Public Works Department Jeremy Lollar Director June 8 2015 Primary Responsibilities Road Safety Road Maintenance Storm Water Maintenance and Repair Infrastructure Improvement Capital Projects ID: 177288

infrastructure improvement bout safety improvement infrastructure safety bout road extension maintenance repair 191st tomlinson program million awarded intersection improvements

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Westfield" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

WestfieldPublic Works Department

Jeremy Lollar, DirectorJune 8, 2015Slide2

Primary ResponsibilitiesRoad SafetyRoad MaintenanceStorm Water Maintenance and Repair

Infrastructure Improvement (Capital Projects)Infrastructure InspectionLending a

Helping

H

andSlide3

Road SafetySnow RemovalBrickmanPractical Property GroupPothole Repair FE

Harding108 tons of Asphalt placed (88 hot/20 cold)

Federal HSIP

Grant

Highway Safety Improvement Program

$1.5 Million awarded for ADA and intersection safety

improvementsSlide4

Road MaintenancePothole repairCrack sealing

Spring and Fall SeasonsNight workShoulder

repair

Infrared

p

atching

Resurfacing

Highway Safety Improvement Program

$1.5 Million awarded for intersection safety improvementsSlide5

Storm Water Maintenance and RepairErosion and encroachment inspectionCulvert

replacement and repair

Sink

hole

repair

Ditching and

swale

repairSlide6

Infrastructure Improvement2015 Spring Resurfacing156th and

Springmill Round-a-bout

191

st

and Tomlinson

Round-a-bout

Grand Park Blvd.

Extension

161st

and Oakridge Round-a-bout

Mill Street

ExtensionSlide7

Infrastructure Improvement156th and Springmill Round-a-boutSlide8

Infrastructure Improvement191st and Tomlinson Round-a-boutSlide9

Infrastructure ImprovementGrand Park Blvd. ExtensionSlide10

Infrastructure Improvement161st and Oak Ridge Round-a-boutSlide11

Infrastructure ImprovementMill St. ExtensionSlide12

Lending a Helping HandGrand ParkDesign and construction of the WYSI field additionsUnder-brush

clearing in the wooded areasRock pile removal and placement

Shade

sail

installation