June 25 th 2014 Agenda Summary Update Current ActivitiesUpdates Ryan Crawford Anode Supply Update Peter Prieto BPM Update CY Tan Perpendicular Cavity Update Update Linac SBK Working ID: 423789

update booster today pip booster update pip today cavity linac talk work working budget cavities testing window software bias

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "PIP Update" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

PIP Update

June

25

th

2014Slide2

Agenda

Summary Update

Current Activities/Updates

Ryan Crawford: Anode Supply Update

Peter Prieto: BPM Update

CY Tan: Perpendicular Cavity UpdateSlide3

Update

Linac SBK

:

Working

towards

CDR (in

June,

July)

Linac LN

:

W

orking

with

PriTel

on a solution

Linac Modulator

:

Build up of 25 cell – (still communicating with SLAC – finishing up some

details)

Linac Beam

Physics

:

No news

Injector

:

Planning on installing dimpled cathode on source A this week for testing

Booster Beam

:

Cogging

software work continues –

low intensity studies continue

Booster optics software – New tune control works

– still working on ACNET software/control

Booster Longitudinal dampers

- Did some transfer studies/ Still working on firmware

Booster RF

Booster RF5 has had downstream window cut

off – new ceramic window may be put on toady

Perpendicular

Cavities

– talk today

RF13 being prepared for testing ( alignment fixtures being installed today) by weekend should be running (Install in mid-July)

Cavity 20 –

on mill

Booster

Anode Supplies

update talk today

Booster

Bias supplies

– Third supply delivered to MI-60 and starting dis-assembly work (Monday), Bias 1 in test stand, Bias 2 waiting TS

Booster Shielding

– Safety Going over data….

Booster BPM work

talk today

Booster Absorber/Kicker

– Pulsing continues in gallery with three loads, short kickers being built

Design of insert sleeve is under investigation, New offset S12 bellows being designed

     Slide4

Cavities Refurbishment

10

of 19 cavities have been

refurbished

Cavity RF 2

being prepared for testing

Cavity RF 5

ready for new window - today

RF 5 removed for repair

Estimated Install dateSlide5

Recent PIP Budget/News

Budget Issues:

Budget meeting today with Ann Nestander

General: P5 report out – PIP II is

still the

plan

Meetings to

discuss transition PIP to

PIP II underwayPMG – Next Tuesday Lots of shutdown talk – No wordUpdate of RLS – Some Booster items remainPost-Doc position for PIP – Preparing visit Slide6

Upcoming Talks

Future Meetings to be Scheduled:

Matt/John

– New Tuner

Kiyomi Seiya - Cogging

Tom Kubicki – New Booster Cavity Plan

Bill Pellico - Loss Scans and Shielding Assessment

John Reid - Solid State Installation - Final Report