June 25 th 2014 Agenda Summary Update Current ActivitiesUpdates Ryan Crawford Anode Supply Update Peter Prieto BPM Update CY Tan Perpendicular Cavity Update Update Linac SBK Working ID: 423789
Download Presentation The PPT/PDF document "PIP Update" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
PIP Update
June
25
th
2014Slide2
Agenda
Summary Update
Current Activities/Updates
Ryan Crawford: Anode Supply Update
Peter Prieto: BPM Update
CY Tan: Perpendicular Cavity UpdateSlide3
Update
Linac SBK
:
Working
towards
CDR (in
June,
July)
Linac LN
:
W
orking
with
PriTel
on a solution
Linac Modulator
:
Build up of 25 cell – (still communicating with SLAC – finishing up some
details)
Linac Beam
Physics
:
No news
Injector
:
Planning on installing dimpled cathode on source A this week for testing
Booster Beam
:
Cogging
software work continues –
low intensity studies continue
Booster optics software – New tune control works
– still working on ACNET software/control
Booster Longitudinal dampers
- Did some transfer studies/ Still working on firmware
Booster RF
Booster RF5 has had downstream window cut
off – new ceramic window may be put on toady
Perpendicular
Cavities
– talk today
RF13 being prepared for testing ( alignment fixtures being installed today) by weekend should be running (Install in mid-July)
Cavity 20 –
on mill
Booster
Anode Supplies
–
update talk today
Booster
Bias supplies
– Third supply delivered to MI-60 and starting dis-assembly work (Monday), Bias 1 in test stand, Bias 2 waiting TS
Booster Shielding
– Safety Going over data….
Booster BPM work
–
talk today
Booster Absorber/Kicker
– Pulsing continues in gallery with three loads, short kickers being built
Design of insert sleeve is under investigation, New offset S12 bellows being designed
Slide4
Cavities Refurbishment
10
of 19 cavities have been
refurbished
Cavity RF 2
being prepared for testing
Cavity RF 5
ready for new window - today
RF 5 removed for repair
Estimated Install dateSlide5
Recent PIP Budget/News
Budget Issues:
Budget meeting today with Ann Nestander
General: P5 report out – PIP II is
still the
plan
Meetings to
discuss transition PIP to
PIP II underwayPMG – Next Tuesday Lots of shutdown talk – No wordUpdate of RLS – Some Booster items remainPost-Doc position for PIP – Preparing visit Slide6
Upcoming Talks
Future Meetings to be Scheduled:
Matt/John
– New Tuner
Kiyomi Seiya - Cogging
Tom Kubicki – New Booster Cavity Plan
Bill Pellico - Loss Scans and Shielding Assessment
John Reid - Solid State Installation - Final Report