National Update Presented by Lisa Washington CAE Executive DirectorCEO November 18 2015 Membership by Region Industry Partner Membership DBIA Membership Trends Annual Conference ID: 796932

build design membership cost design build cost membership months dbia excellence workshops charlotte 2016 location annual certification institute trends

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "Design-Build Institute of America" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Design-Build Institute of America National UpdatePresented by: Lisa Washington, CAEExecutive Director/CEONovember 18, 2015

Slide2

Membership by Region

Slide3

Industry Partner Membership

Slide4

DBIA Membership Trends

Slide5

Annual Conference – Registration

Slide6

Annual ConferenceOwners Attendance Trends

Slide7

Design-Build EducationSold Out Workshops:Seattle, WALong Beach, Sacramento and San Diego, CAPortland, ORWashington, DC

Added Workshops:

Charlotte, NC

Honolulu, HI

Slide8

DBIA Certification

Slide9

Financial Trend Data

Slide10

Design-Build Done Right™

Slide11

Award-Winning Projects from Across the Nation

Slide12

Excellence in TeamingSt. Jude Medical Center Northwest TowerOwner: St. Joseph Health Systems with Petra Integrated Construction StrategiesLocation: Fullerton, CADuration:

38

Months

Cost

:

$228,046,424

Slide13

Excellence in Design (Engineering) I-485/I-85 Turbine Interchange

Owner:

North Carolina Department of Transportation

Location:

Charlotte, NC

Duration:

36 Months

Cost

:

$98,743,679

Slide14

Excellence in Design (Architecture) andExcellence in ProcessBenjamin P. Grogan and Jerry L. Dove Federal BuildingOwner: General Services Administration (GSA)Location: Miramar, FloridaDuration: 25 Months

Cost

: $157,200,728

Slide15

Slide16

2016 – 2018 Goals

Slide17

2016 High PrioritiesImplement New DatabaseUpdate Core CurriculumUpdate Certification ExamEducation, Tools & ResourcesEngage Students and Young Professionals

Develop Library of One-Page Case Studies

Slide18

Questions?

Slide19

19For More Information . . .Design-Build Institute of America1331 Pennsylvania Ave. NW -4th Floor

Washington, DC 20004

202-682-0110

www.dbia.org