Update to COPS RMSCOPS Workshop IV Update IDR Meter Protocol Requirement Threshold 1 022415 WebEx Only IDR Required Workshop IV WebEx was held on Tuesday 022415 42 MPs were in attendance included CRs TDSPs and ERCOTs Staff members ID: 249096

idr threshold esi workshop threshold idr workshop esi ids current market ercot webex 4cp protocol requirement meter applied limit

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "April 14, 2015" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

April 14, 2015Update to COPS

RMS/COPS Workshop IV Update: IDR Meter Protocol Requirement Threshold

1Slide2

02.24.15

WebEx OnlyIDR Required Workshop IV WebEx was held on Tuesday 02/24/15 :

42 MPs

were in attendance included CRs, TDSPs and ERCOT’s Staff members

Workshop IV discussed:TDSPs’ feedback concerning how threshold changes may impact TDSP’s current and future 4CP application, billing systems and/or rate structure IF IDR Threshold is raised.Overall the TDSPs were supportive of increasing the threshold to either 1MW or could go as high as 1.5MW, however, either threshold change would be applied on a going forward basis. TDSPs’ concerns were expressed of how mass changes to their current IDR Required population may impact their current rate structure and their application of 4CP. ERCOT’s concerns were expressed:Applying new threshold changes retroactively across current population of BUSIDRRQ ESI IDs would have a Load Forecasting impact that would require a new profile assignment in order to maintain forecasting integrity, There could be negative impacts to Demand Response and DR products currently available to AMS ESI IDs and;Possible negative impacts created if large volumes of ESI IDs are transitioned from current 4CP designations.

2Slide3

02.24.15

WebEx OnlyQuestion: IF Threshold is raised do Market Participants and ERCOT have a preferred threshold limit?Question

: IF Threshold is raised should the threshold change apply to IDR meters on a going forward basis following necessary protocol(s)/guide(s) language

final approval

? Based upon Workshop IV’s Market discussions, we have come to the following: Conclusion: Raise the IDR Meter Protocol Requirement Threshold from 700 kW to 1.5MW* Note: Oncor and CenterPoint Energy verified company’s position on 1.5MW limit were both neutral positions. New Threshold limit would be applied to qualifying ESI IDs that meet the new threshold on a going-forward basis. 3Slide4

02.24.15

WebEx OnlyWorkshop IV Action Items

:

TDSPs

: Chris Rowley (Oncor) volunteered to start the TDSP(s) Matrix to memorialize each TDSP’s process of:How new threshold would be applied to qualifying ESI IDs? Will existing ESI IDs currently BUSIDRRQ profiles be grandfathered in? How would Customer(s) requesting IDR removal that no longer qualify under new threshold limits be processed?At what point would or does 4CP apply? ERCOT and K. Scott: Identify ERCOT Nodal Protocols and/or Market Guides where language will need to be modified to bring forward to Workshop V for Market Participant’s reviews, discussions and consensus. Work in Progress. K. Scott: Scheduled IDR Meter Protocol Requirement Threshold Workshop V on May 5, 2015 at 1:30 PM following RMS meeting. http://www.ercot.com/calendar/2015/5/5/59434-COPS-RMS-WORKSHOPS

4Slide5

Questions?

5