 40.
BHS was built to have up to 400 students. Right now, we have about 265 students.<br>
slide11. POSSIBLE RENOVATIONS AND COST FOR 2024-25 Replace or move northwest playground with similar structure/turf--$800,000
New carpet in PK/Kdg, 2nd, 3rd, and 4th Grade wings--$300,000
Counter tops/cabinetry removal and install--$550,000
LED lighting replacement--$250,000
Ceiling tile replacement--$65,000
Removal of north side pillars--$50,000<br>
slide12. POSSIBLE RENOVATIONS AND COST FOR 2024-25 (CONT.) Add PK/Kdg. restrooms in each room--$100,000
Add office to north side of building/add parking lot--$3,000,000
Add cafeteria/food prep kitchen--$6,000,000
New roof--$1,200,000
TOTAL=$12,315,000
NOTE: THIS DOES NOT INCLUDE ANY PLUMBING OR ELECTRICAL UPGRADES TO THE EXISTING BUILDING. CONSTRUCTION COSTS WILL INCREASE 3% TO 10% EACH YEAR.<br>