Agenda Summary Update Current ActivitiesUpdates Startup Schedule Highlights Upcoming Talks Reports Meetings UpdatesTalks Salah Chaurize Booster Notcher Installation Ken Domann RLSUpdates ID: 629348

linac booster update work booster linac work update cavity talks waiting updates upcoming pip power installation scans meetings progress

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "PIP Update Feb 20 th 2013" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

PIP Update

Feb 20

th

2013Slide2

Agenda

Summary Update

Current Activities/Updates

Startup Schedule Highlights

Upcoming Talks, Reports, Meetings

Updates/Talks:

Salah Chaurize - Booster

Notcher

Installation

Ken

Domann

– RLS/Updates

Kiyomi Seiya – Aperture scans & magnet movesSlide3

Update

General Info

Booster

SS

: Up and operating

SS Spares still in production – waiting for ANU to finish using anode supply

Booster Absorber (Talk Today – for sure this time)

Booster Aperture Scans and magnet moves (Kiyomi Talk)

Booster

RF cavity rework – Cavity 3 being installed today and RF15 removal

Cavity 1 work - tuner work has begun (two tuners off – no surprises)

Booster Ferrites – Dennis has started physical measurements (tester back)

Physical Measurements, Low Power Testing, High Power Testing (Pat S. will help)

RFQ – Running (still sparking) – waiting on trim magnet/building source B

Modifications to source

magnetics

, Changed Buncher tube (8kw)

HLRF –mostly still waiting (putting together new PR) soon will place order

Linac Modulator – work continues – No news

?

Linac Notch -

Safety permission to operate seed source and fiber amplifiers

preliminary work on beam shaping optics

Cogging – Software work continues – but waiting for Kiyomi time

Booster Shielding –detectors placed, connected to VME, Scans on Thursday!

Booster Cavity modeling – Mohamed is using new ferrite curves

MI Startup: Word is May – not sure why not official yet?

Startup

comments (Fernanda, Todd, Mary) Studies forthcoming?Slide4

RFQ Injector

Changed sources (added magnets) sparking

Bucher power up to 8kw

LINAC

7835 replacement for 5 today

Retuning Linac – to match Injector

BOOSTER

Disconnect corrector leads at L24Install re-furbished cavity that was originally removed from L15 (a.k.a. BRF3)Align L24 long straight, all elementsRepair several BLMs in MI8 line not showing losses, document locationsLM802A,LM803B,LM803C,LM803D,LM804Repair MW804Hose replacement for V803 psInvestigate IP13-1 on half ion pumpReplace VB21 VVHTQ4 replace regulatorPG20 and PG21 replace penning gaugesBuilding 3rd NotcherPreparing Transverse Pickup for installation

Insatall

RF3Slide5

Proton Improvement Plan Projection

NOvA

Shutdown

g-2

Mu2e

8

GeV

120

GeV

LBNESlide6

Upcoming Talks

Future Meetings:

Feb/Mar

Dave Augustine - Vacuum Installations Finished and in Planning

Jean-Paul

Carneiro

-

TraceWin 3D Simulations of the Fermilab Linac Dave Johnson - Progress with Linac Notcher Amplifiers Elliot McCrory - Linac BPM Upgrades Pellico – Shielding TestingJohn Reid - Solid State Installation - Final Report Pat Sheahan - Tuner Bias Supplies Leonid Vorobiev - ORBIT Simulations on Booster Injection and Acceleration Slide7

Upcoming

Reports (upcoming)

Update of PIP Design Report – Yearly update work

PIP talks/Special Meetings

Budget Issues –

Working to address cost of spares

Additional Overhead Cost – impact still being looked at

- Please use the E-Log to put general work in progress updates/photos – weekly would be nice – if progress is being made in task