Pioneer Road Relocation and Reconstruction Project October 20 2016 Project Location From 3200 West Pioneer Road to 3400 West Pioneer Road Pioneer Road Relocation Project Explain the purpose of the project ID: 761647

pioneer road project relocation road pioneer relocation project sidewalk dry traffic existing

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Pioneer Road Relocation and Reconstructi..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Pioneer Road Relocation and Reconstruction Project October 20, 2016

Project Location: From 3200 West Pioneer Road to 3400 West Pioneer Road

Pioneer Road Relocation ProjectExplain the purpose of the projectExplain project funding Explain the major benefits of the projectReview the proposed improvementsProvide engineering recommendations

Pioneer Road Relocation ProjectPurposeProvide additional East-West route to help handle future traffic. (12 th Street and 1800 North) Pioneer Road – Major Arterial (80’ ROW) Re-align existing Pioneer Road to eliminate dangerous S-curves and improve safety. Re-design existing alignment to comply with American Association of State Highway and Transportation Officials (AASHTO) design standards.

Pioneer Road Relocation ProjectFundingProject to be completed within 5-10 yearsWeber Area Council of Governments (WACOG) Estimated Cost = $3,500,000.00

Pioneer Road Reconstruction ProjectBenefit - Safety UDOT COLLISION COUNTS 2013-2016 33% of accidents along Pioneer Road occur in this area .

Pioneer Road Reconstruction ProjectBenefit - Safety Crash Data DATE TYPE CONDITIONS 1-10-13 Ditch Snow 2-9-13 Parked vehicle Ice 9-16-13 Fence Dry 1-10-14 Sideswipe opp. Direction Ice 3-6-14 Fixed object Dry 12-1-14 Head on Dry 7-14-15 Fence Dry 8-13-16 Fixed object Dry *Additional accidents this month.

Pioneer Road Relocation Project Benefit - Traffic Estimated Annual Average Daily Traffic (AADT 2016) = 5,300 Average growth per year = 2.5% Estimated AADT 2050 = 12,400

Pioneer Road Relocation Project Improvements 80’ Right-Of-Way Improvements Three 12’ travel lanes (one in 8.5’ shoulders Sidewalk (6’ on the south, and 8’ on the north)

Pioneer Road Relocation Project80’ Right of Way 6’ Sidewalk 8.5’ Shoulder 12’ Travel Lane 12’ Median 12’ Travel Lane 8.5’ Shoulder 8’ Sidewalk

Pioneer Road Relocation Project Options 6 ’ Sidewalk 37’ Asphalt 6’ Sidewalk

Pioneer Road Relocation Project Options

Pioneer Road Relocation Project Recommendations Option A Minimize the taking of personal property (Determined by maintaining 30’ setback from existing homes) Eliminates S-Curve alignment which will improved safety. Provide capacity to handle future traffic. Meets AASHTO Standards for a 35 mph road.Provide local road improvement to existing residence.Limited access along alignment (Sewer District)

Questions?