Proton->IOTA Update Proton->IOTA Update

Proton->IOTA Update - PowerPoint Presentation

conchita-marotz
conchita-marotz . @conchita-marotz
Follow
367 views
Uploaded On 2017-12-18

Proton->IOTA Update - PPT Presentation

Eric Prebys June 15 2015 F ermilab A ccelerator S cience and T echnology E Prebys ProtonsgtIOTA Update 2 61515 New name The FAST Facility Fermilab Accelerator Science and Technology Facility would encompass what is presently in the New ID: 616367

update iota prebys mev iota update mev prebys rfq proton protons ion beam commissioned source injector move hins storage

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Proton->IOTA Update" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Proton->IOTA Update

Eric Prebys

June

15,

2015Slide2

Fermilab Accelerator Science and Technology

E. Prebys, Protons->IOTA Update

2

6/15/15

New

name:

The

FAST Facility (Fermilab Accelerator Science and Technology Facility) would encompass what is presently in the New

Muon

Lab Building and its recently constructed

extension. It

will have:

The

IOTA ring (an experimental storage ring for electrons and protons)

An

electron injector (a 300-MeV SRF-based photo injector)

A

proton injector (a 2.5-MeV conventional ion source followed by an RFQ)

All

associated conventional,

rf

and

cryo

infrastructure, presently housed at the New

Muon

Lab and its extension

.Slide3

Planned Milestones E. Prebys, Protons->IOTA Update3

6/15/15

FY15

20 MeV e- commissioned

HE beam line 40%

IOTA parts 60%

FY16

50 MeV e- commissioned

150 MeV

CM2 to dump

IOTA installed

60%

FY17

IOTA installed

IOTA

e-

commissioned

IOTA research starts with

e-

Proton RFQ move

30%

FY18

Proton RFQ move

100%

Proton RFQ commissioned

FY19

IOTA research starts with

p+Slide4

Issues: lots of entropy at HINSThe major pieces still exist, but everything’s been disconnected since HINS last ran ~5 years ago.6/15/15

E. Prebys, Protons->IOTA Update

4Slide5

Entropy: cont’d6/15/15

E. Prebys, Protons->IOTA Update

5Slide6

General PlanStabilize Arealocks on cavesigns on equipment, messages to other groups: “not parts bin”Get RFQ working in current location (HINS cave at MDB)FY15:

Get ion source under vacuum and activate filament

FY16:

Establish 50kV beam from ION sourceResurrect 325MHz klystron, reconnect it, and establish 2.5 MeV Beam in situ

Establish proton beam at IOTAFY17: Move ion source, RFQ and girder to IOTA

Use new 325 MHz klystron (in storage)Use charging supply, modulator and transformer that were intended for the third ASTA

cryomodule

(at FAST)

6/15/15

E. Prebys, Protons->IOTA Update