Detachable Modular Flotation System DMFS 1 Bladder Inspection Inspect the entire assembly for cuts tears abrasion damage open seams loose or broken stitches and or contamination damage ID: 386786
Download Presentation The PPT/PDF document "packing Instructions" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
packing Instructions
Detachable Modular Flotation System (DMFS)
1Slide2
Bladder Inspection
Inspect the entire assembly for cuts, tears, abrasion damage, open seams, loose or broken stitches, and or contamination damage.
Remove the CO2 cartridge and inspect for
corrosion
or debris around the actuator.
Note: Ensure you are using a 24 Gram CO2 Cartridge
2
Page 1Slide3
Begin Repacking
Step 1: Fold the right side of the bladder toward the center.
Note: Notice the Red lines; these lines indicate a fan
fold.
Step 2: Fold the
left
side of the bladder in toward the center.
Step 3: Fold the
bladder
once more toward the left side.
Page
1
Page 1
Page 2Slide4
Packing Cont.
Step 4: Make
a
fold from the bottom of the bladder, just enough to cover the CO2 cartridge.
Note
: At this point your bladder should have the same fold lines as is indicated by the
Red
indicator lines
. Shown in Figure 4A
Figure 4A
Step 5:
Tuck
the bladder into the casing. Leave
approximately
¼ of the bladder exposed.
4
Page 3Slide5
Packing Cont.
Step 6: Fold the top portion of the case over the
remaining
exposed
bladder.
Side View
Step 7: Tuck the top
casing
along with the
bladder,
into the
bottom pouch.
Step 8: Fold the tabs down on
the left and right side of the pull handle, and snap the tabs to the casing.
5
Page 4Slide6
Packing Completed
Back view
6
Page 5