MAGNOLIA Naberezhnye Chelny city 2014 г About the company Date of foundation of the foundrymechanical plant Magnolia in Naberezhnye Chelny is the 20th of November 1989 ID: 811068

machine magnolia foundry casting magnolia machine casting foundry rubles die complex tst chelny naberezhnye led furnace project republic production

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "Investment project « Modernization of t..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Investment project«Modernization of the foundry»

MAGNOLIA

Naberezhnye

Chelny

city

2014

г.

Slide2

About the company

Date of foundation of the foundry-mechanical plant "Magnolia" in

Naberezhnye Chelny is the 20th of November, 1989

.

Activities of the company

:

Aluminum die casting

chill casting and sand casting; Design and production of aluminum radiators and components for LED lamps; Production of energy-saving LED lamps.The company has developed more than 100 types of aluminum castings. These are products for machine industry as well as for household appliances and national economy. Over the past 3 years output has increased tenfold. Magnolia is a supplier of aluminum products for the main conveyor of OJSC "KamAZ". Production capacity allows to produce up to 200 tons of castings per year.   

2

MAGNOLIA

Slide3

The content of projectDue to risks to engineering, arising as a result of Russia's accession to WTO a deep modernization of our foundry is required to achieve the level of competitiveness with the world's leading manufacturers. Modernization will be carried out using high-tech and cost-effective equipment, establishing effective methods of production. Five years ago Foundry, which was previously operating for 13 years, was purchased, its best revenue reached 6 million rubles per year.

3

MAGNOLIA

*2015

г. –

launch of the project

Slide4

14, 120 million rubles

183, 086 million rubles

Introduction of energy saving technologies

:

circulation water supply system

;

autonomous heating system

;

2. Acquisition: - die casting machines;

equipment for machining; express laboratories

.

The total project cost is 197.206 million rubles

The content of project

4

MAGNOLIA

Slide5

Purchased equipment

5

MAGNOLIA

Equipment

Quan

-ty

(

pcs

.)

Sum

,

thousand rubles.

1

X-ray machine

РПД

"200"

1

10

016,00

2

Coordinate measuring machine

Axiom

too

600 CNC

1

2

702,30

3

Machining center

M650

R AIS

1

6

780, 00

4

Foundry complex

TST

250 K

2

43

365, 00

5

Foundry complex

TST

400 K

4

101

407, 00

6

Furnace melting

- TA 200/12 K

3

1

535, 10

7

Express Lab

FVN-F20

CNR

Italia

1

2 070

,00

8

Universal milling machine

FUV

401

1

4

070, 00

9

Grinding machine

3Д725

1

5

470, 00

10

Internal Grinding Machine

1

5

670, 00

 

 

Total

:

 

16

183 

085,40

Slide6

Furnace

САТ-01

Before modernization

6

MAGNOLIA

М

die-casting machine

mod.

71109

Cast

.

machine

mod

.

А711А10

Die-casting machine

М711А07

Die-casting machine

mod

.

7А1108

die-casting machine

mod

.7А1108

die-casting machine

mod.

71109

Mechanical

workshop

Casting

Machine

mod

.А711А10

Temporary storage of metal

Welding

point

Die-casting

section

F

lash

Canteen

Fitter’s area

Area of finished products

Rejection

area

Instrumental and distributing storage

Rooms

Turning

section

Vertical milling

machine

6Р82Г

foundry

complex

TST

400

K

-

retiring equipment

Furnace

САТ-01

Furnace

САТ-01

Slide7

After modernization

7

5.

Universal milling machine

FUV

401

 

 

4.

Foundry

complex

TST 400 K

with furnace

 

3.

Foundry

complex

TST

400

K с печью

4.

Foundry complex

TST

400 K with furnace

1.

Foundry

complex

TST 400

K

with furnace

 

Canteen

 

Rooms

 

 

 

welding point

 

 

 

 

 

Fitter’s area

 

10.

Intragrinding

machine

 

Foundry complex TST 400

К

2.

Foundry complex

TST

250 K

2.

Foundry complex

TST 250 K

 

 

 

3 Foundry complex

TST 400 K with the furnace

Warehouse

 

turning section

6

.

Furnace

ТА/20012К

 

 

 

 

6.

Furnace

ТА/20012К

6.

Furnace

ТА/20012К

7.

Express laboratory

 

Die-casting section

 

Gates

 

 

9.

Flat-grinding machine

3Д725

 

Machining center

М

1000 б/у

 

12.

Machining center

М

650 R AIS

 

 

 

 

11.

CMM

Axiom

too

600 CNC8 The proposed location of the x-ray machine RPD 200 (50m ² of attached premises with a separate entrance)Gates     GatesMachining area (cleaners)                New building

MAGNOLIA

Slide8

Retiring and purchased equipment

8

MAGNOLIA

Retiring equipment

year of manufacture

Quan

-ty

(

pcs

.)

Purchased equipment

,

instead of retiring one

Quan

-ty (pcs.)

1

Casting machine mod

.А711А10

1980

1

1

Foundry complex TST-400K

1

2

Die-casting

machine mod

.7А1108

1980

2

2

Foundry complex TST-250

К

2

3

Die-casting machine

М711А07

1979

1

3

Foundry complex TST-400K

1

4

Die-casting machine mod

.71109

1982

2

4

Foundry complex TST-400K

2

5

vertical milling machine

6Р82Г

1978

1

5

Universal milling machine

FUV

401

1

6

Furnace

САТ-01

1980

3

6

Furnace melting

-

ТА 200/12К

3

 

Total

10

Total

:

10

 

 

Additionally acquired equipment

 

7

Express lab.

FVN-F20

CNR

Italia

1

 

8

X-ray machine

РПД

"200"

1

 

9

grinding machine

3Д725

1

 

10

Internal Grinding Machine

1

 

11

CMM

Axiom

too

600 CNC

1

 

12

Machining center M650

RAIS

1

 

Total

:

6

  Total:10Total:16

Slide9

Increase of orders from automakers will help to replace import of automotive components and to create conditions for transition to the Russian-made components

. «

Toyota» (Japan, Leningrad Region)

«Ford

Соллерс

»

(USA,

Naberezhnye

Chelny and Elabuga) «Knorr-Bremse» (Germany, Naberezhnye Chelny) «Federal Mogul Naberezhnye Chelny

» (USA, Naberezhnye Chelny

) «Kamminz - Kama

» (USA, Naberezhnye Chelny)

«

ZF

КАМА» (

Germany,

Naberezhnye

Chelny

)

«

КамА

Z

and

Marcopolo

» (

Brazil,

Naberezhnye

Chelny

)

«

КамА

Z

and

CNH

» (

Italy,

Naberezhnye

Chelny

)

«

Fuzo

КамА

Z

Truck Rus»(Japan, Naberezhnye Chelny) «Камаz

» (Germany, Naberezhnye Chelny)/2. Creating of export potential:- Access to foreign markets (Belarussia, Kazakhstan, Kyrgyzstan, India, Germany).

Modernization goals9

MAGNOLIA

Slide10

Aluminum die casting, chill casting, sand casting, machining

10

MAGNOLIA

die casting

chill casting

sand casting

machining

aluminum radiator of LED Lamp

of housing and public utilities

die casting

Pump housing

ИЮАШ 4061-

1307015 (

for YAZ vehicles

)

chill casting

Housing

37.1702209-200

for mechanism of gear box

on

Kamaz

and

Nefaz

vehicles

sand casting

Cover

ФТОТ

(fuel system

Of KAMAZ vehicles

)

Die-casting

Slide11

Design and production of aluminum radiators and components for assembling LED lamps for housing and public utilities

11

Radiators of lamps are specially designed for sufficient heat removal from the LED and are made of aluminum. Radiators are different with their wear resistance and vandal-proof qualities. Today we have the possibility to produce more than 20 000 pieces of aluminum radiators, assembly sets and LED lamps per month.

We supply our assembly sets to more than 80 manufacturers of LED lamps of different regions of Russia.

MAGNOLIA

Assembly set of parts for assembly of LED lamp

for housing and public utilities

Aluminum radiator of lamp

for housing and public utilities

Aluminum radiator of

budget lamp for housing and public utilities

Slide12

Production of

energy-saving

LED lamps

of housing and public utilities

Radiator of energy-efficient

LED lamp

LED lamp for public places

Lamp for public places is in series since June 2012 with capacity of 20 thousand pieces per month

.

12

Radiator of budget energy-efficient LED lamp

LED lamp for public places

MAGNOLIA

Slide13

Quality system of products, servicesThe company currently has a system of quality management, "Magnolia" is certified for compliance with GOST R ISO 9001-2008 (ISO 9001: 2008). Registration number ROSS RU.IK79.K00273. Expiry date: 30.11.2015.A program on implementation and preparation for the certification of quality management system is drawn up in compliance with the international standard ISO / TY 16949. On May 16, 2014 under a contract with the Association of certification "Russian Register" LLC "PP-Volga region" the first stage of certification audit QMS was successfully passed, the second stage of certification audit is appointed in late July 2014. Preliminarily obtaining of the certificate ISO / TY 16949 is scheduled for August 2014.

Also, since 2011 the concept of "Lean production" including 5 S Kaizen TPM is developed and implemented in the company.

1

3

MAGNOLIA

Slide14

Key project figuresSum of investment attraction – 177,

485

million rub. (90%)

Own capital – 19,721

million rub

. (10%)

Investment period

– 4,5

years

Interest rate – 12 %Project implementation period - 5 years Discounting rate – 16 %Net present value (NPV)

– 29,865 million rub

.Internal rate of return (IRR)

– 23 %Profitability index of investment (

PI

) – 1,17

Payback Period

(РВР)

3,3

years

Discounted payback period

(ДРВР) – 4,4

years

1

4

MAGNOLIA

Slide15

Efficiency of the projectEconomic effect - 29 865 thousand rubles.Budget effect - 60,170 thousand rubles.To the budget of the Republic of

Tatarstan

- 19 269 thousand rubles.To the federal budget - 40 901 thousand rubles.Social effect - creation of 55 workplaces

1

5

MAGNOLIA

Slide16

Kama innovative territorial production clusterIn November 2012 foundry-mechanical plant of Naberezhnye

Chelny

"Magnolia“ was included in "Kama innovative territorial production cluster". (Minutes of the extraordinary general meeting of the members of Non-Commercial Partnership "Kama innovative territorial production cluster" from 27.11.2012).

 

16

MAGNOLIA

Slide17

As part of the state support of small and medium business in 2014-2016 an application for grants is filed:for professional training, advanced professional training and internships of employees in the amount of 3,096 million rubles.for participation in the exhibition - fair and communicative activities in the amount of 1.995 million. rubles.to create "Center of prototyping with introduction of modern technologies of scanning and 3D

metry on the basis of the existing foundry-mechanical plant" Magnolia", amounting to 80, 596 million rubles.

 

17

MAGNOLIA

Kama innovative territorial production cluster

Slide18

Ministry of Industry and Trade of the Republic of Tatarstan1.

The project "Modernization of the foundry" entered

the catalogue of investment projects of the Republic of Tatarstan in 2014.

18

MAGNOLIA

Ministry of Economy of the Republic of

Tatarstan

1

.

The

project "Modernization of the foundry" entered Investment Memorandum of the Republic of

Tatarstan in 2014.2. As

part of "Promotion of social economic development strategy of the Republic of Tatarstan

for the period up to 2030" the project "Modernization of the foundry" is included as a priority investment project in 2014.

Slide19

Support letter of the Ministry of Industry and Trade Tatarstan Republic

 

19

MAGNOLIA

Slide20

Support letter of the President of Tatarstan Republic

 

20

MAGNOLIA

Slide21

Support letter of the Ministry of Economy of Tatarstan Republic

 

21

MAGNOLIA

Slide22

Pre-investment studies are carried out;

Project documentation and business plan are drawn up;

project "Modernization of the foundry" passed two stages of the competition of the Strategic Initiatives Agency in Moscow: primary and comprehensive examination of the field of "A new business

";

an application for protection in the Investment Council under the President of the Republic of

Tatarstan

is filed

.

Today the search for an investor is in progress. A register of potential investors from May 2012 to today is created (more than 100 potential investors).

22

Stage of project implementation

MAGNOLIA

Slide23

Government support is needed to attract investments in the amount of 177,485 thousand rubles. 1

.

Ensure available, cheap and long financial resources at 12% per annum for a period of 4,5

years.

2

.

Support

in provision of financial resources via mechanisms of government

guaranties on

the amount of attracted investments of 177 485 thousand rubles.3. Creation of the possibility to provide grace-period(

delay in payment) for a period of

12 month to pay

: - main debt in the amount of 177,485 thousand rubles

. - accrued

interest in the amount of 16,784 thousand rubles

.

23

MAGNOLIA

Slide24

Together to the heights of success

2

4

MAGNOLIA

Slide25

423808, Republic of Tatarstan, Naberezhnye Chelny, p/o box 50Academician

Rubanenko Boulevard

, h. 12, p. 2.Те

l.:

+7 (800) 100-29-12

(

toll-free in Russia

)

+7 (8552) 53-07-07 (

multichannel)Fax: +7 (8552) 53-43-20Mobile tel: +7 (965) 610-47-11Е-mail: office@magnol.ruSite: www.magnol.ru

MAGNOLIA

Contacts

19