Corallian  Energy: licence interests Corallian  Energy: licence interests

Corallian Energy: licence interests - PowerPoint Presentation

danika-pritchard
danika-pritchard . @danika-pritchard
Follow
351 views
Uploaded On 2018-11-01

Corallian Energy: licence interests - PPT Presentation

Corallian is a private company incorporated in England amp Wales in 2015 Corallian holds 5 licence interests in UK and is approved by UK regulator OGA as a licence administrator ID: 707039

regulations offshore petroleum amended offshore regulations amended petroleum drilling production appraisal days extended environmental oil corallian reach assessment reservoir

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Corallian Energy: licence interests" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Corallian Energy: licence interests

Corallian

is a private company incorporated in England & Wales in 2015.

Corallian

holds 5 licence interests in UK and is approved by UK regulator (OGA) as a licence administrator.The Corallian management team is highly experienced, averaging 30 years professional experience of petroleum exploration and development.The 98/11-”E” Colter appraisal well will be drilled with a mobile drilling unit which will be on location for a maximum of 45 days in 2018.The well will be plugged with cement and permanently abandoned.Any future exploitation will be performed from an onshore location.Slide2

Drilling Operations (up to 45 days)2The drilling rig will be a mobile “Jack-Up” unit with 3 or 4 legs, a drilling derrick and a deck.A full Environmental Impact Assessment (EIA) is being undertaken and an Environmental Statement (ES) will be submitted to the Department for Business, Energy and Industrial Strategy (

BEIS) for consideration under The Offshore Petroleum Production and Pipelines (Assessment of Environmental Effects) Regulations 1999 (as amended

). This will be subject to a 30 day public consultation period.

The maximum height of the legs or the derrick will be between 90 and 120m.

Visual impact of the rig from key onshore locations will be presented in the ES.Slide3

Drilling: vertical appraisal well vs extended reach drilling production well3 Vertical appraisal well to test multiple prospective horizons.Allows accurate logging / evaluation of the accumulation(s). 35 – 40 days to drill.Extended-reach production well with horizontal section in reservoir to efficiently drain oil. 100 – 150 days to drill. Would be drilled from onshore.

Oilfield

Oil Water Contact

Extended-

reach

production

well with

horizontal section in

reservoir

-

Vertical appraisal well to test multiple objectives

Extended

reach production well

with horizontal

section in

reservoir Slide4

Regulations governing offshore drillingCrown Estate Act 1961 (within 12 nautical miles).Energy Act (2008) (as amended).The Marine and Coastal Access Act 2009.The Merchant Shipping (Oil Pollution Preparedness, Response and Cooperation) Regulations 1998 (as amended).The Offshore Chemicals Regulations 2002 (as amended).The Offshore Petroleum Activities (Conservation of Habitats) Regulations 2001 (as amended).The Offshore Petroleum Production and Pipelines (Assessment of Environmental Effects) Regulations 1999 (as amended).The Offshore Installations (Emergency Pollution Control) Regulations 2002.The Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations 2015.The Offshore Petroleum Licensing (Offshore Safety Directive) Regulations 2015.The Offshore Petroleum Activities (Oil Pollution Prevention and Control) Regulations 2005 (as amended).

4