Group members NIRAV JAYANTIBHAI DHANDHUKIA SHELADIA MIHIRKUMAR KISHORBHAI NAIR VIDYA SIVADASAN Branch Civil Guide Dorin Parmar Shankersinh Vaghela Bapu Institute of Technology 075 ID: 1026154

water canal constructed level canal water level constructed called drain drainage structure bed fall classification escape regulator cross head

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Water Conveyance System" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1. Water Conveyance SystemGroup membersNIRAV JAYANTIBHAI DHANDHUKIA SHELADIA MIHIRKUMAR KISHORBHAINAIR VIDYA SIVADASANBranch - CivilGuide – Dorin ParmarShankersinh Vaghela Bapu Institute of Technology(075)

2. •Water Conveyance System Water Conveyance System• Canals-Canals are the structure constructed to carry or transport water from the reservoir to the area which is to be irrigated• Conduits- A pipe is close conduits used to carry water under pressure.CanalsConduits

3. Canals• Classification of canal• Classification based on source of supply i) Permanent Canalii) Inundation canalPermanent canal is one which is fed by apermanent source of supplyInundation canal usually draws supplieswhenever there is flood

4. • Classification based on function• Irrigation canal- carries water toagriculture fields• Feeder canal- feeds another canal• Navigation canal- provides navigationfacilities

5. • Classification based on origin of canal in acanal network• Main canal-carries water from reservoir• Branch canal- when a main canal reaches area tobe irrigated it gets divided into branches joiningdifferent parts of the area• Major distributary- these are small canals takingoff from branch canal it supplies water to outlet• Minor distributary-this are small channelssupplying water to water courses for irrigation• Field channels-from this channels, water entersinto the field of cultivator

6. Canal networkBranch CanalMajordistributoryMinordistributoryField ChannelFieldChannel Head regulatorMain CanalCrossregulator

7. • CLASSIFICATION BASED ON ALIGNMENT• Contour canal-In this alignment the canal generallyfollows acontour except for necessary slopes.• Main canal runs asa contour canal• Contour canal requiresCross drainage worksBesides this it canirrigate on one side only

8. • Ridge canal- The canal aligned along naturalwatershed is known aas ridge canal.• It irrigates on both sides, C.D. works can beavoided

9. • Side long canal- In this alignment canal isacross contour• No cross drainageworks are required

10. Canal regulation works• The structure constructed to regulate the flow intothe canal network are called as canal regulators• 1) Canal head regulator The structure constructed todivert the water from the reservoir into the Maincanal is called as Head regulator• Function of head regulator is to control the entry ofwater from reservoir• To control the entry of silt• To serve as a meter for measuring discharge

11.

12.

13.

14. • Cross regulator:- A regulator constructed intothe main canal or parent canal u/s of thebranch canal so as to control the entry ofwater in branch canal is called as crossregulator.• Canal Escape:- Irrigation structuresconstructed to escape water from the canalinto some natural drain is called canal escape

15. Canal Escape

16. • Fall and rapids:-• Fall or rapids are located on the d/s side of thechannel. It becomes necessary to lower thebed level of canal when the slope of theground is steeper than gradient or slope of thecanal.• Fall:- A fall is structure constructed across acanal to permit lowering down its water leveland dissipate the surplus energy by fallingwater.

17.

18. Fall

19. Vertical Drop Fall

20. • Rapids:- A rapid is a structure constructed topermit lowering of water level by providing asloping ramp of some length this sloping rampis called Rapid.

21.

22. Cross drainage works• Irrigation structures constructed for carryingthe canal water safely over or under thedrainage water are called as cross drainageworks.• When a canal is taken off from the reservoir itmeets various natural drainages so crossdrainage works are required to be constructed

23. Aquaduct• The irrigation structure constructed forpassing canal water safely over the drainagewater is called an aquaduct• Aquaduct are constructed in followingsituations• Drainage is more as compared to canal water• The bed of the canal is sufficiently above thehigh flood level in the drain.

24.

25. Aquaduct

26. Syphon Aquaduct• When high flood level of drain is much higherabove the canal be, the drain is then syphoni.e. the bed of the drain is depressed below thecrossing.

27.

28.

29. Super passage• When the drainage water is taken over thecanal, the structure is called super passage. Itis just reverse of aquaduct.

30. Drainage waterSuperpassage

31. • Syphon superpassage:- In this case thecanal bed is depressed and ramp is providedat the exit• Drainage bed level is at higher lower than fullsupply level of canal

32.

33. Syphon super passage

34. Level crossing• When canal bed level and drain bed level arepractically the same, drainage water isallowed to intermingle with the canal water• Such type of works is known as level crossing.

35.

36. Inlet and out let• Inlet is provided in the canal to admit drainwater into it.• It is provided in following situations• Drain water is less in magnitude• Drain water is free from heavy silt• The drainage bed level is lower than F.S.l

37. Outlet• It is possible to escape out same quantity ofwater through some outlet nearby d/s. out letis provided on the bank of canal to dispose offexcess water admitted in the canal throughinlet.

38. Water conduit• A pipe is a close conduit, generally circular inc/s used to carry water under pressure.

39.

40. •Thanks