Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984 Promote Research, Development and Popularization of Non-Conventional and Renewable Sources of Energy VISION Provision of minimum illumination to all Remote
"Odisha Renewable Energy Development Agency (OREDA)" is the property of its rightful owner. Permission is granted to
download and print the materials on this website for personal, non-commercial use only, and to display it
on your personal computer provided you do not modify the materials and that you retain all copyright
notices contained in the materials. By downloading content from our website, you accept the terms of this
agreement.
Presentation Transcript
01
Odisha Renewable Energy Development Agency
(OREDA)
Established: 17.2.1984<br>
02
Promote Research, Development and Popularization of Non-Conventional and Renewable Sources of Energy
VISION
Provision of minimum illumination to all Remote Un-electrified Villages/hamlets by 2015
Increase the share of Renewable Energy to 10% of the total power mix by 2020
Accelerated use of Renewable Energy Technology in all sectors of economy Mission<br>
03
Major Programs being Implemented by OREDA
Solar Water Pumping Program for piped drinking water supply
Solar water pumping program for Irrigation
Rooftop and off-grid solar power plants
Distribution of solar lanterns
RE Power Projects
Implementation of RPO and REC mechanism
Village Electrification
Unnat Chulla Abhiyan
National Program of Biogas and Manure Management
IEC and Outreach<br>
04
Solar Water Pumping Program for piped drinking water supply Phase I ( RWSS)
For 18 IAP Districts only
Target : 1762
No. installed : 1762 Phase II ( RWSS)
For 18 IAP Districts only
Target : 1762
No. installed : 1682 Phase III ( RWSS+ MNRE)
For all Districts
Target : 2000
No. installed : 312<br>
05
Solar PV Pumping Program for Irrigation Project is on the verge of starting
Target for 2014-15: 3000
Steering Committee and finance committee have cleared the project
Financial arrangement
Target : 2610<br>
06
Rooftop and off-grid Solar Power Plants
The program is mainly implemented for Government buildings, residential schools, hostels, Sevashrams, Health centres, police stations, forest offices, district offices, blocks , Panchayats etc.
Total installed capacity till 14-15: 5.114 MW
Projects Under implementation during 15-16:
Hostels under BJRCY: 25 x 10 KW
SCST hostels/Schools : 19 x 10 KW
Kendu leaf godowns : 17 x 3 KW
District Collectorates : 6 X 10 KW
EMRS schools : 2 x 5 KW
Primary Health Centres : 6x 6 KW
Police stations : 39 x 2.5 KW
Petrol pumps: 2 x 2 KW
Sevasharm schools ( 55 Nos): 297 KW<br>
07
RE Power Projects
Total installed capacity:
Solar : 43.0 MW + 5.0 MW under REC
Biomass: 20.0 MW + 30.4 MW under REC
Projects in pipe line
Solar : NIL
Biomass: 10 MW
New Application received
Solar : Nil
Biomass : 12 MW<br>
08
Implementation of RPO and REC mechanism
In Odisha the RCPO Regulation 2010 is under implementation as per which the quantum of obligation is as under
OERC has come up with a draft regulation as per which the quantum of obligation is as under<br>
09
Implementation of RPO and REC mechanism (Contd…)
Obligated entities identified in the state : 62
Captive consumers : 50
Open access consumers: 12
Partial compliants: 20
OREDA had filed a petition in OERC against all non compliant obligated entity 20.11.2014 requesting action under Section 142.
Hearing of the case has been concluded on 5th May 2015 but Order has been kept reserved.<br>
10
Projects Accreditated by OREDA Under
Energy Certificate (REC) Mechanism<br>
11
Village Electrification
Villages electrified
Under RVEP till 11-12 : 1621
Under pilot project of MNRE : 1
Under DDG : 7 ( work in progress)
Projects in pipe line:
Projects under DDG : 7
Tribal hamlets/ habitation with
financial assistance from MoTA: 250
Villages identified for electrification by
STSC Dev. Department : 700<br>
12
Distribution of Solar Lanterns
The program for distribution of solar lanterns to weavers and handicraft artisans started in 2013-14
Lanterns distributed till end of 2014-15
Weavers : 25,503
Handicraft Artisans: 16,428
Total 41,932
For the current year apart from weavers and handicraft artisans households using kerosene for illumination purpose in KBK region and western Odisha are also being included under the program.
Target for 2015-16 : 20,000<br>
13
National Biogas and Manure Management Program (NBMMP)
Total potential of domestic biogas plants : 6 00,000
Plants constructed till 2014-15: 2,38,872
Target for 2015-16: 5,100
Achievement till July 2015: 211<br>
14
Unnat Chullah Abhiyan
Target for 2015-16
Family Type : 15000
Community Type : 6000 It has been programmed to construct 20,000 PARISHAD model community chulah ( with chimney) in schools & Anganwadi centers under MDM with financial support of state Govt. The said chulah has been tested in IMMT, Bhubaneswar and performance parameter is found to be satisfactory. 563 chulah have been installed till July 2015 in schools. MNRE may consider CFA for above category of chulah under UCA .
.<br>