10Stabilized Construction EntranceThis Supplemental Specification repl 10Stabilized Construction EntranceThis Supplemental Specification repl

10Stabilized Construction EntranceThis Supplemental Specification repl - PDF document

harper
harper . @harper
Follow
345 views
Uploaded On 2021-09-28

10Stabilized Construction EntranceThis Supplemental Specification repl - PPT Presentation

Page Supplemental Technical Specification forSTABLIZED CONTRUCTION ENTRSCDOT Designation SCM81510718Page 132Inspection and Maintenance of Stabilized Construction EntrancesInspect stabilized constr ID: 889299

stabilized construction 815 entrance construction stabilized entrance 815 stone sediment item replacement offsite site directed tracked wash entrances mud

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "10Stabilized Construction EntranceThis S..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 Page 1.0Stabilized Construction Entranc
Page 1.0Stabilized Construction EntranceThis Supplemental Specification replaces sections 815.1.1.4, 815.2.9, 815.4.14815.4.14.1,815.4.14.2, 815.4.14.3,815.5paragraph 14, and 815.6paragraph 12for Supplemental Technical Specification for STABLIZED CONTRUCTION ENTR SCDOT Designation: SC - M - 815 - 1 0 ( 7/18 ) Page 1.3.2Inspection and Maintenance of Stabilized Construction EntrancesInspect stabilized construction entrances every seven (7) days. Check for mud and sediment buildup and padintegrity. Wash, replace, or add stone whenever the entrance fails to perform effectively or as directed by the inspector. The stone in the entrance should be washed or replaced whenever the entrance fails to reduce mud being carried offsite by vehicles. Frequent washing will extend the useful life of the stone. Reshape stone pad as needed for drainage and runoff control. Brush or sweep up soil that has been tracked offsite immediately for proper disposal. Flushing should only be used when the water can be discharged to a sediment trap or basin. Maintain the stabilized construction entrance until the remainder of the construction site has been fully stabilized. Repair any broken pavement immediately.For sites with wash racks at each site entrance, sediment traps will have to be constructed and maintained for the life of the project.If the aggregate material is being tracked offsite, limit larger

2 vehicles from the construction site or
vehicles from the construction site or use a larger diameter stone. If excessive sediment is being tracked onto the roadway, increase the length of the stabilized construction entrance.1.3.3AcceptanceObtain RCE acceptance and approval for stabilized construction entrance installationsand for the replacement of stone1.4MeasurementThe quantity of the pay item Stabilized Construction Entrance is the surface area of the stabilized construction entrance inplace and is measured by the square yard (SY), complete, and accepted. When replacement stone is authorized by the RCE, the area of replacement stone in the stabilized construction entrance is measured and added to the quantity of this item.1.5aymentPayment for Stabilized Construction Entrance is full compensation for constructing stabilized construction entrances as specified or directed and includes furnishing, installing, inspecting, maintaining, reshaping, removing, and disposing the stabilized constructionentrance; providing wash down facilities, drainage, geotextile under the aggregate; sweeping adjacentroadways as necessary or directed; and all other materials, labor, equipment, toolssupplies, transportation, and incidentals necessary to fulfill the requirements of the pay item in accordance with the Plans, Specifications, and other terms of the Contract. Bid Item Number Des cription Units 8156490Stabilized Construction Entranc