FFIoT   Status Report – IEEE FFIoT   Status Report – IEEE

FFIoT Status Report – IEEE - PowerPoint Presentation

danika-pritchard
danika-pritchard . @danika-pritchard
Follow
342 views
Uploaded On 2020-01-20

FFIoT Status Report – IEEE - PPT Presentation

FFIoT Status Report IEEE 802 Nendica Nader Zein NEC Europe NLE Naderzeinemeaneccom Vancouver BC Canada March 12 th 2019 1 Mentor DCN 119002200ICne Outline Summary of Activities and Status of ID: 773385

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "FFIoT Status Report – IEEE" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

FFIoT Status Report – IEEE 802 Nendica Nader Zein (NEC Europe (NLE))Nader.zein@emea.nec.comVancouver, BC Canada March 12th , 2019 1 Mentor DCN 1-19-0022-00-ICne

OutlineSummary of Activities and Status of FFIoT Draft ReportNext StepMotion to start 2nd review on Draft FFIoT report

Status of FFIoT Report (1/2)First review on the First draft FFIoT report started August 3 rd 2018 with the call for comments.Call for Comments: 2018-08-03 through 2018-09-02Nendica Draft Report: "Wired/Wireless Use Cases and Communication Requirements for Flexible Factories IoT Bridged Network“.Total of around 284 comments received.157 Editorial comments107 Technical comments20 uncategorized comments Carried out comments resolution over 3 F2F meetings and 13 conference calls and produced:Final Draft#1 consolidated comments resolution in 1-18-0052-13 updated Nendica Draft FFIoT report in 1-18-0025-07 This is the subject of the 2nd review and call for comments.

Next StepMotion to start 2nd review on latest Nendica draft report.Nendica votes to approve 1-18-0025-07 as updated Nendica Draft Report and open Call for Comments (3 weeks)Consolidated Comments to be compiled by the April 7th 2019.Decide target completion of comments resolution depending on the comments received. Plan for 2 conference calls until Interim meeting May 2019; April 18th and May 9th.Continue comments resolutions during Interim May 2019 in Salt Lake City.

Motion to start review of 2nd Draft FFIoT reportMotionTo accept the Flexible Factory IoT report titled “Flexible Factory IoT: Use Cases and Communication Requirements for Wired and Wireless Bridged Networks” draft 802. 1-18-0025-07-ICne as the new “Nendica Draft Report” and initiate a 21-days Call for Comments starting March 21, 2019.Moved by: Nader Zein Seconded by : Hao Wang Yes: No: Abstains: