ADU 5 Cost Saving Tips ADU 5 Cost Saving Tips

ADU 5 Cost Saving Tips - PDF document

greatbuildz
greatbuildz . @greatbuildz
Follow
353 views
Uploaded On 2021-05-23

ADU 5 Cost Saving Tips - PPT Presentation

httpswwwgreatbuildzcomaducontractorsinlosangeles GreatBuildz helps our customers have access to the best available ADU contractors in Los Angeles County Orange County and Ventura County Whether youve just purchased your first home or youve had experience with contractors before ID: 835411

ADU contractors in Los Angeles ADU Contractors accessory dwelling units

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "ADU 5 Cost Saving Tips" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

ADUs: 5 cost saving tips Paul Dashevsky www.GreatBuildz.com ADU Construction Costs • Garage C onversion (3 5 0 - 400sf): $ 7 0,000 - $100,000 • New ADU: $ 30 0 - 4 00/sf Examples: 400sf Studio $140 - 160k $375/sf 600sf One Bedroom $180 - 220k $333/sf 800sf Two Bedroom $220 - 250k $300/sf 1000sf Three Bedroom $275 - 300k $280/sf *Price per square foot goes UP with smaller ADU size Process and Timing • Garage Conversion – Process takes 3 - 6 months • Design • City Plancheck (60 - day max) • Bidding • Construction period 2 - 3 months • New ADU : Process takes 6 - 9 months • Same as above • Construction period 3 - 6 months • First Steps : • Hire an architect/designer – Cost $ 5 ,000 - $15,000 • Meet with one/few contractors – free estimates New ADU vs Garage Conversion ADU New ADU – building a new unit ground - up : • Size & design/layout • materials • fencing for privacy • utility hook - ups (sewer, water, electric, gas) Garage Conversion : What you have: What you don’t have: - Foundation/floor - Sewer line, plumbing, water heater - Exterior walls/stucco - Interior walls/windows/doors - Roof - HVAC/gas - Electrical/lighting - Kitchen/bath/flooring/interior finishes . Tip #1: Don’t Use Tile • Shower Surround • Bathroom Floor • Kitchen Backsplash Tip #2: All Electric • Range • Clothes Dryer • Water Heater Tip #3: One Plumbing Wall • Less waste lines • Less water supply lines • No plumbing under slab Tip #4: Sewer Connection Tip #5: No Utility Meters The Importance of Hiring the Right Contractor: According to a recent survey, over 50% or homeowners reported having a negative experience with their remodeling contractor! LA County has over 20,000 active, licensed General Contractors! The odds are against you! ADU Contractors Don’t: - Hire an unlicensed contractor or handyman - ‘Act’ as a General contractor and hire subs to do the project - Hire a contractor based solely on price or your ‘gut’ feeling about them Do: - Find a contractor with ADU experience - Check the contractors state license board & get their insurance documents - Call their references - Check out Google and review sites - Call Greatbuildz Contractors Screening Process Questions to ask a Contractor: 1. Have you completed any ADUs or garage conversions in my area? 2. How long have you been licensed? 3. How many projects do you take at one time? 4. What issues and extra costs might come up on a project like this? 5. Who will manage the job day - to - day? 6. Will you assist with selection of materials? 7. Will you commit to a “Code of Conduct”? Things to discuss with your Contractor before you start: 1. Working hours 2. How to deal with your pets 3. Where will work crew eat their lunch, heat their food? 4. Where will crew go to the bathroom? 5. What parts of the house are off - limits? 6. Be explicit about your requirements 7. An alternate contact & phone number 8. Best method of communication 9. Where will crew park? Paul Dashevsky www.Greatbuildz.com 818 - 317 - 3567