PM 2.5 Attainment Re-designation Approvals PM 2.5 Attainment Re-designation Approvals

PM 2.5 Attainment Re-designation Approvals - PowerPoint Presentation

danika-pritchard
danika-pritchard . @danika-pritchard
Follow
347 views
Uploaded On 2018-10-06

PM 2.5 Attainment Re-designation Approvals - PPT Presentation

EPA published Federal Register Notices Approving Attainment August 28 th for 2006 Daily PM25 Standard Effective 92717 August 29 th for 1997 Annual PM25 Standard Effective 82917 ID: 684913

pm2 attainment air standard attainment pm2 standard air region annual epa quality improvements combined pollution eliminates health benefit 2015

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "PM 2.5 Attainment Re-designation Approva..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

PM 2.5 Attainment Re-designation Approvals

EPA published Federal Register Notices Approving Attainment:

August 28

th

– for 2006 “Daily” PM2.5 Standard (Effective 9/27/17)

August 29

th

– for 1997 “Annual” PM2.5 Standard (Effective 8/29/17)

Completes a long process to meet attainment for these standards:

First designated nonattainment on April 5, 2005 for PM2.5

Annual Standard

Attainment based on “Clean” Data from 2013-2015

Re-designation Request formally submitted to EPA on 12/20/2016

Entire Knoxville Region is now in Attainment of all EPA Air Quality Standards for first time since June 15, 2004.Slide2

Some Benefits of Attainment Status

Most Obvious Benefit – Cleaner Air for better health and environment of the Region

Eliminates Stigma of Nonattainment Status for Recruiting New Industries to the Region

Reduces some requirements for environmental permitting such as New Source Review offsets

Still requires existing control technology to remain, i.e. “anti-backsliding”

Eliminates Transportation Conformity Requirement for the PM2.5 Annual Standard

Region is meeting the newer “2012 Annual Standard” therefore 1997 Standard has been revoked

Conformity still required as a “Maintenance Area” for the 2006 Daily StandardSlide3

Air Quality Improvements – Health Benefit

1999 – Total of

135

Ozone and PM2.5 Combined Exceedance Days

2015 – Total of

2

Ozone and PM2.5 Combined Exceedance DaysSlide4

Sources of Air Quality Improvements

Population, Economic Activity and Vehicle Miles of Travel all increasing, but overall pollution is decreasing.

Decreasing pollution can be attributed to:

Regulations enacted by Clean Air Act

Technology improvements

Economic Factors

One success story example is TVA, which has decreased Sulfur Dioxide and Nitrogen Oxide emissions by over 90%