trip Turbine trips 2 Condensate pump and feed pump trip Turbine trips Temperature and pressure in the primary loop are increasing 3 Relief valve in the pressurizer opens OPEN ID: 616191

inserted water primary operation water inserted operation primary loop pressure injected decreasing level pressurizer increasing pump full open feed emergency core top

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "1 - Condensate pump and feed pump" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

1Slide2

- Condensate pump and feed pump

trip!

Turbine trips!

2Slide3

- Condensate pump and feed pump

trip!

Turbine trips!

Temperature and pressure in the primary loop are increasing!

3Slide4

- Relief valve

in the pressurizer opens !

OPEN

4Slide5

- Control rods are inserted !

OPEN

INSERTED

5Slide6

Pressure in the primary loop is decreasing !

INSERTED

6

OPENSlide7

- Emergency feed pump is

now in operation !

INSERTED

OPERATION

7

OPENSlide8

- Relief valve is closed

!

INSERTED

OPERATION

8Slide9

- Pressure in the primary loop is decreasing

!

INSERTED

OPERATION

9Slide10

Water level in the secondary side of stream generator is decreasing

!

INSERTED

OPERATION

10Slide11

Pressure in the primary loop is decreasing !

INSERTED

OPERATION

11Slide12

INSERTED

OPERATION

12

Water level in the pressurizer is gradually increasing !

Pressure in the primary loop is decreasing ! Slide13

INSERTED

OPERATION

13

NO WATER

There is no water in the secondary side of the steam generator !Slide14

INSERTED

OPERATION

14

NO WATER

Water level in the pressurizer is gradually increasing !

Pressure in the primary loop is decreasing ! Slide15

INSERTED

OPERATION

15

NO WATER

Why is pressure in the primary loop decreasing even though water level is increasing?Slide16

INSERTED

OPERATION

16

NO WATER

Water level in the pressurizer is gradually increasing !

Pressure in the primary loop is decreasing ! Slide17

- Emergency core cooling system is

now in operation because of the low pressure in the primary loop !

INSERTED

OPERATION

WATER IS INJECTED

17

NO WATERSlide18

Water level in the pressurizer is increasing !

Pressure in the primary loop is decreasing !

INSERTED

OPERATION

WATER IS INJECTED

18

NO WATERSlide19

It might be dangerous if the amount of water is too much in the primary loop…

INSERTED

OPERATION

WATER IS INJECTED

19

NO WATERSlide20

Water level in the pressurizer is increasing !

Pressure in the primary loop is decreasing !

INSERTED

OPERATION

WATER IS INJECTED

20

NO WATERSlide21

Emergency core cooling system is

operated

by

the manual mode from now !

INSERTED

OPERATION

WATER IS INJECTED

21

NO WATERSlide22

Water level in the pressurizer is increasing !

Pressure in the primary loop is decreasing !

INSERTED

OPERATION

WATER IS INJECTED

22

NO WATERSlide23

One

of two e

mergency core cooling systems is manually stopped and the injected water from the other one is reduced.

INSERTED

OPERATION

WATER IS INJECTED

23

NO WATERSlide24

Water level in the pressurizer is increasing !

Pressure in the primary loop is decreasing !

INSERTED

OPERATION

WATER IS INJECTED

24

NO WATERSlide25

- Water level is reaching the top

of the

pressurizer !

INSERTED

OPERATION

WATER IS INJECTED

25

NO WATER

FULL

WATERSlide26

- Water in the pressurizer is full, but measurement data at other positions in the primary loop do NOT show the

solid state…

INSERTED

OPERATION

WATER IS INJECTED

26

NO WATER

FULL

WATERSlide27

INSERTED

OPERATION

WATER IS INJECTED

27

NO WATER

FULL

WATER

Water level is at the top

of the

pressurizer !

Pressure of the primary loop is decreasing !Slide28

Water level is at the top

of the

pressurizer !

Pressure of the primary loop is decreasing !

Water in the containment sump is moved to the auxiliary building.

INSERTED

OPERATION

WATER IS INJECTED

28

NO WATER

FULL

WATERSlide29

The block values on the emergency feed water line pump have been CLOSED ! Why !

Now it is OPEN !

INSERTED

OPERATION

WATER IS INJECTED

29

FULL

WATER