Blitz 960 Brook Road Unit 3 Conshohocken PA 19428 Phone 610 8255040 Fax 610 8255080 Feb 18 2016 PUMP ampEQUIPMENT MERION Energy Savers Automatic T ube Brush ID: 536668
Download Presentation The PPT/PDF document "GPAEE New Technologies" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
GPAEE New Technologies Blitz
960 Brook Road, Unit 3, Conshohocken, PA 19428 * Phone: (610) 825-5040 * Fax: (610) 825-5080 *Feb 18, 2016
PUMP
&EQUIPMENT
MERIONSlide2
Energy Savers
Automatic Tube Brush Cleaning System for ChillersClean Condenser Water tubes yield 15 % energy savings versus fouled tubes Manual seasonal tube brushing is the standard operating procedure for most chillers. However in as little as two weeks time, tubes return to "dirty“ state
and their increased pressure drops and inefficiencies return to end of the season conditions. These values will be verified in chiller logs. Slide3Slide4Slide5
Reversing valve also applied to Plate Heat Exchangers – reverse of flow dis-lodges dirt
buildupSlide6
Energy Savers
FILTRATIONDirt in your cooling system acts as an insulator – creating inefficient heat transfer – requiring more energy for your system to operate effectively. How can we remove dirt particles?????Hydro-Cyclone Particle Separator - removes particles - 40 microns and larger from your flow stream. Sand filtration removes particles down to 5 microns. Bag filters – removes particles down to 1 micron. Continual attention by maintenance staff required. Slide7Slide8
Energy Savers
FREE COOLINGAdding a plate & frame heat exchanger, two (2) 3-way motor-operated valves, and a control panel - between your cooling tower and chiller – eliminates 2000 to 3000 hours of chiller operation annually. System pay-back in as little as one season.Slide9
Energy Savers
STOP Wasting Money with closed-circuit coolers. Replace an evaporative cooler with an open cooling tower, plate & frame heat exchanger, and circulating pump.Initial cost savings of equipment – 25 to 30%Energy savings of 45 to 50% annuallyFiberglass cooling tower with PHE/pump system offers additional life expectancies over 2X that of an evaporative cooler. Slide10Slide11
7 reason to choose a PHE / Cooling Tower system:Slide12