I . TPC transfer to DF Install DELPHI frame, transfer rails and align them in accordance I . TPC transfer to DF Install DELPHI frame, transfer rails and align them in accordance

I . TPC transfer to DF Install DELPHI frame, transfer rails and align them in accordance - PowerPoint Presentation

ginocrossed
ginocrossed . @ginocrossed
Follow
343 views
Uploaded On 2020-06-16

I . TPC transfer to DF Install DELPHI frame, transfer rails and align them in accordance - PPT Presentation

DF170418001 Remove ITS Table TPC TRANSFER RAILS HDW needed Actions Transfer rails Verify no missing parts recondition them and locate installation equipment Omegas platform Missing floor tiles ID: 778471

gas tpc needed hdw tpc gas hdw needed actions hydraulics pulling pressure transfer install flush rails line survey connect

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "I . TPC transfer to DF Install DELPHI fr..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

I. TPC transfer to DF

Slide2

Install DELPHI frame, transfer rails and align them in accordance with ATS n. DF170418_001. Remove ITS Table

TPC TRANSFER RAILS

HDW needed

Actions

Transfer

rails

Verify no missing parts, recondition them

and locate installation equipment

Omegas

platform

Missing floor tiles

Slide3

Install DELPHI frame, transfer rails and align them in accordance with ATS n.

DF170418_001

Conduct reference

survey as in EDMS#1512691

Slide4

Conduct reference survey

Flush TPC gas and connect to back-up line

Extend

Extend TPC pressure and back-up lines

Install filters for TPC insulation volume

HDW needed

Actions

Longer lines

Chilo?

Gas supply

Chilo?

Slide5

Flush TPC gas and connect to back-up

line

Change

I-bars to A-side

How

are they installed? Heavy? Access?

HDW needed

Actions

I-Bars

Verify no missing parts in second set and recondition them

Slide6

Change

I-bars to

A-side

Pre-compress TPC

Is this support available?

Support

Hydraulic jack

Strap

HDW needed

Actions

Pre-compression equipment

Retrieve

Slide7

Pre-compress TPC

Install pulling

hydraulics

Pulling block

HDW needed

Actions

Pulling hydraulics

Maintenance

of jacks, houses and pumps?

Extensions

Retrieve two sets

Pulling blocks

Verify

Slide8

Install

pulling

hydraulics

Close back-up gas line to allow pressure monitoring

Extend

Slide9

Close back-up gas line to allow pressure monitoring

Prepare lifting hydraulics

HDW needed

Actions

Lifting hydraulics

Maintenance

of jacks, houses and pumps?

Slide10

Prepare lifting hydraulics

Pull

Things to observe:

Obstacles

TPC pressure monitorGap between screw and support

Gap in the railSF survey

Slide11

Pull

Connect

TPC to gas flush

system

Especially when lowering the TPC into the cavern the descent speed should be connected to the flush flow rate to minimize pressure fluctuations