100 funded by industry Building owners Design and construction companies Software and hardware vendors 19882000 Building Information Modeling BIM 20002010 Virtual Design and Construction VDC project focus ID: 807522

construction design performance vdc design construction vdc performance cife virtual management projects multi engineering objectives cost work reduction disciplinary

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "CIFE welcome CIFE Overview" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

CIFE welcome

Slide2

CIFE Overview

100% funded by industry

Building owners

Design and construction companiesSoftware and hardware vendors1988-2000Building Information Modeling (BIM)2000-2010Virtual Design and Construction (VDC) – project focus2010+Optimize Facility PerformanceEnterprise focus

2

Slide3

Current success stories:

Reports from 2012 CIFE Summer Program

Designers/engineers:

30% reduction in project schedule (GPLA)33% cost reduction (Sera)328x increase in number of design versions (Arup)99.99% reduction in design cycle time (Beck)Design-Builders:

48% reduction in man hours (Beck)30% reduction in cost (NCC)>99% reduction in design batch size (GT)85% reduction in effort to track supply chains (Optima) Builders:95% reduction in field rework (DPR)20% improvement in field productivity (DPR)0% reduction in scope (DPR)3

Slide4

Evidence-based management:

metrics on organization and process performance

Multidisciplinary

design optimization (MDO): Automated rapid generation of (thousands of) design alternatives “Big data” Professional VDC Certificate Program

CIFE Current success 4

Slide5

Plus-Delta of Civil and Environmental Engineering

Provides fixed physical assets and wealth of society

High global demand for infrastructure and housing

Opportunity to impact global climate challenge significantly

Low productivity  compete with other ways to spend $High energy use and rising energy costsStructural reliability << societal need (Chile)Environmental degradation

US

Department of Commerce, compiled by P.

Teicholz

Persson

,

Sustainable City of Tomorrow: B01—Experiences of a Swedish Housing exposition

Guilllermo Gomez, PUChile

http://www.ndtv.com/photos/health/health-risks-from-air-pollution-8143/slide/7

5

Slide6

to be the world's premier academic research center for Virtual Design and Construction of Architecture - Engineering - Construction (AEC) industry projects.

Virtual Design and Construction (VDC) is the use of multi-disciplinary performance

models

of design-construction projects, including the Product (i.e., facilities), Organization of the design - construction - operation team and Work Processes in order to support business objectives … … to support exceptionally reliable engineering and management processes to plan, design, construct and operate sustainable facilities

6The CIFE mission

Slide7

to be the world's premier academic research center for Virtual Design and Construction of Architecture - Engineering - Construction (AEC) industry projects

.

Virtual Design and Construction (VDC) is the use of multi-disciplinary performance models of design-construction projects, including the Product (i.e., facilities), Organization of the design - construction - operation team and Work Processes in order to support business objectives … …

to support exceptionally reliable engineering and management processes to plan, design, construct and operate sustainable facilities …is there something better to do to meet these goals?7The CIFE mission

Slide8

CIFE methods

Entirely industry-funded

Needs to simultaneously serve diverse constituents:

(Industrial) sponsors(Academic) stakeholders: dean, facultyStudentsCIFE has a 25 year history8

PracticeResearch

Education

Slide9

Summary of CIFE role

CIFE translational research gives practitioners the opportunity to identify, explore, develop and apply new methods that have great potential value … with low risk and (relatively) low cost

9

Practice

Research

Education

Slide10

VDC elements

10

Slide by Martin Fischer

Slide11

VDC has a management focus

Design of

Product

: classic focus of engineering design and analysisFirst object-oriented CAD models at StanfordOrganization:

Necessary because of complexityProcess and production managementNecessary because projects live over timeEmerged from discipline of CEM, started at Stanford 11

Slide12

Coordination latency (days)

What they are: metrics, target and measured values, status (

R

/G/Y) .

Latency of different teamsManagement objectives and metrics12

Slide13

What they are: metrics, target and measured values, status (

R

/

G/Y) So what: Bloom et al.Management objectives and metrics13

Performance tracks management Management maturity definition

Slide14

14

(Multiple) Predictable performance objectives:

Drivers

Controllable

Process [Conformance to plans]

Outcome [

Project/ Enterprise Performance]

Product, organization, process designs

Latency:

mean <= 1; 95% within 2 working days

Safety:

0 lost hours

Coordination activity

:

planned, explicit, public, informed > 90%

Field-generated Requests for Information

:

0

Schedule

: 1 y Design

< .5 y Construct

95% on-time performance

Facility

managed

Scope

:

100% of items with > 2% of value, time, cost or energy

Rework volume

:

0 (for field construction work); objective = 10-20% (virtual work)

Cost

: >= 95% of budgeted items within 2% of budgeted cost

Prediction basis:

> 80% of predictions founded

*Function (quality) conformance (%):

>= 99%

Quality - Delivered Scope

: 100% satisfaction by POE

Design versions

:

2 or more >= 80%

Schedule conformance (%):

>= 80%

*Sustainability: >

75% better energy, water, materials, than 2002, profitably

Staff trained in VDC:

>= 4/project

Cost conformance (%):

>= 95%

Globalization

: >= 50% of supply and sales

Outcomes: major milestones

Production management: short intervals

Slide15

Performance objectives for DPR - 2018

Production management

[Conformance to plans]

Outcome [

Enterprise Performance]

Latency: mean <= 1; 95% within 2 working days

Safety:

0 lost hours

Field-generated Requests for Information

: 0

Schedule

: 1 y Design

< .5 y Construct

95% on-time performance

Rework volume

: 0 (for field construction work); objective = 10-20% (virtual work)

Cost

: >= 95% of budgeted items within 2% of budgeted cost

*Function (quality) conformance (%):

>= 99%

Quality - Delivered Scope

: 100% satisfaction by POE

Schedule conformance (%):

>= 80%

*Sustainability: >

75% better energy, water, materials, than 2002, profitably

Cost conformance (%):

>= 95%

Globalization

: >= 50% of supply and sales

Staff trained in VDC

: > 90% of all projects have

>= 4 VDC specialists

Other

:

15

Drivers

Courtesy: DPR

Slide16

Broad, disciplined

adoption - field:

Breakthrough

performance objectives for 2015Internal objectivesExternal objectives to clients

16

Slide17

4D+: 4D with analytics

17

Enables:

Multi-disciplinary teams to visualize construction of large (or small) projects andView multi-disciplinary predictions of value and costsOver time

Slide18

Current success story: Multi-disciplinary

design Optimization for AEC

18

Flager: MDO

Slide19

Cloud-based multi-disciplinary design optimization

19

Basbagill, Flager: MDO

Slide20

20

Current success story:

Schedule by exploring many “or” schedule options

Morkos: Space Constraint MDO Method

SCM schedule durations average 47% shorter than LOB

Slide21

(11/212009 from 7:15 PM to 8:15 PM)

Cooling coil and supply air temperature work together as expected

Multi-Purpose Room Supply Air Temp.,

Cooling Coil Valve Position vs. TimeBig data example: data can be readily available; making sense can be hard

Basbagill, Russell-Smith, Wise21Cooling coil valve position open during cold weather

Cooling coil valve position

positively correlates with OAT

Multi-Purpose Room Supply Air Temp.,

Cooling Coil Valve Position vs. OAT

Constant value agrees

with Building EQ pattern…

but no data in warm weather

Slide22

VDC Certificate Program

Big ideas:

The VDC certificate program

is the single most effective CIFE initiative in helping member organizations to get high value from adoption of VDC methods. It provides professional education to enable participants to:Understand basic theory and practice of VDC;

Develop awareness of trends, potential results and issues in using VDC;Develop specific skills in collaborative use of VDC methods.22Photo courtesy DPR

Slide23

Virtual Company

Design the “Big Room”

Design Assist

Process

Virtual Building Tools

Collaborative Planning

Process Metrics

Big Room

Target Costing

Good practice uses multiple VDC methods: DPR

Slide24

(c) 2013

24

Total Economic Impact

Model - GC

<< 2-year paybackPredicted (Higher) profitAssume

: Constant revenues

Lower contract costs

Higher internal costs: 1 FTE

Slide25

(c) 2013

25

Owner investment

Better than GC, Sub

<< 2-year payback

Slide26

to be the world's premier academic research center for Virtual Design and Construction of Architecture - Engineering - Construction (AEC) industry projects.

Virtual Design and Construction (VDC) is the use of multi-disciplinary performance

models

of design-construction projects, including the Product (i.e., facilities), Organization of the design - construction - operation team and Work Processes in order to support business objectives … … to support exceptionally reliable engineering and management processes to plan, design, construct and operate sustainable facilities

26The CIFE mission

Slide27

to be the world's premier academic research center for Virtual Design and Construction of Architecture - Engineering - Construction (AEC) industry projects

.

Virtual Design and Construction (VDC) is the use of multi-disciplinary performance models of design-construction projects, including the Product (i.e., facilities), Organization of the design - construction - operation team and Work Processes in order to support business objectives … …

to support exceptionally reliable engineering and management processes to plan, design, construct and operate sustainable facilities …is there something better to do to meet these goals?27The CIFE mission