NSF/ANSI 58 – 2014 NSF/ANSI 58 – 2014

NSF/ANSI 58 – 2014 - PowerPoint Presentation

alida-meadow
alida-meadow . @alida-meadow
Follow
396 views
Uploaded On 2016-04-05

NSF/ANSI 58 – 2014 - PPT Presentation

Reverse Osmosis Drinking Water Treatment Systems Sampling systems with storage tanks Mandy Huntoon DWTS Laboratory Group Leader NSF International Joint Committee Issue Paper Influent and product water samples shall be collected and analyzed for all test contaminants following 4 h and 12 h on ID: 274195

tank storage collected sample storage tank sample collected day analyzed test volume contaminant withdrawn emptied days rate production systems period emptying sampling

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "NSF/ANSI 58 – 2014" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

NSF/ANSI 58 – 2014

Reverse Osmosis Drinking Water Treatment SystemsSampling systems with storage tanksMandy HuntoonDWTS Laboratory Group LeaderNSF International

Joint Committee Issue PaperSlide2

Influent and product water samples shall be collected and analyzed for all test contaminants following 4 h and 12 h on Day 1 of testing. The storage tank shall be emptied at each sample point. On Days 2 to 4 of testing, 5% of the first day's production rate shall be withdrawn from the storage tank at the beginning of the day and after an elapsed time of 6 and 12 h. A test contaminant sample shall be collected and analyzed from the tank. Days 5 and 6 represent a 54-h stagnation period, under pressure, during which no product water shall be withdrawn.

At the start of Day 7, 144 h into the test, a sample shall be collected and analyzed, followed

by emptying of the storage tank. A final sample shall be collected and analyzed on Day 7 for the first 4-h period, and the storage tank shall be emptied after each test contaminant sample collection. After the last sample for test contaminants is collected, the storage tank shall be emptied.

Sampling systems with storage tanksSlide3

Variation in sampling

Day 1The storage tank shall be emptied at each sample point. Days 2 to 4 Systems with storage tank and automatic shut-off: 5% of the first day's production rate shall be withdrawn from the storage tank. A test contaminant sample shall be collected and analyzed from the tank.

Counter top systems with storage tanks or reservoirs: 5% of the first day's production rate shall be withdrawn from the storage tank from which a test contaminant sample shall be collected and analyzed.

Day

7

A sample shall be collected and analyzed, followed by emptying of the storage

tank. A

final sample shall be collected and analyzed

for

the first 4-h period, and the storage tank shall be emptied after each test contaminant sample collection. Slide4

Sampling Options A sample shall be collected and analyzed, followed by emptying of the storage tank.

Collect the first volume from the system?Discard a specified volume,

then collect?

What is the appropriate s

ample

volume size?

The storage tank volume is collected in a suitable container and the sample for analysis is collected from that volume. Slide5

NSF Recommendation

Days 1 & 7The storage tank volume is collected in asuitable container and the sample for analysis is collected from that volume. Days 2-45% of the first day's production rate shall be withdrawn from the storage tank from which the