CHAMBER PRODUCTION AT - PPT Presentation

CERN 904 RPC upgrademeeting 04 SEP2013 Dong hyun Kim on behalf of the cern904 team Department of physics sungkyunkwan university korea 1 Content Status of new Gap amp Package ID: 495295

status gaps cern chamber gaps status chamber cern 904 sep 2013 higher 3re4 bottom bubble current pocked gap

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "CHAMBER PRODUCTION AT" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

CHAMBER PRODUCTION AT CERN 904

RPC upgrade-meeting, 04.SEP.2013Dong-hyun Kim on behalf of the cern-904 teamDepartment of physics, sungkyunkwan university, korea

1Slide2

Content

Status of new Gap & PackageStatus of ChamberPlan2Slide3

1. Status of new Gaps

We received a new 11 set Gaps from KODEL at 20.Aug

3Slide4

1. Status of new Gaps

Package

WET

The screw is rusted shut and won’t open

Need a RUST SOLUTION

4Slide5

1. Status of new Gaps

New Gaps – 11 setReject Gaps

No.

Gap nameReason1

TN052

Bubble

2

TN054

Pocked on bottom side

3

TN056

Huge bubble on bottom side

4

BO46

Bubble

5Slide6

1. Status of new Gaps

TN052

Bubble

Small pocked

6Slide7

1. Status of new Gaps

TN054

Pocked

7Slide8

1. Status of new Gaps

TN0568Slide9

1. Status of new Gaps

BO469Slide10

1. Status of new Gaps

Dark current resultAmong 10 gaps, 7 gaps failedSymptom – 4μA / 6 kV( Higher Current )Try to dry with Argon gas -> Unimproved gapsConjecture : Damage gaps by too much higher Humidity

10Slide11

2. Status of Chamber

CERN 904 site built11

TYPE

RE4/3

RE4/2

Production

26

72.22%

30

83.33

%

Successfully tested

19

52.78 %

24

66.67

%

Chamber to be test

7

19.4 %

6

16.67 %

* At

03

.Sep.2013Slide12

2. Status of Chamber

Transfer to QC412

TYPE

SITE

RE4/3

RE4/2

CERN

26 (72.22%)

30 (83.33%)

GEANT

14 (38.89%)

0

BARC

0

8

(

22.22%)

TOTAL

40

38

* At

03

.Sep.2013Slide13

3. PLAN

Darkcurrent test for a New gapsBuild a New chambers13