Presentation contains forwardlooking information relating to among other things a the future financial performance and objectives of Canadian Foresight Group Ltd the CFG and b plans and expectations of the Corporation  Such information may be identifiable by the terminolog ID: 541144

offshore gas myanmar information gas offshore information myanmar wells tcf production major project estimated located thailand myanmar

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "This presentation (the "" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1
Slide2

This presentation (the "

Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and objectives of Canadian Foresight Group Ltd. (the “CFG”) and (b) plans and expectations of the Corporation.  Such information may be identifiable by the terminology used, such as, but not limited to "plan," "anticipate," "predicts", "projects", "believes", "seeks", "intends," "expects," "estimate," "budget," "forecast," "will," "may," "should," "would," or other similar wording.  The forward-looking statements are based on the Corporation’s current expectations, assumptions, estimates and projections about future events. The forward-looking information is subject to numerous known and unknown risks, uncertainties, and other factors, most of which are beyond the control of the Corporation, which may cause actual results, levels of activity and achievements to differ materially from those expressed or implied by such information. Readers and prospective investors are cautioned not to place undue reliance on any forward-looking information contained in this Presentation.  The Corporation undertakes no obligation to update or revise forward-looking information contained in this Presentation, whether as a result of new information, future events, or disclose the occurrence of unanticipated events or otherwise.  All information and material included in this Presentation is current as of April 2014, unless otherwise stated. Please be cautioned that all forward-looking information contained in this Presentation is expressly qualified by this cautionary statement.

DisclaimerSlide3

Canadian Foresight Group Limited (“CFG”) is founded by a group of investors and key team members of an oil company operating in Canada.

CFG has a very experienced management team with expertise in both onshore (Canada) and offshore oil/gas exploration particularly in Asia and development with over 180 years industry working experience.CFG was established to pursue international E&P opportunities in Asia. CFG has very strong financing support from existing share holders and financial institutions from North America and AsiaAbout UsSlide4

Shares outstanding:

145.5 million sharesCapital raising: Planning to raise US$30 million to US$100 million by mid-2014 at $0.50/shareBacking from major institutions and investors from Asia and North AmericaCompany Structure Slide5

Map of MyanmarSlide6

Major strategic and potential location for regional trade and transport hub

Richly endowed with natural resourcesLarge and relatively young populationRich cultural heritageStrong economic growth potentialOpportunities in MyanmarSlide7

Multi-TCF potential of the underexplored offshore blocks

Myanmar is still considered as frontier land with an estimated 3.2 recoverable billion barrels of oil out of estimated 540 billion barrels in place and 18 TCF of proven gas reserves out of estimated 89 TCF potential gas reservesMyanmar’s domestic gas demand is increasing and energy security a concern. There exist an exceedingly robust domestic gas demand from neighboring countries such as Thailand, China and IndiaInfrastructure for oil and gas delivery is builtReason to Invest in O & G ExplorationSlide8

Myanmar’s Offshore Blocks BiddingSlide9

Major Offshore Gas projects(1)

YADANA GAS PROJECTEstimated gas reserves of 6.7 TCF. Started operating in 1998. Gas production is 870 MMSCFD. 17 wells in total are connected to 3 platforms.Located in blocks M5 and M6 with an area of 26, 140 sq. km.

Operated by Total and partnered with PTTEP, Myanmar Unocal, and MOGE

Gas exported from gas field to Thailand

There are a number of discovered gas fields being developed in these blocks that are prospective.Slide10

Major Offshore Gas Projects (2)

ZAWTIKA PROJECTEstimated gas reserves of 8 TCF with targeted production of 300 - 400 MMSCFD. First gas production was in Feb 2014. 35 wells in total are connected to 3 platforms.Located in block M9 and small NE part of M11 with an area of 11,746 sq. km. Zawtika, Gawthaka, and Kakonna gas fields were discovered in 2007.Operated by Thai state-owned enterprise PTTEP (80%) and partnered with MOGE (20%). 2/3 of gas exported to Thailand and the rest is for Myanmar’s domestic use.Slide11

Major Offshore Gas Projects(3)

YETAGUN GAS PROJECTEstimated gas reserves of 4.2 TCF with 2013 Q4 production of 442 MMSCFD and liquids condensate of 10,431 bbls/d. This has one platform with 10 wells.Located in blocks M12, M13, and M14 within an area of 24,130 sq km.Operated by Petronas and partnered with PTTEP, Nippon, Mitshubishi, MOGE (10 wells).

Production started in April 2000.Slide12

Major Offshore Gas Projects(4)

SHWE GAS PROJECTEstimated gas reserves of 9.1 TCF with production of 700 MMSCFD.Located in blocks A1 and A3, in the Rakhine offshore . It has 11 wells on the platform and 4 wells in the subsea wellhead.Operated by Daewoo and partnered with ONGE, GAIL, KOGAS, and MOGE

Export of gas to China started in 2013.Slide13

Major Pipelines - Myanmar to China

The gas pipeline from Myanmar to China carries the gas extracted from Shwe gas project located offshore of the Bay of Bengal.

The crude oil pipeline is designed to carry approximately 22 million tonnes of oil per year.

The design capacity of the natural gas pipeline is 13 Bm³. It is expected to deliver 12 Bm³ of gas to China every year, while reserving1Bm³ of gas for Myanmar's domestic useSlide14

Major Pipelines - Myanmar to Thailand

Gas extracted from the Yetagun project started flowing to Thailand in 2000 at about 200 mmcfd. In August 2004, this figure doubled after four new wells went online. With the new wells, overall production climbed to 500 mmcfd, with 400 mmcfd exported to Thailand.

The offshore Yadana gas project, where Total is the operator of the project, exports 600 mmcfd to Thailand. About 200 mmcfd are used to meet Myanmar’s domestic needs.Slide15

Myanmar’s Offshore Blocks Bid ResultsSlide16

CFG participated in Myanmar’s Nov. 2013 offshore bidding round along with Transcontinental Resource Group (TRG) and Myanmar’s KMA Group.

Under the terms of the bidding agreement, TRG will be carried through the seismic program after which it needs to elect to participate for a 10% interest or convert to a 0.33% GOR. KMA will receive a10% carried interest through the exploration program.CFG was awarded Shallow Offshore Block M-15 on March 2014. Under the terms of joint bid, CFG will undertake a seismic program and drill two wells.CFG’s Myanmar Activities Slide17

M-15 Offshore BlockSlide18

Block M-15 is located in the Andaman Sea, within the Tanintharyi Offshore basin, which is off Myanmar’s southern Tanintharyi coast.

The area of block M-15 covers 12,150 square km. One of the biggest offshore gas fields in Myanmar, Yetagun gas field, is located 60 km to the north of M-15. The Yetagun field contains an estimated 4.2 trillion cubic feet of recoverable gas. Daily production is about 400 mmcf/day with 12,000 bbl/day condensate.According to regional magnetic information, M-15 is located at the Transgression/regression channel area from Eocene to Miocene age. Both Clastic and Carbonate reservoirs are prospective targets within this block. One well, M15-B1, was drilled in January 2005. The well was drilled to 3440 ft and abandoned. An evaluation of the data has led to the determination that the well was drilled too shallow.

Approximately 1753 line km of 2D-seismic has been acquired. Previous geophysical and geological work had identified several prospects with potential from 1 TCF to 5 TCF gas and indicate significant structural and stratigraphic traps. Additional 2D and 3D seismic work are required to identify the most promising closures.

M-15 Block DescriptionSlide19

The objective of drilling M15B-1well was to test

the hydrocarbon potential of the Oligocene/Early Miocene Carbonate reef build up which is a combination of stratigraphic/structural play.lower Miocene clastic sandstone reservoir.Upper Oligocene reservoirSpud Date -12 January 2005 Depth -3440 ftWater Depth -925 ftPrimary objective found at 1152 ft .Porosity 27% .

Temperature gradient is 1.94 deg F/ 100’.Plug & Abandon .

(Yetagun Temp. gradient is 2.65 deg F/ 100’)

M15-B1Well SummarySlide20

Bank: Royal Bank of Canada

Legal Firm: McCarthy Tétrault LLP, DFDLEngineering: D&M Additional informationSlide21

Kevin Flaherty

Executive DirectorCanadian Foresight Group Ltd.Mobile: +84 978 706 255Email: kevin.flaherty@saigonam.com TMS Building, 12th Floor172 Hai BaTrung Street, District 1Ho Chi Minh City, VietnamTelephone: +84-8-54043488Contact Information